Loading...
HomeMy WebLinkAboutRICHIE'S EXPRESS CARWASH - PDP - 15-00 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS7df� 1'�429iL1�2 0104721 MV4-2 /VG..2921Vej74479jVq eGiL MIVII Pads O#ire Baz 506 9at1 BoUiKE, Goa&" 90522-0506 `7s&pAo": (970) 482-47f0 46cd4": (970) 492-4729 March 21, 2000 Mr. James R. Frank, Manager Richie's Express Carwash LLC PO Box 272548 Fort Collins, Colorado 80527 RE: 3141 South College Avenue, Fort Collins, Colorado #15-00 Richie's Express Carwash - Type I - PDP (LUC) Dear Mr. Frank:. I am the Secretary/Treasurer for The Larimer County Canal No. 2 Irrigating Company, whose ditch would be impacted by the proposed landscaping plan for Richie's Express Carwash in Fort Collins,. Colorado.. It is our understanding that some extra landscapin.g, including trees and - hedges, may be required by The City of Fort Collins. The Larimer County Canal No. 2 Irrigating Company has the right and obligation to maintain and clean its ditch. The Company vigorously opposes the planting of any trees and/or hedges in the Company's right-of-way. The Ditch Superintendent will remove, without notice to any party, any and all bushes or trees that interfere with his ability to yaintain and clean the ditch. ams. Please let me know if you have any questions. cr Gene E. Fischer Secretary and Legal Counsel Ap --VA O WIN oil ATTACHMENT III Context Diagram E:\DWG\v1988\1988pdp.doc ATTACHMENT II Legal Description City of Fort Collins, County of Larimer, State of Colorado Amended Tire Shoppe Tract: A tract of land situate in the Southeast 1/4 of Section 26, Township 7 -North, Range 69 West of the 6'" P.M., City of Fort Collins, County of Larimu, State.,of Colorado and a part of Tract "A," Mourning Subdivision which is all more particularly described as follows:_ Considering the East line of the said Southeast 1/4 as bearing S 00°. 19'00" W and with all bearings contained herein relative thereto is contained within the. boundary lines which begin at a point on the West line of U.S. Highway No. 287 which boars N 89' 43' 00" W 50.00 feet and again S 00° 19'00" W 870.81 feet from the East '/a corner of said Section 26 and run thence along the said West line, S •000 19'00" W 86.80 feet and again S 00' 05'00" E 113.20 feet; thence N 890 45'00" W 300 00 feet; thence N 00' 19'00" E 35.00 feet; thence N 89° 45'00" W 120.00 feet; thence N 00' 19'00" E 14.69 feet to a point on the Southeasterly line of Foothills Drive; thence along the said Southeasterly line Y along the arc of. a 160.00 foot radius curve to the left a distance of 99.13 feet, the long chord of which bears N 470 45'00" E 97.57 feet and again N 30' 00' 00"`E 33.32 feet;4hence S 60 00' 00" E 36.42 feet;. thence N 30' 00' 00" E 44.39 feet; thence S 89' 45' 00" E 93:94 feet; thence N 00' 15' 00" E 35.00 feet to a point on the South line. of Lot 3; Mourning Subdivision;. thence S 89° 45' 00" E 183.33 feet, along the said South line to the point of beginning, containing 63,083 square feet more or less. i E:\DWG\v1988\1988pdp.doc 13 Thank you for your consideration and we look forward to working with you throughout the develorment review process. Sincerely, JIM SELL DESIGN, Inc. L. Vaughn Furness E:\DWG\v1988\1988pdp.doc r '14 E E 8) Light and Power: a) A C-1 form will -be filed with Light and Power prior to building permit issuance. b) The Owner shall acquire all necessary access corridors and easements. c) The Owner shall pay all normal electrical fees. d) The Owner shall coordinate all utility locations with Light and Power. 9) Current Planning Department: a) Development Review Fees will be paid at time of submittals. b) Street trees shall be planted as required by the Land Use Code. c) The minimum species diversity has been met. d) All existing trees are shown and labeled either remove or to remain and protect. Tree protection shall meet the Land Use Code requirements. e) All street, pedestrian, and bike corridors have been accommodated as best as the site will allow. f) Design considerations: i) The site plan shows building footprint dimensions and distance to the nearest property lines. ii) Building colors are indicated on Building Elevations. iii)- Appropriate scales have been labeled on site plans and elevations. iv) The Architectural Elevations accommodate all provisions of the Land Use Code. v) The building has been oriented to have the main entrance to the office portion of the building face the connecting walk to College Avenue. vi) All building dimensions have been indicated on building elevations and site . plans. g) All property lines and all rights -of -way, sidewalk widths and improvements. are delineated on Site Plans and Plat. h) The plan meets all provisions as outlined in the C-Commercial Zone District of the Land Use Code. i) The proposed plan has 6 employees parking, one of which is for disabled parking. There are 18 vacuum stations. The proposed plan is to reconfigure the existing bank property to accommodate more efficient and clearly designated parking, see plan and.project description. j) The applicant and developer shall, coordinate all emergency and utility infrastructure tcrensure that all infrastructure provisions are fully met. k) Noted, -the burden of demonstrating compliance with all Land Use Code criteria is with the applicant and developer. 