HomeMy WebLinkAboutCHEROKEE FLYING HEIGHTS - PDP - 17-00 - CORRESPONDENCE - REVISIONS (12)attached walk.
3. A note has been added to the landscape plan regarding the
installation prior to CO, or financial guaranty.
4. The maximum building height has been changed to reflect the
actual height of the buildings as shown in the architectural
elevations.
5. The plat has been revised per comments.
6. Monument sign has been removed at zonings request.
7. Building #4 and its building envelope has been moved 4' from the
property line to accommodate the required 15' setback.
8. All site amenities are now coordinated with the landscape plan.
9. It is our belief that a weekly 400' walk would benefit the average
resident.
I trust that after many meetings and a total redesign based on everyones
input, we now have a plan that will meet all applicable criteria.
Please feel free to call if you have any questions, ideas or comments.
Sincerely,
Mikal Torgerson
M. Torgerson Architects
July 28, 2001
Cameron Gloss, AICP
Current Planning Director
City of Fort Collins
281 North College
Fort Collins, CO 80522-0580
Dear Cameron:
Attached is our response to planing comments.
1. Modifications were requested of and granted by the Planning and
Zoning Board that address these issues.
2. A trim board was added between adjacent units to differentiate
units at advanced plannings request. There were also several roof
line changes and the addition of pediments to help provide
additional visual interest.
3. Light and Power had no comment.
4. Several coordination meetings have been held with the Stormwater
Utility Department, and we belive that we have now addressed all
of their concerns.
5. a. We are providing the requested 57' R.O.W. for Pennsylvania
Street as well as the adjacent utility easements. We are not
however providing the actual roadway, as its ultimate design
and disposition has not been determined. The "roadway
width" referred to by Transportation Planning is actually an
emergency access easement meant to accommodate PFA.
b. Bike Parking facilities are now shown on the site plan.
C. Handicap access ramps are now shown on the site and
landscape plans.
6. Building envelopes are now designated on the plat.
7. Traffic Operations had no comment.
8. See engineering response to comments.
9. See engineering response to comments.
10. A detail is provided of the trash enclosure.
11. A fire lane is provided and will be painted and signed as such.
Attached is our response to Zoning comments.
1. Utility meters on buildings are screened by the screen walls as
shown on the architectural elevations. They are also screened by
the landscaping provided for this purpose, refer to landscape plan
2. Street trees have been added along Taft planted T-7' behind the
211 Jefferson