Loading...
HomeMy WebLinkAboutRICHIE'S EXPRESS CARWASH - PDP - 15-00 - DECISION - FINDINGS, CONCLUSIONS & DECISIONFINDINGS AND CONCLUSIONS After reviewing the staff report and the record of the public hearing, the Hearing Officer makes the following findings and conclusions: A. Richie's Express Carwash Project Development Plan is subject to administrative review and the requirements of the Land Use Code (LUC). B. Richie's Express Carwash Project Development Plan conforms to standards of the C, Commercial zoning district. C. Richie's Express Carwash Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. , D. Future development of the property will be required to meet Land Use Code Division 2.6 DEVELOPMENT CONSTRUCTION PERMITS; and, Division 2.7 BUILDING PERMITS. DECISION Based on the findings and conclusions, the request for the Richie's Express Carwash Project Development Plan is approved. Dated this 7th day of May 2001, per authority *granted by Sections 1.4.9(E) and 2.1 of the Land Use Code. ;�0 Arira�40f Kenneth G. Waido, Chief Planner Advance Planning Department Building materials will be similar to those on the existing Compass Bank building to the north.. 2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings The applicant was granted a Modification of Standard to the LUC Sections 3.5.3(B)(2)(b) and (c) by the Planning and Zoning Board. The modification allows the building to exceed the maximum building setback requirements of 15' from Foothills Parkway and 10' to 25' from South College Avenue. As part of Staffs analysis of the modification request it was determined that car washes are exempt from providing direct connecting walkways to adjacent properties. See the attached Staff Report dated 12/07/00. 4. Neighborhood Information Meeting The Richie's Express Carwash, PDP contains a proposed land use that is permitted as a Type I use, subject to an administrative review. The proposed use is an automated car wash and constitutes a relatively small infill redevelopment in the midst of existing commercial/retail uses in the South College Avenue commercial corridor. The LUC does not require that a neighborhood meeting be held for a Type I development proposal and a neighborhood meeting was not held to discuss this proposal. FINDINGS OF FACT/CONCLUSIONS After reviewing the Richie's Express Carwash, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The proposed land use is permitted in the C — Commercial zone district. 2. The Project Development Plan complies with all applicable district standards of Section 4.17 of the Land Use Code, C zone district. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. STAFF RECOMMENDATION Staff recommends approval of the Richie's Express Carwash, Project Development Plan - #15-00. 2. Section 3.2.2, Access, Circulation and Parking a. The proposal complies with Section 3.2.2(C)(4)(a) in that it provides secure and conveniently located bicycle parking near the front entry to the building, with the amount of bicycle parking exceeding the minimum requirement of 5% of the automobile parking spaces on -site. b. The proposal complies with Section 3.2.2(C)(5) in that it provides direct, safe, and continuous walkways and bicycle connections to major pedestrian and bicycle destinations in the surrounding area via an enhanced crosswalk between the front entry of the building and the sidewalk along South College Avenue. c. The proposal complies with Section 3.2.2(D) in that it provides for safe, convenient, and efficient bicycle, pedestrian, and vehicular movement to and through the site. Vehicular access and egress will occur via two curb cuts on Foothills Parkway and a one-way driveway into the northeast corner of the site from the existing frontage road along South College Avenue. d. The proposal complies with Section 3.2.2(K)(2)(a) in that the project will provide 4 long-term (employee and handicapped) parking spaces on -site, which is fewer than the allowable 24 spaces maximum (5/1,000 square feet of gross leasable floor area) for a vehicle servicing and maintenance (car wash) facility. There will be 12 parking bays for auto vacuum units. B. Division 3.3, Engineering Standards 1. Section 3.3.5, Engineering Design Standards The proposal complies with the design standards, requirements, and specifications for the services as set forth in this section. C. Division 3.5, Building Standards 1. Section 3.5.1, Building and Project Compatibility a. The proposal complies with Section 3.5.1(D) in that the primary fagade and entry faces South College Avenue, to the east. There is a connecting walkway, with an enhanced pedestrian connection across a 15' wide driveway, to the sidewalk along South College Avenue. b. The proposal complies with Sections 3.5.1(F) and (G). The building will be a 1-story structure with a flat roof (running east -west on -site). The building will be 18' to 19' in height, and will be constructed of red brick. 2. Division 4.17 of the Land Use Code, Commercial Zone District The proposed use of an automated car wash facility is permitted in the C zone district subject to an administrative review. The PDP meets the applicable Land Use and Development Standards in the C zone district. 3. Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable General Development Standards as follows: A. Division 3.2, Site Planning and Design Standards 1. Section 3.2.1, Landscaping and Tree Protection a. The proposal complies with Section 3.2.1(D)(1)(c) in that it provides "full tree stocking" within 50' of the building, according the standards as set forth in this section. b. The proposal complies with Section 3.2.1(D)(2)(a) and (b) in that canopy shade (street) trees are provided at a 30' spacing along Foothills Parkway behind the existing attached sidewalk and at a 40' spacing along South College Avenue in the proposed 12' wide parkway between the street and the new detached sidewalk. c. The proposal complies with Section 3.2.1(D)(3) in that no one species of tree on the development plan exceeds 33% of the total of 34 new trees on -site. d. The proposal complies with Section 3.2.1(E)(4)(a) in that trees are provided at a ratio of no more that 25 lineal feet along South College Avenue and Foothills Parkway (public streets) and no more than 40 lineal feet along the north lot line in the parking lot setbacks. The south line of the property is within the Larimer County Canal No. 2 Ditch Company easement, where tree and shrub plantings are controlled and limited by the ditch company. e. The proposal complies with Section 3.2.1(E)(4)(b) in that the on -site parking areas will be screened from the adjacent street and properties to the south and west with shrub plantings that will block at least 75% of the vehicle headlights and extend for more than 70% of the street frontage and property line along the parking areas. f. The proposal complies with Section 3.2.1(E)(5) in that it provides approximately 10% interior landscaping in the parking and vehicle use areas, exceeding the minimum requirement of 6%. standards located in Division 4.17 Commercial District (C) of ARTICLE 4 — DISTRICTS. Vehicle minor repair, servicing and maintenance establishments (including car washes) are permitted in the C — Commercial Zoning District, subject to administrative (Type 1) review. The C District is: Intended to be a setting for development, redevelopment and infill of a wide range of community and regional retail uses, offices and personal and business services. Secondarily, it can accommodate a wide range of other uses including creative forms of housing. While some Commercial District areas may continue to meet the need for auto - related and other auto -oriented uses, it is the City's intent that the Commercial District emphasize safe and convenient personal mobility in many forms, with planning and design that accommodates pedestrians. This proposal complies with the purpose of the C District as it is redevelopment of infill property in the commercial corridor along South College Avenue. The previous use was an auto tire store. This proposed automated car wash facility is an auto-related/auto- oriented land use that will provide pedestrian access to and from the site from the sidewalk system along South College Avenue. COMMENTS: 1. Background The surrounding zoning and land uses are as follows: N: C; existing bank (Compass Bank) S: C; existing shopping center (Crystal Gardens) E: C; existing shopping center (Foothills Fashion Mall) W: C; existing commercial (Alfalfa's Market, Wilbur's Beverage Nation) The property was annexed in November, 1970, as part of the South College First Annexation. The property has not been previously platted. A subdivision plat is being reviewed as part of this development request. The existing building was approved and constructed as a permitted "use by right", date uncertain. PUBLIC HEARING After reviewing the Staff Report and recommendation, a public hearing was held on the subject application at 3:00 PM on May 3, 2001. The hearing was held in Conference Room B at 281 North College, Fort Collins, Colorado. HEARING TESTIMONY. WRITTEN COMMENTS AND OTHER EVIDENCE: The following is a list of those who attended the meeting: From the City: Steve Olt, City Planner From the Applicant: Vaughn Furness, Project Planner/Architect Dick Rutherford, Project Engineer Tom Frank, Richie's Fort Collins Express Carwash, LLC Jim Frank, Richie's Fort Collins Express Carwash, LLC Jeff Quinn, Richie's Fort Collins Express Carwash, LLC John Dougherty, Current Property Owner John Moen, Larimer County Canal No. 2 Irrigating Company Written Comments: None BACKGROUND The staff report states the following: EXECUTIVE SUMMARY: This PDP complies with the applicable requirements of the Land Use Code L( UC), more specifically: the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; standards located in Division 3.2 - Site Planning and Design Standards and Division 3.5 - Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; and Commu y Planning and Environmental vices Current Planning City of Fort Collins CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION HEARING OFFICER: PROJECT NAME: CASE NUMBER: Ken Waido Chief Planner, Advance Planning Department Richie's Express Carwash, Project Development Plan f#22-98A- )�-/_5�-av APPLICANT: Jim Sell Design, Inc. c/o Vaughn Furness 153 West Mountain Avenue Fort Collins, CO. 80524 OWNER: Richie's Fort Collins Express Carwash, LLC c/o James R. Frank P.O. Box 272548 Fort Collins, CO. 80527 PROJECT DESCRIPTION: This is a request for 1-story, 4,900 square foot building, to be used as an automated car wash facility, on a 1.22 acre site located at the southwest corner of South College Avenue and Foothills Parkway. The property is just south of the existing Compass Bank building and is in the C — Commercial Zoning District. STAFF RECOMMENDATION: Approval HEARING OFFICER DECISION: Approval ZONING DISTRICT: C, Commercial NOTICE OF PUBLIC HEARING: Notice of public hearing was made on April 19, 2001 by mailing to property owners within a minimum of 500 feet of the subject property. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020