Loading...
HomeMy WebLinkAboutRICHIE'S EXPRESS CARWASH - PDP - 15-00 - CORRESPONDENCE -Please contact me at 970.221.6750 and/or e-mail: rfuchs(a,ci.fort-collins.co.us if you should have any questions or concerns related to these comments. Sincerely, Ronald G. Fuchs City Planner cc: Current Planning File #15-00 Tim Blandford Dave Stringer Eric Bracke Clark Mapes Kathleen Reavis Mark Jackson D:Wy DowmentMPlanning DowmenhRichies Express #15-00%Richie's Express Car Wash Tier One Current Planning Comments.doc wj h. The doors you propose on the south and west elevations do not have sufficient aesthetic articulation. Please incorporate doors into the fagade treatment elements. i. Provide a detailed lighting plan (spec. sheet for all wall fixtures) insuring that all lighting apparatuses are shielded down that meets Sections 3.2.2 and 3.2.4(A) — (D). j. Please indicate all building colors on the Building Elevations in accordance with Sections 3.5.1(F) and 3.5.1(G) of the Land Use Code (include color chips and building materials). k. Please indicate all building dimensions, including doors, windows, et cetera, on the building elevations. 32. A detail is needed for the connection to the footbridge in the southeast part of the site. 33. Take off references to signage on the elevation page, as the sign review is a different process from the PDP review. 34. After revising the site/landscape, please make sure the minimum species, diversity is provided in accordance with Section 3.2.1(D)(3) of the Land Use Code. 35. Please show the location of all transformers on the revised Site and Landscape Plans. They must be located no more than 10 feet from a paved surface and must be screened from view. 36. Please note all exterior mechanical devises, meters, et cetera, must be screened. 37. Detach the sidewalk that connects your site to the College & Foothills intersection as it crosses in front of the bank site if possible. See also Transportation Planning and Advance Planning Comments. 38. Coordinate all easements, open areas, street, sidewalk and pedestrian crossings, infrastructure through out the development with Natural Resources, Stormwater, Traffic Operations, Engineering, Transportation Planning Services and other affected departments and outside reviewing agencies. All infrastructure provisions need to be met and are to be in compliance with the Land Use Code. Please call to set up a meeting if necessary. 39. All certification blocks on the project development plan shall be consistent with language as required by the City of Fort Collins Development Manual. 40. Return all redlined documents with plan revisions, including redlined plans with Current Planning comments. Prior to formal re -submittal, it is pertinent that City staff meets with you and your team to discuss issues relating to the project development plan. Additional comments will be forthcoming as they are reviewed and received from City departments and from outside reviewing agencies. Please provide a written response to each of the above comments with the submittal of plan revisions. Please return all drawings and reports redlined by City staff with submission of your revisions that are clearly dated and labeled as revised plans. Please see the attached Revisions Routing Sheet for the number of copies of revisions to submit. To facilitate the complete re -submittal of the application with supplemental materials, please have your project manager contact Ginger Dodge and/or Voneen Macklin of the Current Planning Department at 970.221.6750. M f. Will stacking ever be occurring in the 12 foot wide semi -circular drive along the eastern side of the site? If so, more buffering will be needed. 31. The following comments apply to the design and siting of the structures: a. Section 3.5.1(J)(1) and (2) require that no trash enclosure be located within twenty (20) feet of any public street, public sidewalk or internal pedestrian way and screened with vegetative landscaping. b. The building is located 72 feet behind the College Avenue right-of-way. Section 3.5.3(13)(2)(c) requires that the building be located at least 10 and no more than 25 feet from the right-of-way of any street larger than a minor arterial. There are several exceptions allowed to this rule specified in subsection (d) of the same section. If you intend to utilize exception number 2, you will need to make a formal written request and revised plans. Note that exception 2 clearly requires that you provide a connecting walkway, which is currently not being provided in the proposed plan. c. Section 3.5.3(B)(1) of the LUC requires that at least one main entrance to any commercial or mixed -use building shall face and open directly onto a connecting walkway with pedestrian frontage. The definition of a "connecting walkway" in Article 5 specifically states that a connecting walkway cannot require pedestrians to cross parking lots or driveways. The proposed configuration has no pedestrian connection to either street that meets this standard. d.. Section 3.5.3(C) of the LUC requires that facades exceeding a height to width ratio of 1:3 provide a variation in massing along that fagade including a change in height and a projecting or recessed element. Changes in mass_ shall be related to entrances, the integral structure and/or the organization of interior spaces and activities and not merely for cosmetic effect. The north and south elevations of this building do not satisfy this standard. e. You have not specified the opacity of the glass you are proposing. Section 3.5.1(F) of the LUC specifies that clear glass (reflectivity or opacity of less than 60%) shall be used for commercial storefront display windows and doors. Please specify. f. Section 3.5.1(F)(3)(c) requires that windows must be placed to visually establish human scale and proportion and must be individually defined with detail elements such as frames, sills and lintels. Pedestrian scale/human scale is defined in Section 5 of the code as "the proportional relationship between the dimensions of a building or building element, street, outdoor space or streetscape element and the average dimensions of the human body, taking into account the perceptions and walking speed of a typical pedestrian. It appears that the window types and placements that you have proposed on the north elevation do not meet these requirements. g. Section 3.5.1(J) (2)&(3) require that utility meters, HVAC equipment, vaults, irrigation boxes, transformers, and other utility service functions (such as conduits, and vents) shall be located and screened so that the visual and acoustic impacts of these functions are fully contained and out of view of the adjacent properties and public streets. Please provide a sketch of the building complete with all of the utility elements and the proposed screening - so it can be determined whether or not these requirements are being met. There is currently not enough information provided to make this determination. 