Loading...
HomeMy WebLinkAboutLARIMER COUNTY DETENTION COMPLEX, SHERIFF'S ADMINISTRATION BUILDING - SPECIAL SITE PLAN ADVISORY REVIEW - 37-99 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT7. REFERENCES 1. City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards", (SDDCCS), dated May 1984. 2. "Final Drainage Report for Larimer County Detention Center Expansion", TEC, February 1998. 3. "Final Drainage Report and Erosion Control Plan -Advanced Energy Buildings 7 & 8", Park Engineering Consultants, April 7, 1999 4. Soil Survey of Larimer County Area, Colorado. United States Department of Agriculture Soil Conservation Service and Forest Service, 1980. 5. "Soils and Foundation Investigation, Larimer County Sheriffs Adminsitration Building, Lot 24 Prospect Business Park, Fort Collins, Colorado", CT JThompson, Inc., October 19, 1999. 6. "Spring Creek Basin Master Drainageway Plan", Engineering Professionals, Inc., March 1988. 7. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March 1969, and Volume 3, dated September 1992. Final Drainage and Erosion Control Report Page 11 Sheriff's Administration Building November 24, 1999 all 6. strips. The detention pond has a relatively flat bottom that helps slow the velocity of runoff water and aids sediment settling. The retention pond will serve as a settling pond for sediment from runoff water from the parking areas. EROSION CONTROL DURING CONSTRUCTION 6.1 Erosion and Sediment Control Measures Erosion and sedimentation will be controlled during construction by inlet filters, silt fences, gravel construction entrances, seeding and mulching and sediment traps. These measures are designed to limit the overall increase in sediment yield due to construction activities. During overlot and final grading, the soil will be roughened and furrowed perpendicular to the prevailing winds. The placements of these erosion control measures are shown on the Overlot Grading, Drainage and Erosion Control Plan included with this report. 6.2 Permanent Stabilization All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. No soils in areas outside project street rights of way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/ mulch, landscaping, etc.) is installed. Rnal Drainage and Erosion Control Repoli Page 10 Sheriff's Administration Building November 24, 1999 1 5. The size of Pond B was set equal to twice the total volume of runoff from the tributary area generated during a 2-hour, 100-year storm (3.67" total rainfall). The Colorado Urban Hydrograph Procedure (CUHP) was used to calculate the volume of excess runoff to be 1.4 ac-ft. Thus, the minimum retention volume was set to be 2 x 1.4 ac-ft (from CUHP) = 2.8 ac-ft. The proposed Pond B has a volume of 2.9 ac-ft at an elevation of 4899.3 ft-msl and 3.8 ac-ft at an elevation of 4900 ft-msl. Thus, ample retention volume is being provided in the event that two 2-hour, 100-year storms occur back-to-back. The volume of excess runoff during a 24-hr, 100-year storm was also analyzed. The rainfall amount for this storm (5.49") was obtained from Matt Fater with the City of Fort Collins Stormwater Utility. The volume of excess runoff for this storm was calculated to be 2.8 ac- ft. Thus, ample retention volume is available for one 24-hour, 100-year storm event with 0.7-feet of freeboard. If the proposed retention pond overflows, water will exit on the southern portion of the pond and flow south following historical flow patterns. Since a clayey, gravelly sand layer lies 1 to 6-feet below the bottom of the proposed retention pond, it is expected that water in the pond will drain relatively quickly. An analysis of the infiltration. time for the 2.8 ac-ft of storage was completed using Horton's infiltration equation. This infiltration equation is used in the program UDSWM2-PC and is recommended by the city of Fort Collins and the Urban Drainage and Flood Control District. The time of complete infiltration varies depending on the area over which infiltration occurs. The analysis used surface areas of 1.2, 0.75 and 0.40 acres, which approximately represent the top surface area of the pond when full, half full and almost, empty. These infiltration areas gave a retention time in the pond of 55, 88, and 166 hours (2.3, 3.7, and 6.9 days), respectively. Thus, the expected amount of time that it will take Pond B to infiltrate after two consecutive 2-hour, 100-year storm events is less than 7 days. In the event that the pond bottom seals up and no longer infiltrates, pumping of the pond may be required if it becomes a nuisance. Maintenance of the proposed retention pond will be the responsibility of Larimer County. Calculations for the retention pond sizing and infiltration rates are included in Appendix B. WATER QUALITY The quality of stormwater runoff will be enhanced on the Sheriff's Administration site through the use of Best Management Practices (BMP's). Some of the BMP'S include minimizing the amount of directly connected impervious area and using irrigated grass buffer Final Drainage and Erosion Control Report