Loading...
HomeMy WebLinkAboutCHEROKEE FLYING HEIGHTS - FDP - 17-00B - CORRESPONDENCE -i Revisions Routi*ng* Sheet • ' ONO mm���e� 1 71 1 11 No No IN BUHMINGINSPECTION No M"PINGIDRAFnNG IMM MIN IN m mm� Nommm���� mmmmm IN R-0-W PLANNING WATER CONSERVATION mom MOWN mmom . .1 mmmmmm mmommmNo MOMMMUM Project: HFROKGHT5 Planner: CAr4,5--�ot1 c`o-s TrafOcOperations: Engineer. Vl ew Items Requested Site land I Plat I Utility F-2�yther Items X u �. �r/wastewate x I < I -.y- Ix Ic Operadons s. Planning it Resources " I I 1 J Planning Other: Note: All redlined Items should be returned with the resubmlMV revisions. Date: Redlined Items Being Returned Site I Land I Plat I Utility Draina e xI�i/lam Other items Being Returned 55 Please remove water quality outlet structure detail on sheet 14 due to a modified structure being proposed. If purpose is to show well screen and orifices, than mark out and note only pertinent information. Department: Water Wastewater Issue Contact: Jeff Hill 24 Repeat Comment 9/17/02 Show locations of gas and electric on the overall utility plan. The location proposed for electric and gas is not the usual location. Has gas and electric approved these locations? Perhaps electric and gas need to have a sign off area on this plan. Topic: General 57 No water services are permitted on a dead end water main beyond the last fire hydrant, 58 Provide full concrete encasement on the existing 8-inch sanitary sewer main if the proposed water main cross below or within 18-inches vertically of the sanitary sewer main. 59 Multiple landscape plans are confusing. Provide only one landscape plan for this project. See site, landscape and utility plans for other comments, Please return all of your redlined plans when you re -submit. As soon as the above issues are satisfactorily addressed, final mylar copies of the plans may be submitted for recordation. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, AMERON GLOSS Current Planning Director Page 2 STAFF PROJECT REVIEW CAvof Fort Collins Torgerson Architects Date: 9/25/2002 Mikal Torgerson 211 Jefferson Fort Collins, CO 80524 Staff has reviewed your submittal for CHEROKEE FLYING HEIGHTS Final Compliance #17-00/13, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Cameron Gloss Topic: General 56 No requirements for the Final Compliance Review Department: Engineering Issue Contact: Marc Virata Topic: General 62 The landscape plans appear to show a street light (by way of symbol) proposed within the western boundary. of the additional right-of-way granted for Taft Hill Road. This or any other permanent type of structure should be relocated away from right- of-way. Ensure that information is coordinated between site, landscape, and utility plans. 63 Attached is an "Information for Development Agreements” Sheet which should be filled out in order to begin the Development Agreement process. Topic: Utility Plans 60 Previous redlines were apparently not received. These would be helpful to ensure any minor comments not typed on DMS but documented on redlines were addressed. 61 This project was formally submitted and is required to be reviewed under older Street Standards. Engineering would like the applicant/engineer to look at providing a radius style driveway (20' radii) off of Taft Hill Road (which would be required under the new street standards) instead of the driveway pan. Engineering views it as an advantage to allow faster turning movements off of Taft Hill Road. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage 54 Please see comment in drainage report, Page 1