Loading...
HomeMy WebLinkAboutPEAK VIEW SUBDIVISION - PDP (RE-SUBMITTAL) - 26-00 - CORRESPONDENCE - (4)Project Y ute� Planner: l e r1�� Engineer. C\,4 V . TraM( Operations: Date: 6/o -------------- +- LON.f ULT /*NTt ON 104 . a a; o.1 73 Go OVEI- At& "AongWrs Ar._. Items Requested Site I land Plat I Utility Drainage R t Other Items Required Engineering X X X 1 -7.1 t IKCuc.11 4.3 Redlined Items Being Returned Site land I Plat I Utility Drainage R t Other Items Being Returned x X Stotmwater Water/Wastewate X X n X x /,4, x x x X Traffic Operations . Trans. Planning TranOrt Natural Resources Park Planning Totals Other: Hate: All redilned items should be returned with the resubmittal/ rer(sions. 125 Issue Contact. Jeff Hill Include the following details on the detail sheets: concrete joint encasement, 3/4"-1" meter pit and manhole adjustment Zoning 109 Issue Contact. Gary Lopez 1. Zoning requires parking stall dimensions shown either as typicals or on one stall of each parking lot. 110 Issue Contact. Gary Lopez 2. Zoning requires that overall height (to ridge) be shown on elevations. 111 Issue Contact. Gary Lopez 3. Phasing is a bit confusing but I would interpret that phase is both to the north & south of phase 2 - would be correct? Be sure and return all of your redlined plans when you re -submit. If you have questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, TED SHEPARD City Planner 17 of 17 116 Issue Contact: Jeff Hill Field locate, show and label all existing utilities in West Elizabeth Street. Connection of proposed 8-inch watermain must be made on existing 8-inch CFC high pressure watermain in Elizabeth Street. Clearly define this and provide pothole information for existing 12-inch CFC water main along south side of Elizabeth. Will a lowering of the proposed 8-inch watermain be needed at this location? Provide an enlarged view of the intersection of Elizabeth and Peakview Drive showing all utilites. 117 Issue Contact. Jeff Hill Water services may not be located in driveways. 118 Issue Contact: Jeff Hill Provide 10 feet minimum separation between thrust blocks and other underground utilites. 119 Issue Contact: Jeff Hill Show proposed routing of gas and electric through this site. Is a utility coordination meeting needed for this development? 120 Issue Contact. Jeff Hill Show and label all meter pits and curb stops. Draw meter pits to scale and provide a 4 foot minimum separation between the outside wall of meter pits and all permanent structures 121 Issue Contact. Jeff Hill Place all manholes on the centerline of the streets when at all possible. 122 Issue Contact. Jeff Hill Place sanitary sewer service stationing on the plan views which are located on the plan and profile sheets. 123 Issue Contact: Jeff Hill All profiles must be corrected to show utility crossings, correct inverts, stations, lengths, etc. 124 Issue Contact. Jeff Hill Provide lowering details for all watermain lowerings. 16 of 17 104 105 106 107 Issue Contact: Wes Lamarque SWMM Comments 11. SWMM appendix, do not understand why you are using conveyance element (334) for your detention design when it is a detention pond in the Village West 8th Filing, is not near the area your are developing, and the rating curve was not changed from the original SWMM. Also, please provide a SWMM with your detention pond rating curve inserted into the appropriate location and the appropriate modifications made to the SWMM to simulate your development (100-year volume and appropriate release rate) and the effects on the system. Issue Contact: Wes Lamarque SWMM Comments 12. PV&L Bridge Calculations appendix, why is this called "Bridge Calculations" - is there a bridge in this analysis? Please provide documentation for the 254 cfs used as the PV&L capacity, FHWA chart numbers, entrance loss numbers, culvert inverts, tailwater elevation, detention pond volume calculations from SWMM, detention pond conceptual design drawing (how was the rating curve developed?), design of emergency overflow structure and sluice gate off canal into 4 x 8 box, plus any other assumptions or detailed information used in the design. Basically, provide more detail and design documentation and