1) All modifications to code standards will be reviewed by the Planning and Zoning Board. There are currently no requested modifications. 10)Historic Preservation: a) The existing building is not eligible for historic preservation. • E:\DWG\v1988\1988pdp.doc 13 c) A Traffic Impact Study'has been submitted. d) See site plan for roadway improvements along property's frontages. e) Adequate access has been provided'for, see site plan. . f) Access controls have been incorporated into the site plan for ingress and egress along Foothills Parkway. g) The vacation of the Frontage Road right-of-way will not occur with this project. h) The,vacation of existing access easements and the dedication of new access easements shall be coordinated and reviewed by the City. i) There are no access corridor or easements that the developer will need to acquire for this proposed PDP. 4) Transportation Planning, Traffic Operations, Transfort: a) A Traffic Impact Study has been submitted. b) The site has 1 ADA parking for potential disabled employees. The site shall be planned to meet ADA requirements. c) Noted. 5) Natural Resources: a) All natural features have been delineated on PDP. a b) The developer will acquire a fugitive dust permit from Larimer County Health Department. c) An enclosed dumpster area is planned include a recycling area. It has been sized to accommodate recycling large 55 gallon drums. d) This proposed plan has a landscape will promote water conservation techniques. e) The Owner is working with Margit Hentschel to determine any requirements for removal of'any possible on -site asbestos and prior demolition of existing building. 6) Poudre Fire Authority: a) Hazardous Materials Impact Study has been submitted with this PDP submittal. b) The Owner will work with Poudre Fire Authority on chemical storage. c) Address will be visible from College Avenue. d) Adequate access has been provided to serve the site. e) Noted. 7) Water/Wastwater: a) Existing water mains: 12-inch in College Avenue and 8-inch.in Foothills Parkway. b) Sewer Easement shall be maintained. c) Unused water taps shall be abandoned. d) A sand/oil interceptor shall be provided. e) All applicable water rights, conservation standards, et cetera shall apply to this development. The landscaping is planned to meet the water conservation standards. f) Developer will coordinate infrastructure needs through the Water and Wastewater Utility Department. E:\DWG\v 1988\ 1988pdp.doc 12 R April 4, 2000 Ron Fuchs, Planner Current Planning City of Fort Collins 281 North College Avenue Fort Collins CO 80524 RE: Richie's Express Carwash Project Development Plan Response to the Concept Review, January 24, 2000 Dear Ron: 1) Zoning Department: a) Noted; b) Noted; c) The Land Use Code allows for 25 parking stalls (5/1000 s.f. of building). The proposed plan has 6 employees parking, one of which is for disabled parking. There are 18 vacuum stations. The proposed plan is to reconfigure the existing bank property to accommodate more efficient and clearly designated parking, see plan and project description. d) Noted. 2) Stormwater Utility: a) The site is within the Foothills Basin. The existing site conditions are almost all . impervious. The proposed site plan is less impervious than the existing. There will be no requirement for drainage fee collection, see Drainage -Report. b) Drainage Report has been submitted with this PDP submittal. The Plat will include an easement for the Larimer County Canal #2. c) On -site detention not required. 3) Engineering Department: a) .The standard utility plans requirements have been submitted with this PDP submittal. A Development Agreement will be prepared and approved by the developer and the City at time of Final Compliance. A Development . Construction Permit will be paid for and acquired by the developer prior to the start of construction. . b) The developer will pay Street Over -sizing Fees, as per Matt Baker. 