HomeMy WebLinkAboutRAMS PARK - PDP - 12-00 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Rowy� jpU r-�
Planner: `1 V-V I f3° vw' Traffic Operations:
Engineer: rr,
Date: 8 z O o
Items Requested
Site Land I Plat Udliq I Drainage Opt Other Items Required
Engineering h x
Redlined Items Being Returned
Site I land I Plat Utility Drainage R t Other Items Being Returned
Stormwater
x
x
Water/Waftewatc
Trat Operations
Trani. Planning
Tranffort
Natural Resources
Park Planning
tC�n S4rJ.
TOCdif
'S
�
Other:
Note: All redlined items should be returned with the refubmittal/ resdfions.
Reons Routing Sheet -f-,oL,,A
oil
FILM- PROJECT PLANNER
an- 91
m
• m
WAGNIQ
m
BUILDING INSPECTION
MAPPING / DRAFTING
m
9 , 100Z
m
m
FCLWD/ELCO/BOXELDER
ADVANCE PLANMNG
m
m
mm
R-O.W. PLANNING
WATER CONSERVATION
POSTOFnC"-E
PUBLIC SERVICE
SCHOOLS: POUDRE/ THOMPSON
IL
STATE HIGHWAY DEPARTMENT
1 10219 1 k to
RAILROAD: UP or BNICS
REA/DOE/PRPA
--
m
mpgm�ippm
mom
����i
mmmmomom mmm
mm