Page 9 Sheriff's Administration Building November 24, 1999 from Pond A was set so that the developed peak flow from the site south of the high point on Midpoint Drive is equal to or less than historic peak flows. The historic peak flow is from historic basins HI and H2. Runoff from subbasin Hl will continue to the south through the undeveloped lot to the south and then to Prospect Business Park Lot 26. This lot diverts a portion of the flows to the west and a portion of the flows to the east into Midpoint Drive. It is estimated that approximately 80% of the flow is carried to the east to Midpoint Drive. Thus, the total historic runoff from the site to Midpoint Drive south is approximately 0.2 cfs (subbasin H2) + 1.7 cfs x 80% (subbasin Hl) = 1.6 cfs. The allowable release from the pond is then 1.6 cfs (historic) —1.1 cfs (subbasin 106) = 0.5 cfs. Pond A was sized using the Rational Volumetric (FAA) Method. The tributary area to Pond A is 3.4 acres with a composite CI00 of 0.44. Given a release rate of 0.5 cfs, the required detention volume is 0.21 ac-ft. The available volume is 0.24 ac-ft at a water surface elevation (WSEL) of 4902.0. This requires ponding at the low point of the entrance drive to a maximum depth of 6". This depth of ponding is within the allowable street flow depth set by Larimer County and City of Fort Collins criteria. Release from the pond will be controlled through a 4" PVC outlet pipe. The emergency spillway for Pond A will be to the east onto Midpoint Drive. Detention volume and outlet sizing calculations are included in Appendix B. 4.2 Retention Pond B A retention pond is being proposed west of the site on the adjoining property owned by Larimer County. As stated in Section 3.1, the retention pond is a temporary pond until a master drainage plan for the Larimer County Detention Center Midpoint Campus can be completed and permanent detention facilities with acceptable drainage outlets can be designed. The geotechnical investigation (CTUThompson, Inc., 1999) indicates that the groundwater surface lies at a depth of 8 to 9 feet at an elevation of approximately 4894.0. This investigation was conducted at a time that is expected to experience the highest groundwater elevation. Thus, the proposed pond was graded so that the lowest point is a minimum of 1- foot above the groundwater. The geotechnical investigation also indicates that the site is underlain a 19-foot layer of medium dense to dense, clayey gravelly sands approximately 8- feet below the existing ground (approx. elevation 4893-4874 ft). Final Drainage and Erosion Control Report Page 8 Sheriff's Administration Building November 24, 1999 r subbasins and Design Points (DP's) associated with this site. Qwr in the table includes applicable carry over flows. Table 3.1 - Developed Conditions DRAINAGE SUMMARY TABLE Design Point Tributary Sub -basin Area (ac) C (10) C (100) tc (10) (min) tc (100) (min) Q(10)tot (cfs) 0(100)tot (cfs) 101 1.38 0.10 0.13 7.4 7.3 0.59 1.5 2 102 2.01 0.52 0.65 7.8 6.4 4.37 11.9 1 101 +102 3.39 0.35 0.44 11.8 8.7 4.21 12.2 3 103 0.32 0.82 1.00 5.0 5.0 1.29 3.2 104 0.98 0.55 0.69 11.3 8.8 1.95 5.5 4 103+104 1.30 0.62 0.77 5.2 5.0 3.80 . 10.0 5 105 0.84 0.45 0.56 9.5 8.3 1.45 3.9 6 106 0.14 0.59 0.74 5.0 5.0 0.41 1.1 4. 3.6 Storm Drainage Structure Design Storm drainage structures for this site includes a sidewalk culvert and a storm outlet pipe for Pond A. The capacity of the sidewalk culvert and the storm pipe was determined using the computer program FlowMaster, which uses Manning's Equation. The proposed 4' concrete sidewalk culvert has capacity to convey peak flows from the 100-year storm. The outlet pipe for Pond A was sized using the orifice equation to determine the diameter needed to appropriately control flows out of the pond. All hydraulic calculations are included in Appendix B, and the location of all storm drainage structures is shown on the Drainage and Erosion Control Plan included in the back pocket of this report. POND DESIGN 4.1 Detention Pond A Detention Pond A is located on the east side of the site and will outlet onto Midpoint Drive. Pond A intercepts and detains stormwater runoff from subbasins 103 and 104. The release Final Drainage and Erosion Control Report Page 7 Sheriff's Administration Building November 24, 1999 3.2 Off -site Flow Routing There are no off -site flows being routed through the Sheriff's Administration Building Site. 3.3 Onsite Flows The site was graded so that stormwater runoff is directed away from the proposed building. The entire site except for Basins 105 and 106 will be directed into the proposed ponds (Pond A & B). Details of the pond design are included in Section 4. A qualitative summarization of the drainage patterns within each sub -basin is provided in the following paragraphs. Subbasin 101 includes the area of Retention Pond B. Runoff from Subbasin 102 is conveyed via sheet flow and gutter flow through the parking lot to the west and to the proposed Retention Pond B. Runoff from Subbasin 103 is conveyed via sheet flow and gutter flow through the proposed parking lot to the east to a mid -block cross pan and sidwalk culvert located at design point 3. Subbasin 104 includes the area of Detention Pond A and the proposed building which is drained via roof drains to Pond A. Runoff from Subbasin 105 is conveyed via overland flow, sheet flow and gutter flow to Midpoint Drive and the existing concrete cross pan at design point 5. The cross pan flows to an existing grass -lined swale and then to the existing Vipont Ponds. Subbasin 106 includes the east portion of the entrance drive. Runoff is conveyed via sheet flow and gutter flow to Midpoint Drive and then south to an existing inlet and then to the City of Fort Collins ponds and finally to the Cache La Poudre River. 