Loading...
HomeMy WebLinkAbout607 COWAN STREET - PDP - 35-99A - CORRESPONDENCE - REVISIONS (4)Main Level (including garage / excluding stairs to basement) — 782 s.f. per unit. Second Level (excluding stairs for Main Level) — 656 s.f. per unit. Total gross square footage per unit is 1,438 s.f. Total gross square footage project 1,438 s.f. x 16 = 23,008 s.f. Exceeds allowable for project total by 481 s.f. or 30 s.f. per unit. We will modify our design to account for this discrepancy if required and provide with our final submittal. Please advise. Please note the plans still indicate the previous square foot values. 27. Noted. Will be corrected on final plans. Myrtle Court is the name of the project. Cowan Street Development is the ownership entity. Thank you, Mark 0 Page 5 Department: Advance Planning Topic: General 41. Noted. Department: Current Planning Topic: General 36. Noted. Issue Contact: Karen McWilliams Issue Contact: Bob Barkeen 45. Noted. See revisions to parking. Please advise if this requirement is necessary or in just specific areas due to changes. Department: Natural Resources Issue Contact: Doug Moore 28. Noted. Department: PFA Issue Contact: Michael Chavez 37. Please clarify. All buildings can be accessed from Cowan Street and the Alley. Additionally access is available from the driveways. 38. Noted. 39. Noted. Department: Transportation Planning Topic: General 42. Noted. 43. Noted. 44. Noted. Department: Zoning Topic: Landscaping 25. Noted. Will be updated in final issue. 26. See revised landscape drawings. Topic: Parking 21. See additional parking provided. Issue Contact: Mark Jackson Issue Contact: Peter Barnes Topic: Zoning 23. We have verified that the plans do scale at 1/8" = 1'4Y' as indicated on the drawings. Please indicate specifically where you are finding discrepancies so that we can correct any errors. Our interpretation of 4.7 of the Land Use Standards was that the minimum lot area of 2 times the building(s) is determined by the occupied building square footage. Based on the your stated analysis we have revised our square footage calculations as follows: 0 Page 4 Topic: Site Plan 27, Noted. Easements will be recorded as required.. The 6ft. utility easement along the alley is noted. Department: Natural Resources Topic: 33. Noted. Department: Stormwater Utility Topic: Drainage 57. Noted. See revised civil drawings. 58. Noted. See revised civil drawings. 88. Noted. See revised civil drawings. 89. Noted. See revised civil drawings. 90. Noted. See revised civil drawings. 91. Noted. See revised civil drawings. 102. Noted. See revised civil drawings. 103. Noted. See revised civil drawings. 104. Noted. See revised civil drawings. Topic: Erosion/Sediment Control 32. Noted. See revised civil drawings. 105. 1. Noted. 2. Noted. 3. Will coordinate with contractor. Department: Water Wastewater Topic: Utility Plans 92. Noted. Department: Water Wastewater Topic: Utility Plans 43. Noted. 44. Noted. 82. Noted. 83 Noted. Issue Contact: Doug Moore Issue Contact: Wes Lamarque Issue Contact: Roger Buffington Issue Contact: Jeff Hill 84. Noted. Further field locates are forthcoming and will be provided on final plans. 85. Noted. 86. Noted. 87. Noted. Easement will 6' per Light and Power. 0 Page 3 51. Existing offsite features such as adjacent building context are shown per previous comments to 50' perimeter opposite adjacent streets and property lines. 54. Noted. 61. Noted. Topic: Grading / Erosion Control / Drainage plan 68. See revised plans. Topic: Landscape Plan 93. Noted. 94. Noted. 95. Noted. 96. Noted. 101. Noted. Topic: Site Plan 97. Noted. 98. Noted. Trips are based on required parking and customary use for projects of this scale and type. Further documentation will be forthcoming from our transportation consultant supporting this calculation. Ft. Collins has previously intimated that a traffic study was not required. 99 Noted. 100. Noted. Topic: Utility Plans 62. Noted. 63. Noted. 64. Noted. 65. Noted. Not corrected on this submittal. Will be shown for the final. 66. Noted. Topic: Utility Plans Sheet 2 67. Noted. Topic: Utility Plans Sheet 7 78. Noted. 79. Noted. 80. Noted. 81. Noted. Department: Light & Power Issue Contact: Doug Martine Topic: Landscape Plan 29. Noted. 0 Page 2 TOMAS e LAN G ® a r c h i t e c t s Memorandum To: Bob Barkeen — City of Fort Collins Fax No: 970.416.2020 From: Mark Schlang CC: Mark Brannon Date: 12/19/02 Re: Correction Comments Myrtle Court / Cowan Street Bob, Please note the following response corresponding to staff project review comments for the above referenced project dated July 31, 2002 and August 12, 2002, and your fax correspondence, dated August 12, 2002. Department: Engineering Issue Contact: Katie Moore Topic: Alley plan and profile 23. Noted. 69. Noted. 70. Noted. 71. Noted. 72. Noted. 73. Noted. 74. Drainage information is shown for the streets and alley. Myrtle and Cowan are 100' right of ways. Clarify extent and location of offsite information required. Are you requiring topography on for the properties north of Myrtle, east of Cowan, west of the alley and along the southern property line? 75. Noted. 76. Noted. 77. Noted. Topic: General 47. Noted. We wil request a meeting regarding utility coordination the second week in January subsequent to this submittal. 50. Noted. Access easements will be created for garage accesses. TomasLang Architects, LLC 5777 South Rapp Street Littleton, Colorado 80120 303.795.3004 fax 303.795.3161