HomeMy WebLinkAboutPINNACLE TOWNHOMES - PDP - 34-00A - SUBMITTAL DOCUMENTS - ROUND 1 - EASEMENTSRESOLUTION 86-.'.80
OF THE COUNCIL OF -THE CITY OF FORT COLLINS
AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT
GRANTING TO PINNACLE PARTNERSHIP A STORM DRAINAGE
EASEMENT. THROUGIf CITY PROPERTY
.WHEREAS, Pinnacle Partnership-----.
the Cityof Fort Collins (the •"Partnership") has requested that
grant a storm drainage easement to the Partnership .
across City property to release drainage water from The Pinnacle P.U.D. -
into Spring Creek; and
WHEREAS, 'The Pinnacle P.U.D. was approved by the Planning and Zoning
Board on March 3, 1986; and
WHEREAS, 'the Partnership has already dedicated an additional easement
fog the .bi.cyc.1e path .on Spring Creek Trail. to the City over and above that
required by The Pinnacle P.U.D.; and.
WHEREAS, it is equitable *that the storm drainage easement requested by
the Partnership be permitted in consideration for the Partnership's
previous dedication of an additional easement for trail purposes; and .
WHEREAS, the Parks and Recreation Department has agreed to.such trade
of easements; and
WHEREAS, the Partnership has agreed to accept the drainage easement
subject to certain conditions set forth below.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FORT
COLLINS that the Mayor be, and he hereby is, authorized to enter into an
Easement Agreement with the Pinnacle Partnership granting a permanent storm
drainage easement to said Partnership upon the following conditions:
1. That the easement shall not exceed 20 feet in width.,
2. That construction of improvements within the easement will be under
the City bike path and the use of the bike path by the cycling or
pedestrian public will'not be disrupted.
3. That all .trenches and excavations shall be properly filled,
original surface soil shall be replaced and reseeded in accordance
with -City specifications, acid- Pinnacle. Partnership shall be
responsible for any damages caused by installation, reinstallation,
maintenance and/or use of the 'storm drainage pipeline to be placed
in the easement.
N