Loading...
HomeMy WebLinkAboutGENERAL CARE HEALTH SERVICES - PDP - 22-00 - DECISION - FINDINGS, CONCLUSIONS & DECISIONeneralCare Health Services I-_,� Administrative Hearing February 1, 2001 Page 8 of 8 STAFF RECOMMENDATION Staff recommends approval of the Generalcare Health Services, Project Development Plan, Current Planning File # 22-00. FINDINGS AND CONCLUSIONS After reviewing the staff report and the record of the public hearing, the Hearing Officer makes the following findings and conclusions: A. The Generalcare Health Services Project Development Plan is subject to administrative review and the requirements of the Land Use Code (LUC). B. The Generalcare Health Services Project Development Plan conforms to standards of the CCR zoning district. C. The Generalcare Health Services Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. D. Future development of the property will be required to meet Land Use Code Division 2.6 DEVELOPMENT CONSTRUCTION PERMITS; and, Division 2.7 BUILDING PERMITS. DECISION Based on the findings and conclusions, the request for the Generalcare Health Services Project Development Plan is approved with the following conditions: 1. The applicant shall ensure that the building basement is limited in use to a storage and mechanical equipment area. 2. This approval is contingent upon execution and recordation of a Quit Claim Deed for the former Hoffman Mill Rd. right-of-way. Dated this 16th day of February 2001, per authority granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. Cameron Gloss Current Planning Director eneralCare Health Services F-,.P Administrative Hearing February 1, 2001 Page 7 of 8 design scheme of the site so that these uses are screened and out of view of high visibility areas. 2. Mixed -Use, Institutional and Commercial Buildings [3.5.3] — The proposed building is in conformance with the prescribed build -to line, satisfies the variation in massing, fagade treatment, entrance treatment, and the base and top treatment requirements, therefore the application satisfies the requirements of this section of the code. D. Transportation and Circulation [3.6] Master Street Plan [3.6.1] —Lemay Avenue is designated as a 4-lane arterial on the Master Street Plan. It is currently built as a 4-lane arterial designed to old standards. The proposed development provides an additional dedication of 7.5 feet of right-of-way in order to fulfill the current required street right-of- way width of today's standards. 2. Transportation Level of Service Requirements [3.6.4] — The Transportation Planning Department has determined that the project meets the applicable Level of Service(LOS) requirements. 3. Transit Facilities Standards [3.6.5] — There is an existing Transfort route that goes down Riverside Avenue and Lemay Avenue. Employees and customers can utilize this existing system including the existing bus stops. FINDINGS OF FACT After reviewing the Generalcare Health Services, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The proposed land uses are permitted in the (CCR) Community Commercial, Poudre River zone district. 2. The Project Development Plan complies with all applicable district standards of Section 4.16 of the Land Use Code, the (CCR) Community Commercial, Poudre River zone district. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. eneralCare Health Services F r� Administrative Hearing February 1, 2001 Page 6 of 8 and 3pm on December 215t. The physical elements of the development plan are located and designed in a way that will not cast a shadow onto structures within the site or on adjacent property greater than allowed in this section. 4. Site Lighting — [3.2.4] — As required the applicant is using lighting fixtures that are concealed and fully shielded featuring sharp cut-off capability which reduces up -light, spill -light, glare and unnecessary diffusion on adjacent property. The maximum and minimum lighting on -site lighting levels are in compliance with this section. B. Engineering Standards [3.3] 1. Plat Standards [3.3.1 ] The plat has been reviewed against the criteria of the Plat Standards under Article Three, Division Three of the Land Use Code. The request to create a 48,508 sq. ft. lot complies with the following standards: • Lots [3.3.1(B)(1)] - The new lot has frontage along Lemay Avenue, Poudre River Drive and Hoffman Mill Road, all dedicated public right-of-ways. Vehicular access will be off of Hoffman Mill Road. Side lot lines are substantially at right angles or radial to the street line. The lot layout is consistent with the Poudre River Business Park Master Plan and meets the City's street connectivity standards to the extent feasible. • Public Sites, Reservations, and Dedications [3.3.1(C)(1)] - The plat indicates proper dedications for drainage and utility easements as needed to serve the lot. In order for the City of Fort Collins to obtain the ultimate right-of-way for a potential future T- intersection of Hoffman Mill Road in the southeast corner of the site, additional right of way has been dedicated to the city. 2. Water Hazards [3.3.3] — The PDP has been reviewed by and complies with the requirements of the Stormwater Department. 