5 21. Note Twelve (12), sheet 3 of 3, needs to be removed since it is not acceptable. Changes to an approved project development plan may require an amendment to be filed and/or possible a new project development plan review. 22. Section 3.2.1(D)(1)(c) of the LUC requires "full tree stocking" in all landscaped areas within 50 feet of all buildings. Please read this section of the code in detail and comply with the spacing requirements. Please see the redlined landscape plan for locations where this issue needs to be resolved. 23. Section 3.2.1(E)(2)(d) of the LUC requires foundation -planting beds a minimum of 5 feet wide along at least 50% of all high -use or high -visibility facades. 24. Per Section 3.2.2(M) and Section 3.2.1(E)(4) — (6) requires at least six (6) percent of the interior space of any parking lot be devoted to interior parking landscaping. The actual interior parking lot landscaping percentages have not been shown. Please provide a diagram depicting where the boundary of the vehicular use area is proposed to be, where the landscaped areas within this boundary are proposed to be, and specify the square footage of each so that it can be determined whether or not you are satisfying this requirement. 25. All parking lots need to meet the parameters addressed in LUC Section 3.2. 1 (E)(5)(a) — (e) including 3.2.2(B)(5)(a) walkways shall have one (1) canopy shade tree per forty (40) lineal feet of walkways planted in a landscape strip within five (5) feet of such walkway. 26. According to Section 3.2.2(C)(3) site amenities such as benches, bike racks, et cetera should be provided. Please show site amenities. 27. Another tree is required by Section 3.2.1(E)(5)(c) of the LUC in the peninsula along the northern end of the west entry. 28. Per Section 3.2.2(L) of the Land Use Code, please label typical parking stall lengths, widths and note all drive lane widths. 29. Provide dimensions on the trash enclosure and parking/vacuum spaces on the site plan. 30. The proposed project development plan does not sufficiently demonstrate an interrelation of pedestrian, vehicular and bicycle circulation ways and how the developments plan contribute to a cohesive, continuous and functional link within the surrounding area. a. Section 3.2.2(B), (C)(1) & (5) — (7) and 3.2.2(D) — (E) requires that six-foot walkways within the site provide direct well direct well-defined and separated circulation routes for vehicles, bicycles, and pedestrians. In accordance with the Land Use Code, on -site pedestrian systems shall provide directness, continuity, and safety and minimize the number of driveway and drive aisle crossings. Pedestrian/vehicle separation within the parking areas to the north, south, west and east of the building need to be enhanced. These standards have not been met on the site plan. b. A joint vehicular movement access easement through the existing bank site and this site needs to be explored. c. The proposed access point from the existing frontage road and pavement stripping area on the northeast corner conflict. Proposed access movement locations need be coordinated with staff. d. A few years back the bank to the north of this site wanted to vacate that - frontage road. Staff would like you to pursue the issue of vacating that frontage road. We recommend that it be replaced with an access easement that allows you to have access across that area yet it becomes a private drive rather than a public right-of-way. e. Does the carwash really need 4 lanes for stacking? This is a lot of pavement. 2 11. The plan sets need to include the exact building envelope/footprint dimensions and distance to nearest platted property lines as required by the City of Fort Collins Development Manual. 12. Street improvements including the width of bike lanes, sidewalk widths and all pathway widths need to be shown on the project development plan sets. 13. Address all visual clearance and sight distance triangle areas per Section 3.2.1(L) of the Land Use Code, they have not been shown. 14. It appears he block wall being proposed to be removed is off -site and may require an amendment to be submitted by this property owner, please clarify. 15. The landscape plan set needs to indicate the treatment of all exterior spaces including plant sizing meeting City standards and actual vegetation locations as required by the City of Fort Collins Development Manual. 16. The plant list does not list all the plant types that are shown on the landscape plan (i.e. "jc"). 17. Per LUC Section 3.2.1(D)(2) street trees shall be placed at thirty-foot to forty -foot spacing intervals in the center of all parkway areas. The trees shall be placed at least eight (8) feet away from the edges of driveways and alleys, and forty feet (shade trees)/fifteen feet (ornamental trees) (LUC 3.2.1(K) from any street light. Section 3.2.1(D)(2) requires street trees along College Avenue and Foothills Parkway at spacing intervals every 30 to 40 feet. (see also item 19) 18. Stone cobble is not an adequate material for the landscape buffer area between parking lots and the lot lines. Please note LUC Section 3.2.1(E)(4) Parking Lot Perimeter Landscaping (a) and (b) address the need to screen parking areas with the a plan clearly identifying the extent and location of all plant material and landscape features. a. Section 3.2. 