Loading...
HomeMy WebLinkAboutCHEROKEE FLYING HEIGHTS - PDP - 17-00 - CORRESPONDENCE - (7)Jon 14 20 05:44p p.6 3. ADDITIONAL CHARGES These charges apply for unusual conditions: Non -Yielding backfill Remove spoils Saw concrete Replace asphalt Trenching conditions & other $4.11/trench foot .91 /trench foot 4.74/saw foot 52.81/square yard Time & equipment The following additional charges shall apply when frost or frozen soils are encountered: DEPTH OF FROST 0to6" 7" to 12" 13" to 18" 19" to 24" 25" to 30" 3 1 " to 36" 37" to 48" 4. GENERAL CONDITIONS: COST PER LINEAR FOOT OF TRENCH No charge $1.31 1.99 2.98 4.49 6.23 7.61 All fees and estimates are subject to revision and adjustment by the Utility. The Electric Service Rules and Regulations and the Electric Construction Policies, Practices and Procedures apply to all construction and remodeling. Copies available at the Light & Power Service Center, 700 Wood Street or Building Inspection, 281 North College, or call 221-6700. Developers and builders are encouraged to contact the Light & Power Utility at an early stage of development to coordinate the installation of facilities. Estimates and quotations provided free on request, call 221-6700. I. TNGMEERWOGELTSMAMCHR it Jdn 14 20 05:44p p.5 2. COM MRCIAL/INDUSTRIAL Development Charges: Charges to provide primary electric power to the lot comer of a new commercial/ industrial development including streetlighting of (@ $10.49/lineal ft.) dedicated roadways are as follows: $0.03044 Per square foot of lot area. PLUS $24.97 Per lineal foot of property abutting dedicated roadways/drives. Building Site Charges: Charges to provide primary electric power from the lot corner to the transformer for a commercial/industrial building are as follows: $10.49 Per foot of 3 phase primary. $ 5.74 Per foot of 1 phase primary. $1,535.91 Per 3 phase transformer (complete). $ 910.24 Per 1 phase transformer (complete). Entrance capacity charge for each 100 amps of building electrical main breaker: $113.74 Per 100 amps at 208 V. 1 phase $131.24 Per 100 amps at 240 V. 1 phase $197.00 Per 100 amps at 208 V. 3 phase $227.31 Per 100 amps at 240 V. 3 please $454.62 Per 100 amps at 480 V. 3 phase -- Secondary service by builder -- Additional Charges: See paragraph 3. Jan 14 20 05:43p p•4 Utilities light & power • storrnwater • wastewater • water 1999 Phil 1��r�% ESTIMATED LIGHT AND POWER ELECTRIC CHARGES Charges for the installation of the electric utility system are based on electric line extension costs. These fees and unit estimating costs are effective January 4, 1999. 1. RESIDENTIAL Estimated electric fees for an average residential development are as follows: Development Charges: Off Site Facilities, Primary Lines, and Streetlighting of Dedicated Roadways: Per Living Unit Single family** 150 amp maximum $1,310 Single family** 200 amp maximum 1,900 Multi -family non -electric heat X a a Multi -family electric heft 900 Building Site Charges: i Secondary Service Fee* Per Service Single family** 150 amp maximum $399 Single family** 200 amp maximum 521 Multi -family thru 15 plex non -electric heat 521 Multi -family 15 plex thru 24 plex non -electric heat 562 Multi -family thru 9 plex electric heat 562 Services other than above, by Builder. * For service lengths in excess of 65 feet from lot comer, add $4.69 per additional foot. ** 150 amp services are usually adequate for homes of less than 3,000 square feet, not using electric heat. 200 amp services are usually required for homes over 3,000 square feet, or homes using electric heat. Additional Chafes: See paragraph 3 701) Wood St. • PC). N„% 580 • Fort Collins, CO 605.2 0580 • (970) 221-6700 • FAX (910) 27_1-6619 • FAX (970) 221-6593 • TDD (970) 224-6003 n.m�jl: ��(il rj�cuii_i,fgrt-c�llins.m.us • www.ci.fort-collins.cu.usrUTILITIES Ian 14 20 05:45p p.10 walkway" is defined in Article 5 of the LUC as "any street sidewalk, or any walkway that directly connects a building entrance(s) to the street sidewalk... without requiring pedestrians to walk across parking lots or driveways, around buildings, or follow parking lot outlines which are not aligned to a logical route." The development shall be designed to satisfy the requirements of Sections 3.5.1 and 3.5.2. 5. Please indicate all building dimensions, including doors, windows, etcetera, on building elevations. 