3. Engineering Design Standards [3.3.5] — This project complies with all design standards, requirements, and specifications for all of the commenting departments and agencies. C. Building Standards [3.5] 1. Building and Project Compatibility [3.5.1 ] —The proposed masonry building with a 6:12 pitched roof and individually defined casement windows is compatible with the established architectural character and materials of buildings in the surrounding area. Utility meters, trash collection, and other service functions are incorporated into the overall eneralCare Health Services F Administrative Hearing February 1, 2001 Page 5 of 8 • Safety Considerations [3.2.2(C)(1)] — Pedestrians are separated from vehicles and bicycles to the maximum extent feasible, thereby satisfying this requirement. • Curbcuts and Ramps [3.2.2(C)(2)] — Ramps are provided for the sidewalk where the sidewalk crosses the parking lot, and a ramp is also provided for the handicap parking space to give access to the front door, thereby satisfying this requirement. • Bicycle Facilities [3.2.2(C)(4)] — A bicycle rack is being provided near the main entrance to the new building, thereby satisfying this requirement. • Walkways [3.2.2(C)(5)] — A grade separated sidewalk directly connects the street sidewalk with the main entrance of the new building without requiring a pedestrian to cross a drive aisle or vehicle area, thereby satisfying this requirement. • Access and Parking Lot Requirements [3.2.2(D)] — Vehicle areas are clearly separated from walkway areas. Unobstructed vehicular access is provided from the public street to all parking spaces. All off-street parking areas are surfaced with materials in conformance with city specifications. The project therefore complies with access and parking lot requirements. • Parking Lot Layout [3.2.2(E)] — The parking lot provides well-defined circulation routes for vehicles, bicycles and pedestrians. Landscaped peninsulas with raised curbs define parking lot entrances and the end of parking aisles. The proposed plan provides continuous, direct pedestrian access with a minimum of driveway and drive aisle crossings. No parking bays extend more than 13 spaces without an intervening landscape peninsula. • Required Number of Spaces for Type of Use [3.2.2(K)] — The proposed building has 8626 square feet of medical office use, which is limited to a maximum of 4.5 spaces per 1000 square feet of gross leasable area. The proposed medical office use is allowed 38 spaces. The site plan shows 36 parking spaces, thereby satisfying the maximum parking space limitation. • Handicap Parking - [3.2.2(K)(4)] —The applicant has provided two handicap spaces, therefore the application satisfies this requirement. • Parking Stall Dimensions - [3.2.2(L)] — The standard parking stalls are 9'x18'. The stall length requirement is 19 feet long unless the stalls allow for a 2' overhang with a curb or wheel stop provided. The proposed parking lot provides a qualifying 2' overhang area for the stalls, therefore is in conformance with the required stall size requirement. 3. Solar Access, Orientation, Shading [3.2.3] — The proposed plan is designed in a way that protects its roofs access to sunshine between gam eneralCare Health Services E _d Administrative Hearing February 1, 2001 Page 4 of 8 The Project Development Plan complies with all applicable General Development Standards as follows: A. Site Planning and Design Standards [3.2] 1. Landscaping and Tree Protection [3.2.1] • Full Tree Stocking [3.2.1(D)(1)(c)] — Full tree stocking is required in all landscaped areas within 50 feet of any building along high use or high visibility sides. Full tree stocking is formal or informal groupings of trees planted at 30' to 40' spacing intervals for canopy shade trees, or at 20' to 30' spacing intervals for coniferous evergreens or ornamental trees. The proposed site plan satisfies this standard. • Street Trees [3.2.1(D)(2)] — Street trees are required at 30 to 40 foot spacing along adjacent streets. The applicant satisfies this standard. • Minimum Species Diversity [3.2.1(D)(3)] — Based on the total proposed number of new trees (49), the applicant would be allowed to have up to 25% of any one species (12), but has only proposed a maximum of 9 of one species, therefore satisfies the minimum species diversity requirement. • Foundation Plantings [3.2.1(E)(2)(d)] —Ali exposed sections of building walls have planting beds of at least 5 feet in width. The landscape plan therefore satisfies the foundation plantings