451VVEST MOUNTAIN AVENUE'�'FORTCOLLINS ;COLORADO 80524 i� 9704841921 FAX:_9704842443 .E-MAIL: JIMSELLCFRILCOM c. Please make sure the minimum species diversity is provided in accordance with Section C 3.2.1(D)(3) of the Land Use Code. d. Show existing trees (including species and diameter) and designate whether they are to remain or be removed. Tree protection will be required in accordance with Section 3.2.1(F) of the Land Use Code. e. All street, pedestrian, and bike corridors shall be accommodated and connect to adjacent and proposed facilities, please contact Mark Jackson of Transportation Planning. f. Design Concems: .1. The site plan shall include building envelope/footprint dimensions and distance to nearest property lines. 2. Indicate all building colors on the Building Elevations in accordance with Section 3.5.1(G) of the Land Use Code. 3. Label the appropriate scale(s) for each illustrative elevation and sheet plan. 4. The architectural elevations shall accommodate all provisions of the Land Use Code. 5. Per Section 3.5.1(D) of the LUC, to the maximum extent feasible, primary facades and entries shall face the adjacent street. If facing a street is not feasible, at a minimum, a main entrance shall face a connecting walkway with a direct pedestrian connection to the street. "Maximum extent feasible" is defined in Article 5 of the LUC as "no feasible and prudent alternative exists, and all possible efforts to comply with the regulation or minimize harm or adverse impacts have been undertaken." "Connecting walkway" is defined in Article 5 of the LUC as "any street sidewalk, or any walkway that directly connects a building entrance(s) to the street sidewalk... without requiring pedestrians to walk across parking lots or driveways, around buildings, or follow parking lot outlines which are not aligned to a logical route." The building orientation shall face the adjacent streets with a direct pedestrian walkway as required in LUC Sections 3.5.1(D) and 3.5.3(B). 6. Indicate all building dimensions, including doors, windows, et cetera, on building elevations. g. Delineate all property lines and all rights -of -way, sidewalk widths and improvements on all plans. h. The plan shall meet all provisions as outlined in the C — Commercial Zone District Zone (LUC Section 4.17). i. The proposed land development will require documentation of all on -site and joint parking. j. Address all visual clearance and sight distance triangle areas per Section 3.2.1(L) of the Land Use Code. k. The applicant/developer shall coordinate all emergency and utility infrastructure needs to ensure that all infrastructure provisions are fully met. I. The burden of demonstrating compliance with all Land Use Code criteria is with the applicant. m. All modifications to code standards will be reviewed by the Planning and Zoning Board. W 10. Historic Preservation offers the following comments: a. Prior to formal submittal of a formal development plan to Current Planning, existing structures need to be reviewed through the review process. b. Coordinate all preservation concerns with Historic Preservation. 4 c. All street, pedestrian, bike corridors and mid -block connections shall be accommodated and �- connect to adjacent and proposed facilities. 5. The Natural Resources Department offers the following comments: a. Delineate all natural features, including the canal, as defined in the Land Use Code. b. You will need to file a fugitive dust control permit and coordinate this through the Larimer County Environmental Health Department. Please contact them directly. c. .Provide adequate dumpster and trash enclosure area to accommodate a recycling container(s) (see attachment). d. Native grasses and plant materials should be used wherever appropriate and bluegrass should be minimized. e. Prior to formal submittal of an application to the Current Planning Department, coordinate demolition of existing structure(s) with Margit Hentschel for possible on -site asbestos. 6. Fire Department offers the following: a. Hazardous Materials study may be needed. b. Need to facilitate chemical storage with Poudre Fire Authority. c. All addresses shall be visible from a public way. d. Adequate access shall be provided to serve the site. e. Please contact Ron Gonzales with Poudre Fire Authority to discuss these requirements. 7. Water/Wastewater offers the following: a. Existing Mains: 12-inch and 8-inch water in frontage road; services shall be looped. b. Sewer main to be maintained in existing 30 foot easement. c. Need to abandon existing water taps not being utilized. d. Need to provide sand/oil interceptor. e. All applicable water rights, conservation standards, et cetera apply to this development. f. Coordinate infrastructure needs through the Water and Wastewater Utility Department. 