6. The architectural elevations shall accommodate all provisions of the Land Use Code. n. Delineate all property lines and all rights -of -way widths and street improvements, sidewalk widths and improvements on all plans. o. All signs will require an additional sign permit outside this comment review. p. The burden of demonstrating compliance with all Land Use Code criteria is with the applicant. q. The applicant/developer shall coordinate all emergency and utility infrastructure needs to ensure that all infrastructure provisions are fully met. r. All modifications to code standards will be reviewed by the Planning and Zoning Board. 5 J$n 14 20 05:45p p.9 10. Historic Preservation offers the following comments: a. The existing structures will need to be evaluated for historical significance. b. Demolition evaluation review process needs to be conducted. c. Coordinate all preservation concerns with Historic Preservation. 11. The Current Planning Department offers the following comments: a. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The development review fees are due at the time of submittal of the required Project Development Plan and compliance phases of the development review by City staff and affected outside reviewing agencies. b. Per LUC Section 3.2.1(D)(2) street trees shall be placed at thirty-foot to forty -foot spacing intervals in the center of all parkway areas. The trees shall be placed at least eight (8) feet away from the edges of driveways and alleys, and forty feet (shade trees)/fifteen feet (ornamental trees) (LUC 3.2.1(K) from any street light. All driveway locations and utilities shall be shown to ensure compliance with the Land Use Code. c. Show existing trees (including species and diameter) and designate whether they are to remain or be removed. Tree protection will be required in accordance with Section 3.2.1(F) of the Land Use Code. d. Address all visual clearance and sight distance triangle areas per Section 3.2.1(L) of the Land Use Code. e. Parking areas shall meet all landscape requirements addressed in the Land Use Code including Sections 3.2.1 and 3.2.2. The actual interior parking lot landscaping percentages need to be shown. f. The site/landscape shall accommodate the minimum species diversity is provided in accordance with Section 3.2.1(D)(3) of the Land Use Code. g. Indicate all bus, pedestrian, bicycle, and vehicle circulation routes and loading areas. h. Verification of the irrigation system connection points to ensure all landscaping is continuously maintained per Section 3.2.1 [J]. i. Provide a detailed light plan (spec. sheet for all wall and pole mounted fixtures) insuring that all lighting apparatuses are shielded down, meeting Sections 3.2.4 and 3.2.2. j. Please show and note all exterior mechanical devises, meters, et cetera, must be screened. k. Coordinate the sidewalk system through out the development with Transportation Planning Services. I. All street, pedestrian, bike corridors and mid -block connections shall be accommodated and connect to adjacent and proposed facilities, please contact Kathleen Reavis of Transportation Planning. m. Product Design Concerns: 1. The site plan should include building envelope/footprint dimensions and distance to nearest property lines. 2. Please indicate all building colors on the Building Elevations in accordance with Section 3.5.1(G) of the Land Use Code. 3. Label the appropriate scale(s) for each illustrative elevation and sheet plan. 4. Per Section 3.5.1(D) of the LUC, to the maximum extent feasible, primary facades and entries shall face the adjacent street. If facing a street is not feasible, at a minimum, a main entrance shall face a connecting walkway with a direct pedestrian connection to the street. "Maximum extent feasible" is defined in Article 5 of the LUC as "no feasible and prudent alternative exists, and all possible efforts to comply with the regulation or minimize harm or adverse impacts have been undertaken." "Connecting 4 n Jan 14 20 05:44p P. a c. All street, pedestrian ways internal and external to the site, and bike corridor connections shall be accommodated and connect to adjacent and proposed facilities. 