1 (E)(4)(a) of the LUC requires that trees be planted every 25' between parking lots and the street, and every 40' between parking lots and interior lot lines. Upon review of the landscape plan, sheet 3 of 3, the landscape areas between the curbs and property lines and streets and the side property lines and areas between the property line and parking areas have not satisfied this requirement. See the redlined landscape plan for locations where you are not satisfying these requirements. b. Please note LUC Section 3.2.1(E)(4) Parking Lot Perimeter Landscaping (b) screening addresses the need to screen parking areas. The proposed parking lot landscape plan on sheet 3 of 3 has not met this standard and needs to be revised to meet the Land Use Code. The areas between the property lines and parking areas have not satisfied this requirement. The landscape intent should be to provide a mix of material for year round interest and mix of forms and shapes, such as, evergreen trees and shrubs for winter months, ornamental trees (including deciduous shrubs) for seasonal variety. 19. Per Section 3.2.2(J) requires the vehicular use area be set back from a property line with a five (5) foot landscape strip. The north property line adjacent to the vehicle parking areas does not provide a sufficient five- (5) foot landscape strip. Please clarify if there is a collective parking arrangement (recorded joint access agreement), if existing or proposed, this agreement shall be submitted and included with this Project Development Plan. - 20. The angle and configuration of the parking/vacuum stalls at the southwest corner of the site is contrary to the one-way movement through the site. This conflict needs to be resolved. 3 M. Transfort; N. Engineering Pavement; O. Stormwater; P. Mapping/Drafting; Q. Water & Wastewater; R. Traffic Operations- S. Transportation Planning; and, T. Current Planning; The following comments are from the Current Planning Department: 1. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by August 22, 2000. A 30-day extension to this deadline is available. Request for an extension should be directed to the Current'Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. 2. The overall site plan needs to incorporate an area within five hundred (500') feet of the proposal and include all land uses, site improvements, traffic circulation, gross and net densities of residential uses (if applicable), exclusive of public right-of-way. All plan sets shall reference the project development plan. 3. The surrounding/abutting streets need to be labeled and shown on all respective plan sheets including the vicinity map. 4. Please show Foothills Parkway all the way to its intersection with College Avenue. 5. Please label the sheet plan sets Sheet 1 of 5+, Sheet 2 of 5+, et cetera in the lower right hand corner of each applicable sheet of the project development plan. 6. Signed letters of intent indicating that all required off -site easements and off -site rights -of -way necessary for the project can be negotiated in time for the final compliance plan submittal. 7. Delineate all property lines, property line setbacks for all proposed and existing structures and improvements, College Avenue and Foothills Parkway right-of- way width and improvements, private drive widths, and sidewalk widths on all plans as required by the submittal requirements of the City of Fort Collins Development Manual. 8. Upon revisions, please note the plan set will need still to include the following information as required by the City of Fort Collins Development Manual listing the proposed coverage of buildings and structures: (i) Percentage and square footage of building coverage. (ii) Percentage and square footage of driveway and parking. (iii) Percentage and square footage of public street right-of-way. (iv) Percentage and square footage of open space and/or landscaped area. (v) Percentage and square footage of "active recreational use" area. 9. The plan set needs to include the number and location of off-street parking, including guest, handicapped, bicycle, and motorcycle parking including typical - dimensions of each as required by the City of Fort Collins Development Manual. 10. The plan set needs to include permanent and temporary drainage courses and structures. 2 Commv *`y Planning and Environmental'' -vices Current 1-..fining City of Fort Collins May 24 2000 Mr. Vaughn Furness Jim Sell Design 153 West Mountain Avenue Fort Collins, CO 80524 RE: Staff review comments for Richie's Express Car Wash Dear Mr. Furness, This letter is in response to plans for the Richie's Express — Project Development Plan (Current Planning File #15-00 — Type 1 Review) submitted on April 18, 2000. Please note that staff reviewed your plans and the Planning Department routed a request for comments to several public agencies and various City departments. This development proposal is subject to and shall comply with all requirements set forth in the City's Land Use Code (LUC), specifically: Articles 2. Administration (Development Review Procedures); Article 3. General Development Standards; Article 4. [Zoning] District (Commercial District (C)); and, the City of Fort Collins Development Manual. The City of Fort Collins Land Use Code (LUC) requires that throughout all land use proceedings, the burden to comply with all applicable standards rest with the applicant. After reviewing materials submitted by the applicant, staff finds that revisions including various levels of re -design to the submitted plans dated 4/4/2000, 4-5-00, 4-11-00, and 4-12-00 are warranted to meet the Land Use Code. The following lists the agencies and departments that responded and their comments are attached: A. Park Planning; B. Building Inspection; C. Advance Planning; D. Public Service; E. Natural Resources; F. Post Office; G. Light & Power; H. Streets; I. Water Conservation,- J. AT & T Digital; K. Zoning; L. Engineering; 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020