8. Light and Power offers the following comments: a. A C-1 Form shall be filed with Light and Power. b. The applicant/developer shall acquire all necessary access corridors/easements. c. The normal electric development charges will apply to this project. d. Coordinate all utility locations with Light and Power. 9. The Current Planning Department offers the following comments: a. This development request will be subject to the Development Review Fee Schedule that is available in the Current Planning Department office. The development review fees are due at the time of submittal of the required Project Development Plan and compliance phases of the development review by City staff and affected outside reviewing agencies. b. Per LUC Section 3.2.1(D)(2) street trees shall be placed at thirty-foot to forty -foot spacing intervals in the center of all parkway areas. The trees shall be placed at least eight (8) feet away from the edges of driveways and alleys, and forty feet (shade trees)/fifteen feet f (ornamental trees) (LUC 3.2.1(K) from any street light. All driveway locations and utilities E ~ shall be shown to ensure compliance with the Land Use Code. 3 vehicle and bicycle parking, parking, building setbacks, landscaping, fence screening, et cetera. These development standards are set forth in the following divisions: 1) Division 3.1 General Provisions 2) Division 3.2 Site Planning and Design Standards 3) Division 3.3 Engineering Standards 4) Division 3.4 Environmental, Natural Area, Recreational and Cultural Resource Protection Standards 5) Division 3.5 Building Standards $) Division 3.6 Transportation and Circulation 7) Division 3.7 Compact Urban Growth Standards 8) Division 3.8 Supplementary Regulations 2. Stormwater Utility offered the following comments: a. This site is located in the Foothills basin where the new development fee is $6,525/acre. However, this site appears to be almost all impervious now. The fee is only required if they're in an increase in imperviousness greater than 350 square feet. The site is in inventory grid #7N. b. A drainage report is required but it would not require as much detail as a new development. The primary concern is to establish how the site drains now and to maintain the patterns. One exception is that if water drains in to the Larimer #2 Ditch, it should be eliminated. It appears the site drains to the north and not into the ditch. The plat should include an easement for the irrigation ditch and the Larimer #2 Ditch Company would have to sign the plat and plans. c. The onsite detention and water quality extended detention requirements are waived since it is already impervious and it is "grandfathered" in. Water quality treatment is requested but not required. 3. The Engineering Department offers the following comments: a. The standard utility plan and development agreement requirements must be submitted to the City for review and approval. b. Street oversizing fees will apply to this development. Contact -Matt Baker for additional information regarding the actual fees related to your proposed development. c. A Transportation Impact Study (TIS) is required with your Development Plan submittal. To coordinate the parameters of this study, please contact Eric Bracke, the City's Traffic Engineer, and Kathleen Reavis, the City's Transportation Planner. d. Roadway improvements to City standards along the property's frontages are required. e. Adequate access shall be provided from public streets, including access for surrounding areas/properties. f. Access controls (right -in and right -out) will dictate turning movements in and out of project. g. Access roads shall be designed and improved to CDOT and City standards. h. Vacation of road right-of-way shall be coordinated and reviewed by the City. i. The applicant/developer shall acquire all necessary access corridors/easements. 4. Transportation Planning offers the following: a. A Transportation Impact Study (TIS) is required with your Development Plan submittal. To coordinate the parameters of this study, please contact Eric Bracke, the City's Traffic Engineer, and Mark Jackson, Transportation Planner. b. The site shall meet ADA requirements. 