DECISION
The Hearing Officer hereby approves the Cherokee Flying Heights Project Development
Plan, #17-00 subject to the following condition of approval:
1. That, as an affordable housing project, the units will be required by binding legal
instrument acceptable to the City of Fort Collins and duly recorded with the Larimer
County Clerk and Recorder, to be occupied by and affordable to low-income
households for at least twenty (20) years.
DATED THIS 8th day of May 2002.
Linda C. Michow, Hearing Officer
LC M\57069.20\409503.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Cherokee Flying Heights Project Development Plan - #17-00
Administrative Hearing Date: April 24, 2002
Page 5
Section 3.6.3, addressing street pattern and connectivity standards, provides that all
development plans should provide access to existing and future development. In
order to comply with Section 3.6.3, the plat of the Project incorporates a dedicated
right-of-way for a north -south local connector road, shown as Pennsylvania Street on
the plat. As the staff report states, "Such right-of-way dedication will help facilitate
construction of an interconnected roadway system between Mulberry Street and
LaPorte Avenue, if such system is needed in the future..." The Hearing Officer finds
that this dedication complies with Section 3.6.3.
The Project complies with Section 3.6.4, Transportation Level of Service
Requirements, in that the Applicant's Traffic Impact Study indicates that the
transportation level of service standards are met. In fact, testimony at the hearing by
the City's Traffic Engineer and the Applicant's traffic consultant revealed that the
Traffic Impact Study was submitted under the City's old standards and would not
have been required under the existing standards because the increase in traffic of
10 to 12 peak hour trips and 129 total trips per day would be insignificant. There
was testimony by one resident along South Taft Hill Road that it was difficult to make
turns going northbound on South Taft Hill Road. The City's Traffic Engineer,
Mr. Ward Stanford, testified that it is common on all arterial roadways to experience
difficulty in making turns and that South Taft Hill Road experiences lower traffic
counts than other arterials in the City. Therefore, the Hearing Officer finds, given all
the evidence presented, that the Project complies with Section 3.6.4.
SUMMARY OF CONCLUSIONS
A. The PDP satisfies the development standards of the LMN Zone District.
B. The PDP complies with all applicable district standards of Division 4.4 of the Land
Use Code, Low Density Mixed Use Neighborhood (LMN) zone district.
C. The Project Development Plan complies with all applicable General Development
Standards contained in Article 3 of the Land Use Code.
LCM\57069.20\409603.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Cherokee Flying Heights Project Development Plan - #17-00
Administrative Hearing Date: April 24, 2002
Page 4
Engineering Design Standards. The staff report indicates that the Project complies
with Section 3.3.5 in that it complies with the design standards and specifications for
the applicable departments and agencies.
Building and Project Compatibility. Subsection 3.5.1(B) of the LUC requires that
new developments be designed to be compatible with the established architectural
character of the area. Pursuant to this section, compatibility is achieved through
similar pitched roof forms, fenestration and similar building materials. The staff
report indicates that the proposed single family dwellings are compatible with those
found in the surrounding neighborhoods. Subsection 3.5.1(C) requires that buildings
should be similar in size and height, or if larger, that such buildings be articulated
and subdivided into massing that is proportional to the mass and scale of other
structures. The Project includes some buildings which are taller and more massive
than others in the area. According to the staff report, the larger residential buildings
within the Project have been articulated and subdivided in massing by stepping
down the two-story height in the middle of buildings to one story at the ends of the
buildings. The larger buildings also have hipped roofs and lower eave heights to
further reduce the building mass. In addition, the building materials of board and
batten wood siding, wood trim and asphalt shingle roofs are similar to building
materials in the adjacent neighborhoods.
The Hearing Officer finds, therefore, that the Project is compatible with the
surrounding neighborhoods in terms of architectural character and project
compatibility.
Transportation and Circulation (Traffic). Section 3.6 of the LUC imposes standards
for Master Street Plan compliance, street layout, design, traffic impacts, etc. In
accordance with Section 3.6.1, the Staff report indicates that the Project complies
with the City's Master Street Plan in that 27 '/2 feet of additional right-of-way will be
dedicated to the City via the plat in order to accommodate future improvements such
as wider, detached sidewalks and a full -width bike lane.
The PDP is also in compliance with Section 3.6.2 in that all of the street widths
comply with the Larimer County Urban Area Street Standards. The proposed private
drive meets City standards, except for the length, for which the Applicant received a
variance from the Planning and Zoning Board on June 7, 2001.
LCM\57069.20W 09603.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Cherokee Flying Heights Project Development Plan - #17-00
Administrative Hearing Date: April 24, 2002
Page 3
The Hearing Officer also notes that the Project complies with applicable provisions
of Section 4.4. Specifically, section 4.4(E)(3) provides for a maximum building
height of 2'/2 stories, a standard with which the Project complies.
3. Compliance with Article 3 — General Development Standards: The evidence
presented at the hearing establishes that the Project complies with all of the
applicable requirements of Article 3, as explained below.
Landscaping and Tree Protection. The staff report outlines the Project's
conformance with Section 3.2.1 concerning landscaping and tree protection and
there was no evidence introduced at the hearing to contradict the staff report.