calculations. Also more clearly discuss and document that there is a pipe from the detention pond and an emergency spill structure on the PV&L directed to the Clearview channel/ponds Issue Contact. Wes Lamarque SWMM Comments 13. Drawing Sheet no. 4, should the outfall pipe from the detention pond not go all the way to the Clearview Channel/ponds as stated in the report? Show also the emergency spill structure pipe going to the appropriate outfall location stated in the report. Issue Contact. Wes Lamarque Erosion/Sediment Control Comments One or more City Stormwater required elements of an erosion/sediment control report and plan are missing. Please correct and resubmit. Water Wastewater Issue Contact. Jeff Hill Provide required landscape/ utility separation distances on the landscape plans. Show all water and sewer lines on the landscape plans. 3 Issue Contact: Jeff Hill Provide meter pits for all duplex and larger units 15 of 17 M. 100 101 102 103 Issue Contact: Wes Lamarque SWMM Comments 5. page 2, in the developed conditions section, please provide more discussion on why the canal is overtopping - how was this determined? Also, please include more discussion on the background and purpose of the emergency overflow structure and sluice in the PV&L. Include the location of the structure on the drawing. Issue Contact: Wes Lamarque SWMM Comments 6. page 3, please remove the sentences referring to Arapahoe County and Park Meadows; and provide documentation and design calculations if using the COE construction techniques - otherwise remove this reference as well. Issue Contact. Wes Lamarque SWMM Comments 7. The Peak View Drive crosses the PV&L; please include an analysis and documentation of the effects of this crossing on the PV&L - a hydraulic analysis using HEC-2 or HEC-RAS. Issue Contact: Wes Lamarque SWMM Comments 8. Please include a discussion in the text on the realignment of the PV&L and include the realignment on the drawing. Issue Contact., Wes Lamarque SWMM Comments 9. Hydrology appendix, please provide more documentation pertaining to the development of the rating curve, such as, pipe inverts, diameter, length, elevation -discharge data, more elevation detail in the elevation -volume data, combined discharge -volume data, etc. Issue Contact: Wes Lamarque SWMM Comments 10. SWMM appendix, please provide an input file which matches the output file. 14 of 17 91 Issue Contact: Wes Lamarque 18. Please provide an emergency spillway for the detention pond(s) and clearly show the spillway(s) on the grading and drainage plans. 92 Issue Contact., Wes Lamarque 19. Please include the off -site flows from the area that drains to the southwest corner of the site on Pleasant Valley Road in the hydrology and other calculations (inlet, pipe size, etc.) calculations. Also, please include the off -site flows in the calculations that enter the site near the northwest corner of the site. 93 Issue Contact: Wes Lamarque 20. Since the Siena PUD did not anticipate flows entering their site from this project, all the flows at design points I and J need to be captured. Please provide larger (or more efficient) inlets at this location or create a sump in the street to allow all the flows to be captured. 94 Issue Contact: Wes Lamarque SWMM Comments 1. Please ensure a professional engineer signs and stamps the cover letter for the report. 95 Issue Contact. Wes Lamarque SWMM Comments 2. page 1, please include in the site description that the site is in the Canal Importation Drainage Basin. Also include in this section, the site is not in a City regulated floodplain. 96 Issue Contact: Wes Lamarque SWMM Comments 3. page 2, please explain the last sentence in the third paragraph of the existing conditions section - .....masterplan describes the flow as being immediately upstream of the site". 97 Issue Contact: Wes Lamarque SWMM Comments 4. SWMM appendix, provide a legible output (could not read the summary output table - did not copy) and one that does not line wrap (decrease the font size to 7 so the lines do not wrap when printed). Also, please include in the text the changes made to the Canal Importation SWMM to produce the necessary output. 