5. The Natural Resources Department offers the following comments: a. Delineate all natural features, as defined in the Land Use Code. b. Prairie dogs on -site need to be accommodated. c. Accommodate potential trail access corridors through Parks and Recreation Planning. d. You will need to file a fugitive dust control permit and coordinate this through the Larimer County Environmental Health Department. Please contact them directly. e. Provide adequate dumpster and trash enclosure area to accommodate a recycling container(s) (see attachment). f. One trash hauler should be used to minimize traffic impact as well as impact on the roads. g. Native grasses and plant materials should be used wherever appropriate and bluegrass should be minimized. 6. Fire Department: a. Please contact Ron Gonzales with Poudre Fire Authority to discuss requirements. b. All addresses shall be visible from a public street (6" numbers on a contrasting background). c. Maximum hydrant spacing for multi -family developments is 600' with a flow rate of 1,500 gallons per minute at 20 psi (no structure further than 300' from a hydrant). d. Need a �`'' dedicated fire access lane (20 foot in width, 40 ton) with a 50-foot radius. Water/Wastewater:. a. 6-inch water and 8-inch sewer in Taft Hill Road. b. 6-inch water and 8-inch sewer in Briarwood. c. Any mains, which have been extended into the site, were never reviewed by the City and do not meet City standards, These lines must be abandoned at the mains in Taft Hill Road. d. The water/sewer services for the existing house must be abandoned (if not used) at the main. e. The water conservation standards for landscape and irrigation will apply to this project, and PIF's and water rights will be due at time of building permit. 6. Light and Power offers the following comments. a. Existing overhead power bisects this property, and can not be removed/relocated until the entire area is converted to underground electric in approximately 2-5 years. b. Buildings must be a minimum of 10 feet from the overhead line. c. The applicant/developer shall acquire all necessary access corridors/easements. d. The normal electric development charges will apply to this project. e. Coordinate all transformer and utility locations with Light and Power. 9. Advance Planning offers the following: a. The development shall comply with all Land Use Code provisions. b. The building placement must provide a direct pedestrian connection to all street sidewalk systems. c. All front facades shall face an adjacent street. 3 Jan 14 20 05:44p p.7 2� n Opv Dv Site 0 2) Division 3.2 Planning and Design Standards 3) Division 3.3 Engineering Standards 4) Division 3.4 Environmental, Natural Area, Recreational and Cultural Resource Protection Standards 5) Division 3.5 Building Standards 6) Division 3.6 Transportation and Circulation 7) Division 3.7 Compact Urban Growth Standards 8) Division 3.8 Supplementary Regulations. d. Please note LUC Section 3.2.2(K) as it regulates parking area requirements. e. Setback requirements are required per LUC Section 3.5.2(D). 2. Stormwater Utility offered the following comments: a. This site is located in the West Vine drainage basin where the new development fee is 99 $7,004/acre and it is subject to the runoff coefficient reduction. The site is in inventory grid #3H. b. The standard drainage and erosion control reports and plans are required and they must be prepared by a professional engineer registered in Colorado. c. The existing foundations would be removed. This should help with the grading issues that previous applicants had proposed. d. Offsite drainage easements may be needed to drain the west side. The site is pretty flat so it may be difficult to drain the entire site to South Taft Hill Road. e. Onsite water quality extended detention and quantity control detention is required. The release rate would be the 2-year historic unless the new West Vine Masterplan identifies a different release rate. f. The West Vine Master Plan is presently being updated. Please contact Susan Hayes for the most current status. She can be reached at 970.4162233. fj, y-7 3. The Engineering Department offers the following comments: `9 a. The standard utility plan and development agreement requirements must be submitted to the City for review and approval. b. Street oversizing fees will apply to