Loading...
HomeMy WebLinkAboutCHEROKEE FLYING HEIGHTS - PDP - 17-00 - CORRESPONDENCE - REVISIONS"vegetative landscaping. 18. All utility meters, HVAC equipment and the like are to be screened as shown on the architectural elevations. All electric vaults are to be "in ground" flush. 19. A detailed lighting plan is provided. All lights will be full cut off fixtures in accordance with 3.2.2 and 3.2.4(A)-(D) 21. We believe that we are complying with all applicable General Development Standards other than the sections that we are seeking a modification for. 22. We have held several utility coordination meeting to coordinate all utilities. Sidewalks, private drives, pedestrian crossing and building siting were also coordinated with all applicable staff members. 23. All certification blocks on the PDP plan are consistent with language in the City of Fort Collins development manual. I trust that after many meetings and a total redesign based on everyone's input, we now have a plan that will meet all applicable criteria. Please feel free to call if you have any questions, ideas or comments. Sincerely, Mikal Torgerson M. Torgerson Architects VM' M_lcrgerson 211 Jefferson Fort/ Eollim, CO 80524 970.416.7431 1,888,416.7431 Fax: 970.416.7435 Email: mikal@archiiex.com hffp://wwwarchilex.com February 13, 2001 Cameron Gloss Director of Current Planning City of Fort Collins 281 North College Fort Collins, CO 80522-0580 Dear Cameron: Attached is our response to planning comments for Cherokee Flying Heights. 2. All plans now note that this is a project development plan and are coordinated with the utility and landscape plans. 3. An overall site plan is now included in our submittal. Land uses and principal structures are noted. 4. There are no required off site easements or off site rights of way. We are dedicating additional right of way for Taft Hill Road and for a future connection in the middle of our site. 5. All building envelope setbacks are dimensioned and labeled. The new Taft Hill R.O.W. is also appropriately labeled. 6. The building envelopes and footprints are now dimensioned to the nearest platted property lines. 7. The PDP plan now shows all temporary and permanent drainage ways and structures. 14. a. All building colors are indicated on the building elevations. Color swatches are included in this submittal. b. As you know, we have had lengthy discussions with staff about building placement. I believe the submitted layout reflects the desires of most staff members. A direct pedestrian connection is provided both for the southerly "carriage houses" and for the buildings on the north side of the project. C. A request for a modification to the standards will be submitted for sections 3.5.1(D); 3.5.2(C)(1); 3.5.2(C)(1)-(2) and 4.5(D)(2)(d). d. A direct walkway, 4.5' wide has been added to the south side of the project. e. 24' back up distance is provided behind the carriage house garages. f. All heights of ridge lines, eaves etc. have been added. 16. A trash & recycling enclosure has been added to the project. A recycling area is provided. This enclosure will be screened by Ilul M forgeison 111 lefferson W Eollim, [0 80514 970.416.7431 1,888,416.7431 fox: 970.416.7435 Email: mikal@archilo.com hHp://wwwatchilex.com