3.5 Hydrologic Analysis of the Proposed Drainage Conditions The Rational Method was used to determine the 10-year and 100-year peak runoff rates for each subbasin. Runoff coefficients were assigned utilizing Table 3-2 of the SDDCCS Manual. Rainfall intensity was based on the recently adopted design storm information for Fort Collins. Details of the hydrologic calculations associated with each subbasin are included in Appendix A. Table 3.1 provides a summary of the resulting peak flows for all Final Drainage and Erosion Control Report Page 6 Sheriff's Administration Building November 24, 1999 3. �I PROPOSED DRAINAGE PLAN 3.1 Drainage Design Options Many options for grading and stormwater management were considered for the Sheriff's Administration Building Site. The site is constrained by the lack of underground stormwater drainage facilities adjacent to the property. Installing underground stormwater pipe was considered but is not cost effective for the small amount of allowable discharge from the site. Thus, options that enabled surface discharge onto Midpoint Drive were considered. Option A was to grade the property so that the entire site drained to the east towards Midpoint Drive. This option required a large amount of fill to raise the west portion of the site and required a large detention area adjacent to Midpoint Drive. Taking area out of the lot to the south for detention was not desirable nor was moving the proposed building away from Midpoint Drive. Thus, Option A was not selected. Option B was to grade the site with a high point in the middle of the site and allow a portion of the site to drain to the east and a portion to the west. The landscape area between Midpoint Drive and the proposed building was adequate to accommodate a small detention pond with an outlet onto Midpoint Drive. Both detention and retention were considered to attenuate runoff from the portion of the site draining to the west. A detention pond is preferred. However, designing an outfall for the pond was a problem. Due to grade constraints, it was impossible to construct a detention pond outlet that connected with the existing concrete trickle pan that runs behind Prospect Business Park Lots 27 to 33. Constructing an outlet that discharges into the existing Burlington Northern Railroad ditch is a possibility. However, obtaining a permanent drainage easement and evaluating the hydraulics of the existing ditch is to be completed in a future master drainage plan for the 1mimer County Detention Center. Thus, constructing a retention pond as a temporary drainage solution until a permanent outfall can be found was determined to be the best option. To insure that the current proposal will not preclude future drainage options without retention, the proposed grade of the parking lot was evaluated with respect to the existing concrete trickle pan behind Prospect Business Park Lots 27 to 33. The grade from the proposed low point in the west parking area to the existing concrete pan in Lot 27 is 0.46% indicating that positive drainage off of the site is possible. Final Drainage and Erosion Control Report Page 5 Sheriffs Administration Building November 24, 1999 2.2 Historic Drainage The existing site is covered with native grasses. The site consists of approximately 3.69 acres and can be divided into three drainage subbasins. A small ridge runs along the northern property line so that the majority of the site drains in a southern direction at slopes ranging from 1 to 3 percent. This area is included in historic basin Hl. The southern boundary of subbasin HI follows the limits of the proposed grading. Another ridge runs north to southeast on the eastern portion of the site. The area to the north of the high point in Midpoint Drive drains to an existing mid -block cross pan located at historic design point H3. This cross pan drains to a grass -lined swale that outlets into the existing Vipont Pond which outlets into the City of Fort Collins ponds and then to the Poudre River. The area that drains south of the high point in Midpoint Drive (subbasin H2) is carried approximately 2100-ft south to an existing inlet on Midpoint Drive that outlets into the City of Fort Collins ponds and then to the Poudre River. ' The historic peak flow rates for this site were calculated using the rational