2 CONCEPTUAL REVIEW STAFF COMMENTS City of. Fort Collins MEETING DATE: January•24, 2000 ITEM:, Richie's Express Car Wash Project Development Plan APPLICANT: Mr. Vaughn Furness Jim Sell Design 153 West Mountain Avenue Fort Collins, CO 80524 LAND USE DATA: Request to develop a carwash facility on an existing developed site located west of College Avenue and east of Foothills Drive. The comments listed below are conceptual comments based upon a preliminary plan provided by the applicant at the January 24, 2000 conceptual review meeting. The applicant is expected to apply all pertinent Land Use Code and Street Design Standards in their final design. The comments are to provide a reasonable amount of direction prior to the submittal of a development plan. The following comments shall not preclude staff from making additional comments in the future in regard to overall layout of the site. DEPARTMENTAL CONTACTS: Current Planning Ron Fuchs 970.221-6750 Zoning Department Jenny Nuckols 970.221.6760 Engineering Department Sheri Wamhoff 970.221.6605 Street Oversizing Coordinator Matt Baker 970.224.6108 City Traffic Engineer Eric Bracke 970.224.6062 Poudre Fire Authority Ron Gonzales 970.221.6570 Stormwater Utilities Glen Schlueter 970.221.6681 Water & Sewer Utilities Roger Buffington 970.221.6681 Natural Resources Kim Kreimeyer 970.221.6750 Natural Resources Margit Hentschel 970.224.6179 Light and Power Alan Rutz 970.221.6700 Historic Preservation Karen McWilliams 970.221.6376 Transportation Services Mark Jackson 970.416.2029 Parks and Recreation Janet Meisel -Burns 970.221.6367 Advance Planning Pete Wray 970.221.6376 COMMENTS: 1. The Zoning Department offered the following comments: a. The site is located in the C — Commercial Zone District (Article 4). b. The proposal will be regulated under all provisions of the Land Use Code (LUC) and will be subject to a Type 1 review. c. The proposed land development will require documentation of all on -site and joint parking. d. This development must comply with all applicable General Development Standards as set forth in Article 3 of the Land Use Code, including but not limited to the requirements for COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 241 N. College Ave. P.O. Box580 Fort Collins, CO 80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT ss ATTACHMENT Conceptual Review Letters and explanatioe of how issues have been addressed Conceptual Review Letter.- and Response to Concept Review Issues and Concerns EADWG\v1988\1988pdp.doc• 6 Development Phasing Schedule: Development is planned to begin spring, 2001. Completion is planned for fall, 2001. Thank you for your consideration and we. look forward to worKing with you throughout the development review process. Sincerely, JIM SE�LLf DESIGN, Inc. L. Vaughn Furness EMWGW1988\19$8pdp.doc 5 Written narrative addressing each concern/issue raised at the neighborhood meetings: Neighborhood Meeting not required, Type I Review Name of the project as -well as any previous names the project may. have been known by: Richie's Express Carwash, Project Development Plan, Fort Collins, Colorado. A narrative description of how conflicts between land uses are being avoided or. mitigated: There are no known conflicts between land uses. ,The proposed land use of car washing (vehicle minor repair, servicing, and maintenance), is allowed in the Commercial Zoning District with Type I Administrative Review. The proposed site plan mitigates the existing problems of boundary lines, parking, and access agreements between the FirsTier Bank and the existing Tire Shoppe. The proposed plan identifies 12 parking staff for the FirsTier Bank to be constructed as part of this PDP in the northwest corner of the site. The proposed plan solves the travel conflicts between the site and College Avenue by eliminating all access on to College Avenue. Conceptual Review Letter and explanation of how issues have been addressed For a complete response to the issues and concerns raised at Concept Review, see Attachment I - Response to Concept Review Legal Description: (See Attachment II) Name and address of each owner of Property in the PDP area: i , Richie's Express Carwash, LLC Name of all General Partners: James R. Frank Thomas W. Frank Quinn II, LLC. (Jeffery J. Quinn &, Brad H. Quinn) EADWG\v1988\1988pdp.doc 4 Shade trees will be planted 30' - 40' on center within the landscape parkway. Principle CAD-4: Security and crime prevention will continue to be important factors in urban design. Policy CAD-4.2: Lighting and Landscaping. Security lighting will be incorporated into the site plan. It will be generally low- level lighting to reduce off -site spillage and glare. Landscaping will be planned to avoid hidden areas, especially at the building entrances. Proposed and Existing Open Space, Buffering, Landscaping, Circulation, Transition Areas, Wetlands, and Natural Areas: This proposed plan has a landscape buffer to screen theparking areas and building. The Landscape Plan will promote water