13 of 17 81 Issue Contact: Wes Lamarque 8. Please provide profiles and calculations for all storm sewers. See redline plans for additional comments (sheet 15) 82 Issue Contact: Wes Lamarque 9. Storm Sewer #3 needs clarification on the profile. Manholes must be installed at pipe junctions as per section 5.5 of Storm Drainage Design Criteria manual. 83 Issue Contact: Wes Lamarque 10. The grading in the pond on sheet 6 does not match the calculations given in the report. Please finalize the grading and or calculations. 84 Issue Contact: Wes Lamarque 11. Please calculate the time of concentration in the rational method by separating the overland flow time and gutter travel time per section 3.1.7 of the SDDC. Also, please use the "nevi' rainfall data for the hydrologic calculations. 85 Issue Contact: Wes Lamarque 12. Please show individual lot grading around the single-family unit lots. The Lot Grading example shown on sheet 6 is not adequate. An example of the acceptable method was provided (see sheet 6). Please limit cross lot flows. 86 1 Issue Contact. Wes Lamarque 13. Please correct the elevation for City of Fort Collins vertical control benchmark 22-97. 87 Issue Contact. Wes Lamarque 14. Please provide a detention pond summary on the drainage plan including 100-year WSEL, release rate, and volume. 88 Issue Contact: Wes Lamarque 15. Please provide details of the detention pond(s) and water quality structure (s). 89 Issue Contact. Wes Lamarque 16. Please provide a detail of the PV&L spill structure in the plans. Has backf low from the ditch spills been considered in the detention pond design? Will a backflow preventor be needed? Please address these issues with the detention pond and spill structure design. 90 Issue Contact. Wes Lamarque 17. Please provide details for all drainage facilities in the plans. 12 of 17 75 ►FV 77 78 79 M Issue Contact. Wes Lamarque 2. The outfalls from this site into the adjacent park are most likely not acceptable by the Parks and Recreation Department. Please contact them to discuss the outfall location and the possibility of piping these flows. As mentioned in the report, the possibility of expanding the park pond should also be discussed with them. Another possibility would be to outfall the site into the existing outfall storm sewer for Lory Ann Estates. Issue Contact. Wes Lamarque 3. Please provide written explanations in the text or the appendices of what changes have been made (if any) to the SWMM and HEC-2 models in the report. If either of these models have been modified, please provide documentation on what changes have been made. Also, please include a revised SWMM map and schematic and HEC-2 cross-section map. Also, as mentioned in the e-mail from Sue Paquette, the spillway design will need to be incorporated in the UNET model to determine the spillway's effect on the system as a whole and prove you are not creating a problem further upstream or downstream. Issue Contact. Wes Lamarque 4. Please include a discussion of water quality in the beginning of the report. Discuss why the southern portion of the site is not being detained and provide valid reasoning why a water quality variance should be granted for this portion of the site; if one is requested. Calculations for the water quality release rate and a detail of the water quality release structure are required. Detention volume for water quantity could be provided in the Overland Park ponds if they were enlarged. This would require an easement from the Parks Department. Water quality extended detention may be mitigated by the existing wetlands in the Park. Issue Contact. Wes Lamarque 5. It appears that there will be grading that occurs over the existing channel. The tie-ins for this portion of the grading will need to be more clearly defined. If a retaining wall needs to be installed here please include the top and bottom of wall elevations. Please include a detail of the box and invert elevations at the crossing. Issue Contact: Wes Lamarque 6. Please include a section in the report for signed copies of all easements (grading) obtained. Please also include a copy of the approval letter from the ditch company stating they are ok with ditch modification. Issue Contact: Wes Lamarque 7. The pond may need pans to facilitate low flows if the pond does not have a bottom slope of at least 2%. Standing water in the pond will not be allowed. 