Access, Circulation and Parking. The staff report outlines the Project's conformance
with Section 3.2.2 concerning access, circulation and parking. Specifically, the staff
report notes that the design of the Project provides for:
(1) adequate bicycle parking for 20 bicycles; (2) five foot wide sidewalks running
parallel to the north side of the private drive and parallel to the south property line;
(3) an internal walkway system that is linked to the sidewalk abutting South Taft Hill
Road; (4) required parking lot setbacks; (5) required number of handicap parking
stalls; and (6) 34 off-street parking spaces, as required by Section 3.2.2(K).
There was no evidence introduced at the hearing to contradict the staff report;
therefore, the Hearing Officer finds that the Project is in conformance with
Section 3.2.2.
Engineering Standards. The staff report indicates the Project's general conformance
with Division 3.3 concerning engineering standards. Specifically, the unrefuted
evidence presented at the hearing reflects that the Project complies with the City's
plat standards (Section 3.3.1) and with development improvement standards found
in Section 3.3.2.
Section 3.3.3. Water Hazards. According to the staff report, the Applicant has
prepared a final drainage and erosion control report which illustrates how the PDP
complies with the City's Stormwater Design Criteria and Construction Standards. In
addition, the Project includes a stormwater detention pond on the southeast corner
of the Project site in order to satisfy the City's criteria.
LCM\57069.20\409603.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Cherokee Flying Heights Project Development Plan - #17-00
Administrative Hearing Date: April 24, 2002
Page 2
RECORD OF HEARING: The Hearing Officer accepted during the hearing the
following evidence: (1) Planning Department staff report; (2) application, plans, maps,
reports and other supporting documents submitted by the Applicant and the Applicant's
agents to the City of Fort Collins; (3) written correspondence from members of the
public concerning the Project; (4) photographs taken of the Project; and (5) a tape
recording of testimony provided during the hearing. The Fort Collins Land Use Code
("LUC"), the City's Comprehensive Plan, and the formally promulgated policies of the
City are all considered part of the evidence considered by the Hearing Officer.
FACTS AND FINDINGS
1. The Project's Proposed Uses Are Permitted Uses within the Low Density
Mixed Use Neighborhood (LMN) Zone District: The staff report reveals that the
proposed development is adjacent to the following surrounding zoning and land
uses:
N: LMN detached single family residential
S: LMN TV Repair Shop and detached single family residential
E: POL City park and golf course
W: RL detached single family residential.
The staff report indicates that the residential uses contemplated in the PDP are
permitted within the LMN zone district. No evidence presented at the hearing
contradicted this finding.
Therefore, the Hearing Officer concludes that the proposed uses are permitted
within the LMN zone district.
2. Compliance with LMN District Standards (Article 4): Based on the evidence
presented at the hearing, the Project Development Plan complies with Section 4.4
and the LMN Zone District. Section 4.4(B) of the LUC allows single family attached
and single family detached dwellings subject to administrative review. Public
testimony reflected a concern with the density of the Project. However, the staff
report reflects that the proposed gross residential density of 10.93 dwelling units per
gross acre is in compliance with section 4.4(D)(1)(b), which permits a maximum of
12 units per gross acre for affordable housing projects containing 10 acres or less.
LC M\57069.20\409603.01
V
City of Fort Collins
Community Planning and Environmental Services
Current Planning
CITY OF FORT COLLINS, COLORADO
ADMINISTRATIVE HEARING OFFICER
TYPE 1 ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS, AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
APPLICANT:
April 24, 2002
Cherokee Flying Heights Project Development
Plan — #17-00
Mikal Torgerson
M. Torgerson Architects, P.C.
223 N. College Ave.
Fort Collins, Colorado 80524
OWNER: Jensen Investment Group
1212 S. College Ave.
Fort Collins, Colorado 80524
HEARING OFFICER:
Linda C. Michow, Esq.
Gorsuch Kirgis LLP
Tower I, Suite 1000
1515 Arapahoe Street
Denver, Colorado 80202
PROJECT DESCRIPTION: The Applicant has submitted a Project Development Plan
(referred to herein as the "Project" or the "PDP") proposing a total of 19 units,
designated as affordable housing, on 1.738 acres. The site is located on the west side
of South Taft Hill Road, approximately midway between LaPorte Avenue and Mulberry
Street.
SUMMARY OF HEARING OFFICER DECISION: Approval with conditions.
ZONE DISTRICT: Low Density Mixed Use Neighborhood (LMN).
NOTICE OF PUBLIC HEARING AND NEIGHBORHOOD MEETING: Evidence
presented to the Hearing Officer established that the hearing was properly noticed in
accordance with the City of Fort Collins Land Use Code. City planning staff also held a
neighborhood meeting on July 11, 2001.
PUBLIC HEARING: The Hearing Officer, presiding pursuant to the Fort Collins Land
Use Code, opened the hearing at approximately 6:30 p.m. on April 24, 2002 in the City
Council Chambers at City Hall located at 300 West LaPorte Avenue, Fort Collins,
Colorado.
LC M\57069.20\409603.01
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020