method for the 10- year and 100-year storm. Calculations can be found in Appendix A and are summarized in Table 2.1. An exhibit showing the delineation of the historic subbasins is included in the back pocket of this report. I t Table 2.1 Historic Conditions DRAINAGE SUMMARY TABLE Design Point Tributary Sub -basin Area (ac) C (10) C (100) tc (10) (min) tc (100) (min) O(10)tot (cfs) O(100)tot (cfs) HISTORIC BASINS H1 H1 3.07 0.10 0.13 30.5 29.7 0.7 1.7 H2 H2 O.21 0.10 0.13 11.5 1 11.2 1 0.1 1 0.2 H3 H3 1.00 0.34 0.42 9.9 1 9.2 1 1.3 1 3.4 Final Drainage and Erosion Control Report Page 4 Sheriff's Administration Building November 24, 1999 No Text and, therefore, this site is located within the Poudre River Drainage Basin. The Poudre River �j Drainage Basin does not have a City of Fort Collins master plan and detention is not required for this basin. However, per Latimer County requirements, releases from the site must not �1 cause negative impact to downstream drainage facilities and adequate conveyance must be ■i shown from this site to a major drainage outfall. Thus, detention requirements for this.site were based on capacity of the downstream drainage facilities and releasing runoff at historic r; rates. The site is also included in the Larimer County Midpoint Drive Campus Site Master Plan, �I completed by EDAW (1999). According to the EDAW report, the site is above the 100-year floodplain elevation of Spring Creek and the Poudre River. This report also indicated that future stormwater detention facilities could outlet to the west into the Burlington Northern Railroad right of way. Because a conceptual master drainage study for the entire campus has �I yet to be completed, the viability of this option has not been fully investigated. Therefore, the proposed storm drainage plan for the west side of the site is an "interim" condition and is further discussed in Section 11 below. 2. EXISTING SITE CHARACTERISTICS 2.1 Soils The soils for this site are comprised of Caruso clay loam (22) and Table Mountain loam (105) (USDA, 1980). The soils and foundation investigation for the site (CTUThompson, 1999) found stiff to very stiff sandy clay from a depth of 0 to 9 feet. Caruso clay loam �- consists of nearly level soils on low terraces and bottom lands. Some areas are, however, somewhat sloping. Pertinent characteristics of this soil include slow runoff, a slight hazard of wind erosion, and a moderate hazard of water erosion. Caruso clay loam is categorized in Hydrologic Group C. Table Mountain loam consists of nearly level soils on low terraces and bottom lands. Runoff is slow and the hazard of wind and water erosion is slight. Table Mountain loam is categorized in Hydrologic Group B. Figure 2 shows the site overlaid on the soils map from the "Soil Survey for Larimer County Area, Colorado", prepared by the United States Department of Agriculture Soil Conservation Service. Final Drainage and Erosion Control Report Page 2 Sheriff's Administration Building November 24, 1999 �I INTRODUCTION 1.1 Project Location & Description The Larimer County Detention Center Sheriff's Administration Building site is located on Lot 24 of the Prospect East Business Park in the Northwest One -Quarter of Section 20, Township 7 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Unimer County, Colorado. The site is bounded by Midpoint Drive to the east and the Larimer County Detention Center to the north. To the south lies Prospect East Business Park Lot 25 and to the west lies Spring Creek Farm Lot 6, which are both undeveloped and currently owned by Larimer County. A vicinity map is included after the Table of Contents of this report. This project includes the construction of the proposed Larimer County. Sheriff's Administration building and associated parking lots. Future expansions of the proposed building and parking areas are also tentatively planned at this time. The project is part of the Larmier County Detention Facility Campus Master Plan. This report describes the proposed drainage and erosion control plan for the proposed construction. The drainage plan includes consideration of all on -site and tributary off -site runoff. 1.2 Design Criteria & Methods This report was prepared to meet or exceed the submittal requirements established in the " Larimer County Storm -Water Management Manual" (LCS WM Manual), dated April 1979. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, was used. The Rational Method was used to calculate peak 10-year minor and 100-year major runoff values. Detention volume requirements were determined using the Rational Volumetric (FAA) method. Local drainage facilities such. as curb inlets and storm pipes were designed to convey peak flows.. The new rainfall criteria for the City of Fort Collins as amended by Ordinance 42.199 was used in all hydrologic calculations. 