11 of 17 PFA 112 113 114 115 Issue Contact: Michael Chavez Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numeral on a contrasting background. 97 UFC 901.4.4 NOTE: 1) One address per multiplex cluster on the East side of Peak View Drive (2) posted next to main sidewalk visible from the street. 10-inch minimum. 2) Each multiplex shall have an alphabetical designation (A,B,C... ) per building. 10-inch minimum. 3) Each individual unit shall have a numerical designation with 6-inch minimum. Example: 1234 Peak View Drive Building A Unit #101 Issue Contact: Michael Chavez Water Supply: No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. Issue Contact. Michael Chavez Street Name: Street names shall be verified and reviewed by LETA and the City Planning Department prior to being put into service. 97 UFC 901.4.5 Issue Contact., Michael Chavez Required Access: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 97 UFC 901.3; 901.4.2; 902.2.1 Stormwater Utility 74 Issue Contact., Wes Lamarque 1. Please incorporate the spillway for the PV&L Canal into the design as discussed with Glen Schlueter previously and show on the plans. These flows will need to be routed to the regional pond southeast of the site. Please contact our office if you have any questions. 10 of 17 70 71 72 73 Issue Contact: Sheri Wamhoff Utility plans - Add a note to rotate the manhole so that the cover is not in the bike path. Issue Contact: Sheri Wamhoff Utility plans - What is detail 7-20B needed for? All streets are vertical curb. Issue Contact. Sheri Wamhoff Utility plans - Provide detail 7-29A identify values for x, y, w and t Issue Contact: Sheri Wamhoff Utility plans - Provide details 7-32A, 7-326, 11-01 F, 16-1, 16-4D Light & Power X: Issue Contact: Doug Martine 1. Electric facilities need to be shown on the utility plan. The developer's reply to previous comments (their reply #6) states "electric facilities and easements have been incorporated on the utility plans." A utility plan was not included in this review set, however the electric facilities could not be on it because L&P hasn't designed the system. The developer needs to contact L&P engineering to initiate the design. There is a $50.00 per lot deposit required before the electric system is designed. This deposit will be credited to the electric developoment charges if the final plan doesn't require a re -design of the electric system. 2. Streetlights need to be shown on the landscape plan & street tree locations adjusted to a minimum of 40 ft. from the lights. The streetlight plan will be includes as a part of the preliminary electric design (see #1 above). 9of17 63 64 65 67 .• Issue Contact: Sheri Wamhoff Utility plans - Pleasant Valley Road What type of curb exists on the property to the west? Will probably need to remove some of this curb and gutter to provide the necessary curb transition to the type r inlet. Will also need to saw cut and tie into a clean edge that is in good shape. This will need to be at or beyond the curb removal point. Utility plans - Pleasant Valley Road Need intersection elevations Issue Contact: Sheri Wamhoff Issue Contact: Sheri Wamhoff Utility plans - Pleasant Valley Road Need to show the area of repavement to the east. Will need to repave past the point where you are tying in with utilities. How are you tying in at this point? Curb transitions? Is their existing curb on the north side to tie into? Are you removing the temporary turnaround? Issue Contact. Sheri Wamhoff Utility plans - Pleasant Valley Road Have a couple of curves where you are not meeting min vertical curve design. (local) Issue Contact: Sheri Wamhoff Utility plans - Pleasant Valley Road What are the existing grades being tied into? Both ends Utility plans - Pleasant Valley Road Need to identify PCR points Issue Contact: Sheri Wamhoff Issue Contact: Sheri Wamhoff Utility plans - Pleasant Valley Road Need to indicate the points where you tie into existing grades. 