conservation techniques. There will be a landscape buffer along the Larimer County Canal #2. Estimate of number of employees for commercial and industrial uses: 3 - 5 employees Description of rationale behind the assumptions and choices made by the - aapplicant: e This project was planned to address the issues and concerns raised at the Conceptual Review, January 24, 2000; meet the requirements and intent of the new Land Use Code; and to provide safe travel movements for all vehicles and a pedestrians using the site. The existing site has some history to the current property boundary, easements, and agreements with the .FirsTier Bank. The bank originally owned a portion of the southwest corner of the site, which they used for parking. There was a boundary line adjustment to exchange for land adjacent to the bank's property, see site plan for Property Line Adjustments and Easements. The proposed plan shows reconfiguring the bank's existing parking to work better for both property owners. For a complete response to the issues and concerns raised at Concept Review, see Attachment I -Response to Concept Review. E:\DWG\v1988\1988pdp.doc 3 Principle T-1: The physical organization of. the city will be supported by a framework of transportation altematives that maximize access and mobility throughout the city, while reducing the dependence upon the private automobile. Policy T-1.1: Land Use Patterns. The propose Land Use is within walking distance of public transit on College Avenue. The closest bicycle lanes are on McClelland Drive and also Swallow Avenue. Principle T-4: Bicycling will serve as a viable alternative.:. Policy T-4.1: Bicycle Facilities. This proposal will include bicycle racks for employees. Principle T-5: The City will acknowledge pedestrian travel as a viable transportation mode and elevate it in importance to be in balance with all other modes. Direct pedestrian connections will be provided and encouraged from place of residence to transit, schools, activity centers, work and public facilities. Policy T-5.2: Connections. A The existing street system along College Avenue has sidewalks on both sides of the street. The attached sidewalks will provide the required pedestrian connection to the surrounding land uses. The building entrance has been planned to connect with a walkway to the existing sidewalk along College Avenue. The entry will be planned to be clearly visible and delineated by paving.. Policy T-5.2: Connections. Pedestrian connections will be clearly visible throughout this development. Principle -CAD -1: Each addition to the street system will be designed with consideration to the visual character and the experience of the citizens who will use the street system and the adjacent property. Together, the layout of the street network and the streets themselves willcontribute to the character, form and scale of the city Policy CAD-1.3: Streetscpe Design. The proposed plan has sidewalks detached with a landscape parkway.between sidewalk and street along Foothills Parkway and College Avenue. Policy CAD-1.4: Street Tree Design E:\DWG\v1988\1988pdp.doc 2 April 4, 2000 Ron Fuchs Current Planning City of Fort Collins 281 North College Avenue. Fort Collins CO 80524 LnnAergr An'hdrdur &Pblmeuq RE: Richie's Express Carwash Project Development Plan (PDP) Statement of Planning Objectives Dear Ron: Project Development Plan The proposed Project Development Plan is for a Site Plan approval for Richie's Express Carwash. The project is located at 3141 South College Avenue just south of Foothills Parkway. It is in the C-Commercial District; and the proposed land use of car washing (vehicle minor repair, servicing, and maintenance), is allowed in this zoning district with Type I Administrative Review. Richie's Express Carwash is an automated drive through facility. There will be 3-5 employees at any given time. Ingress. and egress will be from Foothills Parkway. The plan is to close the existing connection to College Avenue. There is an existing access easement across the northeast corner of the site for the FirsTier Bank egress onto College Avenue. The . .proposed plan is to abandon the existing easement and then direct vehicular traffic through the site to egress onto,Foothills Parkway. Appropriate City Plan Principles and Policies achieved by this P.D.P.: Principle LU-2: The city will maintain and enhance its character and sense of place as defined by its neighborhoods, districts, corridors, and edges. Policy LU-2.2:. Urban Design. The -proposed, use will contribute positively to the C-Commercial District. 