HomeMy WebLinkAboutGENERAL CARE HEALTH SERVICES - PDP - 22-00 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETG
Date: f-7��<!:!5
Planer: Traffic Operation:
kemi Requested
Site I land Plat I U014 I Drainage R t Other Itemi Required
Engineering ,v I a- X
Redlined Items Being Returned
Site I land Plat I Ufillty Drainage R t I Other Items Being Returned
Stormwater
--
Water/Waitewate
1rafllcOperatloni
x
x
x
x/
K
Trans. Planning
)rj
ec-
Tran(ort
Natural Rtiourm
X
X—
Park Planning
Totals
3
i
Other:
Note: All redlined items ihould be returned with the reiubmittaV rMilon.
III
Revisions Routin'Sheet
--�.
Item: 77,
Date: �?`K
AP� : 12�1212baC� '�
o
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
V
NG INSPECTION
& POWER
G / DRAFTING
RY
FIRE / —
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THO.NIPSON
CABLE TV -7—,4�7— 1 1
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
TOTAL [
I Rcr. S-07_97
I