8 of 17 56 57 58 59 .f 61 62 Issue Contact. Sheri Wamhoff Utility plans - Peak View Drive Have a vertical curve that does not meet min design requirements (local) Issue Contact. Sheri Wamhoff Utility plans - Peak View Drive The station on the plan view does not match the profile view. Issue Contact: Sheri Wamhoff Utility plans - Peak View Drive Row needs to be dedicated to encompass the entire structure (culvert) Issue Contact. Sheri Wamhoff Utility plans - Peak View Drive Need to show and locate and identify the driveway widths. Issue Contact. Sheri Wamhoff Utility plans - Peak View Drive Need to see the culvert/ structure design. See sample notes - make sure this info is provided as it applies to this structure. Issue Contact: Sheri Wamhoff Utility plans - Peak View Drive Provide intersection elevations and use directional ramps Issue Contact., Sheri Wamhoff Utility plans - Pleasant Valley Road Where is the 10-foot sidewalk transition occurring? On this property or on the property to the west? rrnirN 49 50 51 52 53 54 55 Issue Contact. Sheri Wamhoff Utility plans - Elizabeth Street Provide intersection elevations and indicate what the radius of the curb return is. Issue Contact: Sheri Wamhoff Utility plans - Elizabeth Street What are the lines going out to Eliz Street? They look like they could be curb chases but they are not labeled as such any place and curb chase details have not been provided. Issue Contact. Sheri Wamhoff Utility plans - Elizabeth Street Show where the row lines are adjacent to and across from the site. Issue Contact: Sheri Wamhoff Utility plans - Elizabeth Street Provide curb return information on this sheet or on the profile for Peakview Drive Issue Contact: Sheri Wamhoff Utility plans - Elizabeth Street Provide a correct x-section for the road. Need to show what it will look like with the improvements you are providing and also indicate where the future curb gutter and walk will be on the north. Need to show the interim lane configuration and show the ultimate (typically this is done by showing the ultimate lane configuration under the section as I have drawn it). Utility plans - Peak View Drive Provide curb return radii Utility plans - Peak View Drive Have greater than allowed grade breaks 6 of 17 Issue Contact: Sheri Wamhoff Issue Contact: Sheri Wamhoff 37 LLI 41 42 43 44 45 46 47 i; Issue Contact., Sheri Wamhoff utility plans eliz street note indicates that there is an intersection detail sheet - where is this? Site plan - Provide directional ramps Issue Contact: Sheri Wamhoff Issue Contact. Sheri Wamhoff Site plan - rotate manhole that is in walk so that the cover is not in the sidewalk Site plan - provide sight distance easements as shown Issue Contact. Sheri Wamhoff Issue Contact: Sheri Wamhoff Site plan - need to show driveway location for the single family lots. Site plan - See plans for additional comments Issue Contact. Sheri Wamhoff Issue Contact. Sheri Wamhoff Landscape plan - Show the sight distance easement and provide sight distance note Issue Contact: Sheri Wamhoff Landscape plan - Need to show where the driveways are to be located for the single-family lots. This will effect tree placement. Landscape plan - See additional comments on the plans Issue Contact: Sheri Wamhoff Issue Contact: Sheri Wamhoff Utility plans - Elizabeth Street Will need to see if the existing road section meets ultimate design - may not be able to just add pavement to the edge of the roadway as shown. The x-section of the road needs to meet ultimate design and any tie in to existing pavement will need to be at a lane line or center of a lane. Therefore it is important to know what the striping on this street will be. 5 of 17 Nc 31 32 33 34 35 KI Issue Contact: Sheri Wamhoff utility plans need to show the driveway locations for the single family lots. they will need to be set as they affect the utiltiiy and tree placement and since the streets have vertical curb they will need to be built at the same time the curb is being poured. Keep in mind that the driveways need to 12 feet apart (edge to edge) and that waterwastewater will not normally allow the waterline to be under the driveway. Have been allowing the sewer under the driveway in some situations