153 WEST MOUNTAIN AVENUE FORTCOLLINS. COLORADO 80524- 1970484 1921 FAX" 970484 2443 E-MAIL: JIMSELLCFRILCOM VICINITY MAP #15-00 Richie's Express Carwash PDP - Type 1 (LUC) 04/20/00 1"=600' FINDINGS OF FACT/CONCLUSIONS After reviewing the Richie's Express Carwash, Project Development Plan, staff makes the following findings of fact and conclusions: 1. The proposed land use is permitted in the C — Commercial zone district. 2. The Project Development Plan complies with all applicable district standards of Section 4.17 of the Land Use Code, C zone district. 3. The Project Development Plan complies with all applicable General Development Standards contained in Article 3 of the Land Use Code. RECOMMENDATION: Staff recommends approval of the Richie's Express Carwash, Project Development Plan - #15-00. C. Division 3.5, Building Standards 1. Section 3.5.1, Building and Project Compatibility a. The proposal complies with Section 3.5.1(D) in that the primary fagade and entry faces South College Avenue, to the east. There is a connecting walkway, with an enhanced pedestrian connection across a 15' wide driveway, to the sidewalk along South College Avenue. b. The proposal complies with Sections 3.5.1(F) and (G). The building will be a 1-story structure with a flat roof (running east - west on -site). The building will be 18' to 19' in height, and will be constructed of red brick. Building materials will be similar to those on the existing Compass Bank building to the north. 2. Section 3.5.3, Mixed Use, Institutional and Commercial Buildings The applicant was granted a Modification of Standard to the LUC Sections 3.5.3(13)(2)(b) and (c) by the Planning and Zoning Board. The modification allows the building to exceed the maximum building setback requirements of 15' from Foothills Parkway and 10' to 25' from South College Avenue. As part of Staffs analysis of the modification request it was determined that car washes are exempt from providing direct connecting walkways to adjacent properties. See the attached Staff Report dated 12/07/00. 4. Neighborhood Information Meeting The Richie's Express Carwash, PDP contains a proposed land use that is permitted as a Type I use, subject to an administrative review. The proposed use is an automated car wash and constitutes a relatively small infill redevelopment in the midst of existing commercial/retail uses in the South College Avenue commercial corridor. The LUC does not require that a neighborhood meeting be held for a Type I development proposal and a neighborhood meeting was not held to discuss this proposal. 5 f. The proposal complies with Section 3.2.1(E)(5) in that it provides approximately 10% interior landscaping in the parking and vehicle use areas, exceeding the minimum requirement of 6%. 2. Section 3.2.2, Access, Circulation and Parking a. The proposal complies with Section 3.2.2(C)(4)(a) in that it provides secure and conveniently located bicycle parking near the front entry to the building, with the amount of bicycle parking exceeding the minimum requirement of 5% of the automobile parking spaces on -site. b. The proposal complies with Section 3.2.2(C)(5) in that it provides direct, safe, and continuous walkways and bicycle connections to major pedestrian and bicycle destinations in the surrounding area via an enhanced crosswalk between the front entry of the building and the sidewalk along South College Avenue. c. The proposal complies with Section 3.2.2(D) in that it provides for safe, convenient, and efficient bicycle, pedestrian, and vehicular movement to and through the site. Vehicular access and egress will occur via two curb cuts on Foothills Parkway and a one-way driveway into the northeast corner of the site from the existing frontage road along South College Avenue. d. The proposal complies with Section 3.2.2(K)(2)(a) in that the project will provide 4 long-term (employee and handicapped) parking spaces on -site, which is fewer than the allowable 24 spaces maximum (5/1,000 square feet of gross leasable floor area) for a vehicle servicing and maintenance (car wash) facility. There will be 12 parking bays for auto vacuum units. B. Division 3.3, Engineering Standards 1. Section 3.3.5, Engineering Design Standards The proposal complies with the design standards, requirements, and specifications for the services as set forth in this section. 4 2. Division 4.17 of the Land Use Code. Commercial Zone District The proposed use of an automated car wash facility is permitted in the C zone district subject to an administrative review. The PDP meets the applicable Land Use and Development Standards in the C zone district. 