HomeMy WebLinkAboutPINNACLE TOWNHOMES - PDP - 34-00A - CORRESPONDENCE - LUC REQUIREMENTSPinnacle Townhoroes; Ft. Collins, Colorado
Adrmnistrative Herring Preparation
See below for file path
Attachments for the meeting:
Shear Engineering Corporation Project No: 1555-02-00
Date: 02/13/02
Latest Revision Date: 02/13/02
Plan: Sheet 4 of 25 of the Spring Creek Flood Insurance Study
Plan: Drainage and Erosion Control Plan with highlighted floodway lines for clarity
Exhibits: Foundation / floodplain protection exhibits (3)
Drainage Report: Page 4 (Drainage Design Criteria)
Portion of the geotechnieal investigation report by Terracon
pRE1.1M�NARY
Page 4 of 4
FAClicntaW-ClimoVlnchor DevalopmMt\Pinnacle TownhomesTocumentsTublic HcanngWmin Waring Prcpmdon.doc
FEB-13-2002 14:5e P.04
Pinnacle Townhomea; Ft. Collins, Colorado
Administrative Herring PreP4'mtioa
See below for file path
rroy!Idwater (UMdsr4WI3 KYSIS ):
Shear Engineering Corporation Project No: 1555-02-00
Date: 02/13/02
Latest Revision Date: 02/13/02
The high groundwater level at this site was recognized during the review of the geotechnical
investigation report for Pinnacle P.U.D. by Empire Laboratories, Inc. which was prepared in
1985.
A recent geotechnical investigation report has been prepared by Terracon of Fort Collins. The
report addresses groundwater conditions and makes specific recommendations concerning the
handling of subsurface flows. All recommendations are accommodated in the final design of
Pinnacle Townhomes final utility plans. All recommendations will be met for the final design of
the actual structures. The report meets the current requirements for groundwater investigations
according to the recently adopted Larimer County Urban Area Street Standards.
White PVC standpipes have been placed on the site. These are for purposes of monitoring
groundwater levels.
References:
Geotechnical Engineering ReportProposed Pinnacle Townhomes South of Prospect Road,
North of Spring Creek, and West of Lemay Avenue Fort Collins, Colorado; Terracon; report
dated October 10, 2001; Terracon Project No. 20015202
Report of a Geotechnical Investigation for The Pinnacle P.U.D.; Empire Laboratories, Inc.;
report dated July 8, 1985; E.L.I. Project No. 6069-85
pAEIIMINARY
Page 3 of 6
FACIientaW-lienta\Andor Ikvelopment\PInnacle TownhomsTocumentsTubtic Hcimng\Admin Hearing P're"ration.doc
FEB-13-2002 14:57 P.03
Pinnacle Townhomes; Ft. Collins, Colorado
Administrative Hearing Preparation
See below for file path
Dralnaee and Floodplain Conformance:
Shear Engineering Corporation Project No: 1555-02-00
Date: 02/13/02
Latest Revision Date: 02/13/02
All drainage design meets the City of Fort Collins StoTm Drainage Design Criteria and
Congtmction Standards; Fort Collins, CO: May 1984; Revised May, 1997. This includes the
amended rainfall adopted by the City since the 97 flood.
All building elevations have been determined based on FEMA (Federal Emergency Management
Agency) and City of Fort Collins flood protection requirements. Specifically, according to the
following documents:
• Flood Insurance Rate Map (FIRM) City of Fort Collins Colorado. Larimer County
Community -Panel Number 080102 0012 C. Revised March 18, 1996: Federal Emergency
Management Agency National Flood Insurance Program
• Spring Creek floodplain as delineated on Sheet 4 of 25 of the Spring Creek Flood Insurance
Study, prepared by Greenhome & O'Mara.
• Modifications to the Spring Creek 100-year water surface elevations are presented in
Floodylain Modeling Report for Pinnacle P.D.P., prepared by Northern Engineering
Services, Inc.
The finished floor elevations of the two (2) buildings within the floodplain have been set at 1.5'
above the theoretical 100-year water surface elevation according to FEMA requirements. All
buildings with basements have been set so that the lowest basement window opening is not
below the 100-year water surface elevation and the finished grade is a minimum of 42" above the
100-year water surface elevation.
Based on the design for Pinnacle Townhomes, upstream development will not be impacted.
There are no increased flows in Prospect Road due to this development.
PFtE1.1M�NPRY
Pop 2 of 4
FAChentAA-Clients\Anehor Devclopn=t\Pirmacle Tow homes\Docun"ts\Public Henting\Admin Hearing Preparation.doc
FEB-13-2002 14:57 P.02
Pinnacle Townhomes; Ft. Collins, Colorado Shear Engineering Corporation Project No: 1555-02-00
Administrative Hearing Preparation Date: 02/13/02
See below for file path Latest Revision Date: 02/13/02
Pinnacle Townhomes,
Ft. Collins, Colorado
General rnefnrmasce with City standards:
All engineering design meets City of Fort Collins design standards for street, water, sewer, storm
drainage, flood protection, water quality and erosion control. City approvals are required in the
form of signatures on approval blocks on all design drawings. City approvals are not obtained
until, in the opinion of City staff, all City of Fort Collins design standards are met or exceeded.
Certain standards applicable to this project include, but may not necessarily be limited to, the
following:
• The City of Fort Collins Land Use Code; adopted March 18, 1997; latest revision date: June
19, 2001 (Supplement #10)
• The Larimer County Urban Area Street Standards; adopted January 2, 2001
• City of Fort Collins Storm Drainage Desigg Criteria and Construction Standards; Fort
Collins, CO: May 1984; Revised May 1997
• City of Fort Collins Erosion Control Reference Manual; City of Fort Collins, CO: January
1991.
• Federal Emergency Management Agency Floodplain protection requirements
PRELIMINARY
4 S►+�rs
Pagc 1 of a