requirement. • Parking Lot Perimeter Landscaping [3.2.1(E)(4)] —Trees are provided at the required 1 tree per 40 feet around the parking lot. The parking lot is also screened by plant material from the abutting Poudre River Drive and Hoffman Mill Road. The landscape plan therefore satisfies the parking lot perimeter landscaping requirement. • Parking Lot Interior Landscaping [3.2.1(E)(5)] — The parking lot area on the site plan is required to devote at least 6% of the area of the parking lot to landscaped areas. There are eight landscape peninsulas proposed within the parking lot, which together satisfy the 6% minimum area for landscaping requirement. • Screening [3.2.1(E)(6)] — Landscape and building elements are placed to adequately screen areas of low visual interest and visually intrusive site elements including the trash enclosure area. • Utilities [3.2.1(K)] — The landscape and utility plans have been coordinated and the required tree/utility separations have been provided, thereby satisfying this standard. 2. Access, Circulation and Parking [3.2.2] eneralCare Health Services F ter' Administrative Hearing February 1, 2001 Page 3 of 8 BACKGROUND The staff report states the following: Background The surrounding zoning and land uses are as follows: N: CCR; Poudre River Drive, Existing medical clinic RC; Vacant property, POL; Poudre River Trail, Poudre River, S: CCR: Burlington Northern and Santa Fe Railroad right-of-way, I; Riverside Avenue, E; Existing restaurants, existing tire store, existing credit union, E: CCR; Hoffman Mill Road, Burlington Northern and Santa Fe Railroad right-of-way, vacant property, SE: E; Existing auto repair shop, existing glass shop, W: CCR; Lemay Avenue, Burlington Northern and Santa Fe Railroad right-of-way, SW: NC; Intersection of Riverside Avenue and Lemay Avenue, shopping center anchored by Albertson's and Longs Drugs, bank, restaurants. The property was annexed as part of two different annexations. The majority of the property was annexed in June of 1983 as part of the Riverside-Lemay Annexation. A portion of the property was annexed in April of 1989 as part of the Lemay Avenue First Annexation. 2. Division 4.16 of the Land Use Code, Employment District (E) The proposed use of "clinic" is a permitted use in the (CCR) Community Commercial, Poudre River Zoning District subject to administrative review. The PDP meets the applicable Development Standards [4.16(D)] as follows: • The street connections, building massing and placement, building character and image, building color/materials, and the landscaping site design are all compliant with the standards of this section. 3. Article 3 of the Land Use Code — General Development Standards eneralCare Health Services r �P Administrative (IHearing February 1, 2001 Page 2 of 8 STAFF RECOMMENDATION: Approval HEARING OFFICER DECISION: Approval ZONING DISTRICT: CCR— Community Commercial River NOTICE OF PUBLIC HEARING: Notice of public hearing was made on January 18 by mailing to property owners within 1,000 feet of the subject property. The public hearing was advertised in the Coloradoan. PUBLIC HEARING After reviewing the Staff Report and recommendation, a public hearing was held on the subject application at 2:00 PM on February 1, 2001. The hearing was held in Conference Room D at 281 North College, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The following is a list of those who attended the meeting: From the City: Troy Jones, City Planner Marc Virata, Development Review Engineer From the Applicant: Charles Hatchette, Applicant Alan Hauser, Architect Written Comments: ►= Commi ty Planning and Environmental rvices Current Planning City of Fort Collins CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION HEARING OFFICER: Cameron Gloss Current Planning Director PROJECT NAME: Generalcare Health Services Project Development Plan CASE NUMBER: #22-00 APPLICANT: Alan Hauser Architecture One 150 E. 29th Street Loveland, CO 80538 OWNER: Charles S. Hatchette Generalcare Medical Services, Inc. 700 East Elizabeth Street Fort Collins, CO 80524 PROJECT DESCRIPTION: Generalcare Medical Services, Inc. is proposing to develop an 8,626 square foot medical clinic building with a 2,730 square foot basement for storage and mechanical equipment. The 1.1 acre site is located east of Lemay Avenue, south of Poudre River Drive, west of Hoffman Mill Road, and north of the Burlington Northern Railroad tracks. The property is located in the Community Commercial, Poudre River (CCR) zone district. SUMMARY OF RECOMMENDATION AND DECISION: The proposed land use is permitted in the CCR zone district subject to a type 1 review. The Project Development Plan complies with all applicable district standards of Section 4.16 of the Land Use Code, (CCR) Community Commercial, Poudre River zone district. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020