1.3 Master Drainage Basin The Spring Creek Master Drainageway Plan, completed by Engineering Professionals, Inc. (1988) indicates the Sheriff's Administration building lies outside of the Spring Creek Basin, Final Drainage and Erosion Control Report Page 1 Sheriffs Administration Building November 24, 1999 0 Q 0 of w z ' J w m H a �o a u o rn 0 �n Cost r Or ri PROSPErT pn T O � u 3 n a o PROJECT SITE CITY C LIMITS n ' March / Ct / o Riverbed o. l a Ct Canton /� A °r Ct � o �j 0 GR</tip or oti �o �Py2� V DRAKE ROAD VICINITY MAP SHERIFF'S ADMINISTRATION SITE NOT TO SCALE TABLE OF CONTENTS PACE 1. INTRODUCTION.......................................................................................................................................1 - 1.1 PROJECT' LOCATION & DESCRIPTION......................................................................................................... 1 1.2 DESIGN CRITERIA & METHODS.................................................................................................................. 1 1.3 MASTER DRAINAGE BASIN ........................................................................................................................ 1 - 2. EXISTING SITE CHARACTERISTICS.................................................................................................. 2 2.1 Solis......................................................................................................................................................... 2 3. PROPOSED DRAINAGE PLAN............................................................................................................... 5 3.1 DRAINAGE DESIGN OPTIONS...................................................................................................................... 5 3.2 OFF -SITE FLow ROUTING........................................................................................................................... 6 _ 3.3 ONsTTEFLows...........................................................................................................................................6 3.5 HYDROLOGIC ANALYSIS OF THE PROPOSED DRAINAGE CONDITIONS......................................................... 6 3.6 STORM DRAINAGE STRUCTURE DESIGN..................................................................................................... 7 4. POND DESIGN............................................................................................................................................ 7 4.1 DETENTION POND A.................................................................................................................................. 7 4.2 RETENTION POND B................................................................................................................................... 8 - 5. WATER QUALITY..................................................................................................................................... 9 6. EROSION CONTROL DURING CONSTRUCTION...........................................................................10 6.1 EROSION AND SEDIMENT CONTROL MEASURES....................................................................................... 10 6.2 PERMANENT STABR ZATION.................................................................................................................... 10 7. REFERENCES..........................................................................................................................................11 ' APPENDIX A - HYDROLOGIC CALCULATIONS APPENDIX B - DETENTION & RETENTION POND DESIGN APPENDIX C - EXCERPTS FROM OTHER REPORTS & CHECK FOR FUTURE OUTFALL Final Drainage and Erosion Control Report Page ii Sheriff's Administration Building November 24, 1999 j][I-Engineering, Ltd. - - 2620 East Prospect Rd. Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 ! FAX (970) 491-9984 - _ www:jreng.com November,24, 1999 Mark Peterson,'P.E. ' Larimer County Engineering P.O. Box'1190 Fort Collins, CO 80522-1190 �. RE: 'Final Drainage and Erosion Control Report for the Larimer-County_ Sheriff s = Administration Building Dear Mark, ' We "are pleased.to submit to you for your review and approval, this Final Drainage and Erosion Control Report for the Larimer County Sheriff's Administration Building. All computations within this report have been completed in compliance with Larimer County and City of Fort - ' Collins Storm Drainage Design Criteria: ' We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. ' Sincerely, JR ENGINEERING Op RED/S ' Prepared by, . Reviewed by, KLO'� :TF9 JWT Dav1 W. Klocke •........4 r7 Senior Project Mana SS/ONAIEN�` Attachment I 4935 North 30th Street 6020 Greenwood Plaza Blvd. 704 Fortino Blvd. West I Colorado Springs, Colorado 80919 Englewood, Colorado 80111 Pueblo, Colorado 81008 (719) 593-2593 • FAX (719) 528-6613 (303) 740-9393 • FAX (303) 721-9019 (719) 583-2575 • FAX (719) 583-8119' FINAL DRAINAGE AND EROSION CONTROL REPORT LARIMER COUNTY DETENTION CENTER SHERIFF'S ADMINISTRATION BUILDING November 24, 1999 Prepared for Larimer County, Colorado Facilities Management 212 West Mountain Avenue Fort Collins, Colorado Prepared by JR Engineering 2620 E. Prospect Road, Suite 190 Fort Collins, Colorado 80525 (970)491-9888 Job Number 9067.11