this development. The street oversizing fee will be as follows: • Multi -family - $1,021 per dwelling unit c. Please contact Matt Baker for additional information regarding the actual fees related to your proposed development. d. A Transportation Impact Study (TIS) is required with your development plan submittal. To coordinate the parameters of this study, please contact Eric Bracke, City Traffic Engineer, and Kathleen Reavis, City Transportation Planner. e. Roadway improvements to City standards along the property's frontage are required. All street improvements need to meet State and City Street Design Standards. f. Additional right-of-way adjacent to property's frontage may be required. 4. Transportation Planning: a. A Transportation Impact Study (TIS) is required with your Development Plan submittal. To coordinate the parameters of this study, please contact Eric Bracke, the City's Traffic Engineer, and Kathleen Reavis, the City's Transportation Planner. b. The site shall meet ADA requirements. Jan 14 20 05:43p p-2 CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins MEETING DATE: November 15, 1999 ITEM: Cherokee Flying Heights Project Development Plan APPLICANT: Mr. Mikal S. Torgerson 211 Jefferson Fort Collins, CO 80524 LAND USE DATA: Request to develop a 24 unit affordable multi -family development. The site is located at 105 South Taft Hill Road. The comments listed below are conceptual comments based upon a preliminary plan provided at the November 15, 1999 conceptual review meeting. The applicant is expected to apply all pertinent Land Use Code and Street Design Standards in their final design. The comments are to provide a reasonable amount of direction prior to the submittal of a development plan. The following comments shall not preclude staff from making additional comments in the future in regard to overall layout of the site. DEPARTMENTAL CONTACTS Current Planning Ron Fuchs 970.221-6750 Zoning Department Jenny Nuckols 970.221.6760 Engineering Department Dave Stringer 970.221.6605 Street Oversizing Coordinator Matt Baker 970.224.6108 City Traffic Engineer Eric Bracke 970.224.6062 Poudre Fire Authority Ron Gonzales 970.221.6570 Stormwater Utilities Glen Schlueter 970.221.6681 Water & Sewer Utilities Roger Buffington 970.221.6681 Natural Resources Kim Kreimeyer 970.221.6750 Light and Power Doug Martine 970221.6700 Historic Preservation Karen MacWilliams 970.221.6376 Transportation Services Mark Jackson 970.416.2029 Parks and Recreation Janet Meisel -Burns 970.221.6367 .advance Planning Pete Wray 970,221.6376 COMMENTS: 1. The Zoning Department offered the following comments: a. The site is located in the LMN, Low Density Mixed -Use Neighborhood District and the project will be regulated under the Land Use Code (LUC). b. The proposed land development will be subject to a Type 1 review. c. This development must comply with all applicable General Development Standards as set forth in Article 3 of the Land Use Code, including but not limited to the requirements for vehicle and bicycle parking, parking, building setbacks, landscaping, fence screening, et cetera. These development standards are set forth in the following divisions: 1) Division 3.1 General Provisions COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 2{11N.College Ave. P.O. Box580 Fort Collins, CO90522-0.5P.0 (970)221-6750 CURRENT PLANNING DEPAI:TMEN1' Jan 14 20 05:43p p.3 Community Planning and Environmental Services Current Planning City of Fort Collins November 29. 1999 Mr. Mikal S. Torgerson 211 Jefferson Fort Collins, CO 80524 Dear Mr. Torgerson: For your information, attached is a copy of Staff's comments concerning the Development Plan located at 105 South Taft Hill Road presented before the Conceptual Review Team on November 15, 1999. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. The burden of demonstrating compliance with all Land Use Code criteria is with the applicant. Please contact me at 970.221.6750 and/or e-mail: rfuchs(c)ci.fort-collins.co.us if you should have any questions or concerns related to these comments. Sincerely, Ronald G. Fuchs City Planner cc: File Torgerson Cherokee Flying Heights concept review letter 281 North College Avenue • [?O. Box 580 •Fort Collins, CO 805222-0580 • (970) 221 675U •FAX (970) 416-2020