though. utilityplans elizabeth street provide existing grade being tied into utiltiyplans eliz street have greater than allowed grade breaks utiltiy plans eliz street show the cross pan in the profile utilty plans eliz street provide centerline profile utility plans eliz street provide cross sections (50 ft intervals) utility plans eliz street provide striping plan for the interim striping Issue Contact: Sheri Wamhoff Issue Contact. Sheri Wamhoff Issue Contact. Sheri Wamhoff Issue Contact: Sheri Wamhoff Issue Contact: Sheri Wamhoff Issue Contact. Sheri Wamhoff Issue Contact. Sheri Wamhoff utility plans eliz street how does the north flowline profile tie into the existing grades shown? 4 of 17 21 22 23 24 25 26 27 M1 Issue Contact. Sheri Wamhoff Utility plans need grading easements for work outside the platted boundaries. Show the easments that are needed. Letters of intent for the easements will be needed before this item can be scheduled for hearing Issue Contact: Sheri Wamhoff utitlity plans per section 9.4.11 no more than 500 sq ft of driveway can drain across a walk - you have more thatn that draining across the driveway at the north east access drive Issue Contact: Sheri Wamhoff Utiltiy plans need to show how the driveway transitions out, show that it is sheet flow accross the drive. Issue Contact. Sheri Wamhoff Utiltiy plans what do the driveway sections look like? Is there a crown? is there curb and gutter? are they concret or asphalt? utiltiy plans sheet 7 have some conflicts in the dimensioning Issue Contact: Sheri Wamhoff Issue Contact: Sheri Wamhoff utiltiy plans not meeting the tangent between curve requirements for some of the curves. Issue Contact: Sheri Wamhoff utility plans only really need one ramp on the south side of pleasenet valley road at the intersection with peak view drive but can provide two if you like. Issue Contact. Sheri Wamhoff utitity plans The min curve length per the standards table 7-5 is 100 feet. not meeting this on two of the southern curves. The western one needs to be lengthened so as to take the kink out of the road. I can support a variance request for the lenght of the other one 3 of 17 11 12 14 15 16 17 M. 19 20 Plat indicate who is to own and maintain all tracts Issue Contact., Sheri Wamhoff Issue Contact: Sheri Wamhoff Plat identify the row line on the north - where is it how much is there Issue Contact: Sheri Wamhoff plat where is the row on th adj parcels and how much is there. Issue Contact. Sheri Wamhoff plat need to provide radius at the corner of row for the row and easements Issue Contact: Sheri Wamhoff plat most of the abriviations that are used within the document are not contained within the list provided at the top plat not meeting min tangent requirements Issue Contact. Sheri Wamhoff Issue Contact: Sheri Wamhoff Plat show sight distance easements and provide the sight distance easement language Issue Contact., Sheri Wamhoff plat what do the lines on the bottom left corner represent? Issue Contact: Sheri Wamhoff Utility plans show the off site easeements needed - indicate that they are to be provided by seperate document 2 of 17 STAFF PROJECT REVIEW City of Tort Collins DESIGN DEVELOPMENT CONSULTANTS Date: 8/14/01 DONALD LEFFLER 2627 REDWING RD. #350 FT. COLLINS, CO 80526 Staff has reviewed your submittal for PEAK VIEW SUBDIVISION PDP - TYPE II (LUC) #26- 00, and we offer the following comments: ISSUES: Engineering 4 Issue Contact: Sheri Wamhoff Site Plan - per section 3.6.2(L)(4) of the luc add notice for private drives (see attached for recommended wording) 5 Issue Contact: Sheri Wamhoff Landscape plan - Do not provide a the utility signature block on the plan - this sheet is not signed off by the utilities 6 Issue Contact. Sheri Wamhoff Utiltiy Plans Use the attached list of general notes 7 Issue Contact. Sheri Wamhoff Utility Plans - Add imdenifiacation staement section 3.3.1.F 8 Issue Contact: Sheri Wamhoff Utility Plans Provide typical street sections on the cover sheet see section 3.3.1.E 9 Issue Contact: Sheri Wamhoff Plat modify the repair and guarentee statement as shown on the plat. 10 Issue Contact: Sheri Wamhoff Plat Add notice for private streeets and drives 1 of 17