HomeMy WebLinkAboutRAMS PARK - PDP - 12-00 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETm
Project:
Planner: T tf T -,
Engineer: 6A,-r
Traffic Operations: �-
Date: o
items Requested
Redlined Items Being Returned
bite
land
Plat
Utill
Drainage R t
Other Items Required
Site land Plat Utili Drainage R t Other Items Being Returned
Engineering
k
u
Stormwater
-X-
l4ater/Raltentel
51
x
�
1raMc Operations
k
— —
Trani. Planning
frantfort
—
Natural Rmourm
Park Planning
— —
Other:
Note: All redlined item] should be returned with the retubmlttal/ reMlonc,
min
Revisions RoutingSheet ! ,
BUlLDING, INSPECTION
LIGHT & POWER
MON
mNO
mmm
• 20m
mmmmR-O.W.
PLANNING
mmm
NO
CONSERVATIONWATER
mmmm�
. •
�mmomm
mm
mm
PUBLIC SERVICE
mmmmmm
STATE HIGHWAY, MPARTMENT
m
DITCH COMPANY
0
RAELROAD: LP or BN/CS
-----_---�----
..---�----.--