3. Article 3 of the Land Use Code — General Development Standards The Project Development Plan complies with all applicable General Development Standards as follows: A. Division 3.2, Site Planning and Design Standards 1. Section 3.2.1, Landscaping and Tree Protection a. The proposal complies with Section 3.2.1(D)(1)(c) in that it provides "full tree stocking" within 50' of the building, according the standards as set forth in this section. b. The proposal complies with Section 3.2.1(D)(2)(a) and (b) in that canopy shade (street) trees are provided at a 30' spacing along Foothills Parkway behind the existing attached sidewalk and at a 40' spacing along South College Avenue in the proposed 12' wide parkway between the street and the new detached sidewalk. c. The proposal complies with Section 3.2.1(D)(3) in that no one species of tree on the development plan exceeds 33% of the total of 34 new trees on -site. d. The proposal complies with Section 3.2.1(E)(4)(a) in that trees are provided at a ratio of no more that 25 lineal feet along South College Avenue and Foothills Parkway (public streets) and no more than 40 lineal feet along the north lot line in the parking lot setbacks. The south line of the property is within the Larimer County Canal No. 2 Ditch Company easement, where tree and shrub plantings are controlled and limited by the ditch company. e. The proposal complies with Section 3.2.1(E)(4)(b) in that the on - site parking areas will be screened from the adjacent street and properties to the south and west with shrub plantings that will block at least 75% of the vehicle headlights and extend for more than 70% of the street frontage and property line along the parking areas. 3 Vehicle minor repair, servicing and maintenance establishments (including car washes) are permitted in the C — Commercial Zoning District, subject to administrative (Type 1) review. The C District is: Intended to be a setting for development, redevelopment and infill of a wide range of community and regional retail uses, offices and personal and business services. Secondarily, it can accommodate a wide range of other uses including creative forms of housing. While some Commercial District areas may continue to meet the need for auto -related and other auto -oriented uses, it is the City's intent that the Commercial District emphasize safe and convenient personal mobility in many forms, with planning and.design that accommodates pedestrians. This proposal complies with the purpose of the C District as it is redevelopment of infill property in the commercial corridor along South College Avenue. The previous use was an auto tire store. This proposed automated car wash facility is an auto-related/auto-oriented land use that will provide pedestrian access to and from the site from the sidewalk system along South College Avenue. COMMENTS: Background The surrounding zoning and land uses are as follows: N: C; existing bank (Compass Bank) S: C; existing shopping center (Crystal Gardens) E: C; existing shopping center (Foothills Fashion Mall) W: C; existing commercial (Alfalfa's Market, Wilbur's Beverage Nation) The property was annexed in November, 1970, as part of the South College First Annexation. The property has not been previously platted. A subdivision plat is being reviewed as part of this development request. The existing building was approved and constructed as a permitted "use by right", date uncertain. 0A Commi y Planning and Environmental rvices Current Planning City of Fort Collins ADMINISTRATIVE PUBLIC HEARING: May 3, 2001 PROJECT: Richie's Express Carwash, Project Development Plan - #2-Ie k/Selro 138A- APPLICANT: Jim Sell Design, Inc. c/o Vaughn Furness 153 West Mountain Avenue Fort Collins, CO. 80524 OWNER: Richie's Fort Collins Express Carwash, LLC c/o James R. Frank P.O. Box 272548 Fort Collins, CO. 80527 PROJECT DESCRIPTION: This is a request for 1-story, 4,900 square foot building, to be used as an automated car wash facility, on a 1.22 acre site located at the southwest corner of South College Avenue and Foothills Parkway. The property is just south of the existing Compass Bank building and is in the C - Commercial Zoning District. RECOMMENDATION: Approval EXECUTIVE SUMMARY: This PDP complies with the applicable requirements of the Land Use Code L( UC), more specifically: the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; standards located in Division 3.2 - Site Planning and Design Standards and Division 3.5 - Building Standards of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; and standards located in Division 4.17 Commercial District (C) of ARTICLE 4 - DISTRICTS. 281 North College Avenue - PO. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750 - FAX (970) 416-2020