Loading...
HomeMy WebLinkAboutPEAK VIEW SUBDIVISION - FDP - 26-00A - CORRESPONDENCE - LEGAL DOCUMENTSApr 11 02 09:05a Farley Family 970 490 2145 p.2 BLS DEVELOPMENT LLC 2402 CEDARWOOD DR. FT. COLLINS, CO 80526 (970)489-7309 Sheri Wamhoff City of Fort Collins 291 N. College Ave. Fort Collins, CO 80524 Dear Sheri, I would like to request that BLS Development be allowed to start construction on the box culvert, prior to issuing the letter of credit to the City. The bank is not able to close my construction loan until the Platt map is recorded and as you know that takes about two weeks after it is signed for it to be recorded through the County Clerks Office. Ted Shepard had stated that once the City signs they will allow me to start even though it is not recorded. It is very critical that we are able to start construction on the box culvert the week of April15th so that this can be completed prior to the ditch company needing to run water in the ditch the first of May. The box culvert is not part of the construction costs that are included in the letter of credit. I would suggest that we could add lounge to the development Agreement that construction of any improvement beyond the box culvert can not begin until the letter of credit is issued. I am willing to meet with you and Dave Stringer to discuss this matter and see if we can make this work. Thank you for your consideration in this matter and working with me to move this project forward this spring. Sincerely, Vicki Wagner cc: Dave Stringer Ted Shepard 6 Apr 11 02 09:05a Farley Family 970 490 2145 p.1 BLS Development- LLC 2402 Cedarwood Dr. Ft. Collins, CO. 80526 (970)493-7309 / 490-2145 (Fax/Phone) FAX TRANSMITTAL Date: _ ti - �U - U� Fax #: To: From: V VT..\ 4.1 NA O& o , — Number of Sheets including this cover sheet: �X_ _ For Your Information As Requested For Review and Approval Other: ki-V iw,4.. \f4� . "Hard Copy" WILL WILL NOT Follow by Mail