HomeMy WebLinkAboutPEAK VIEW SUBDIVISION - PDP (RE-SUBMITTAL) - 26-00 - CORRESPONDENCE - (4)Project Y ute�
Planner: l e r1��
Engineer. C\,4 V .
TraM( Operations:
Date: 6/o
--------------
+-
LON.f ULT /*NTt ON
104 . a a; o.1 73 Go
OVEI- At& "AongWrs
Ar._.
Items Requested
Site I land Plat I Utility Drainage R t Other Items Required
Engineering X X X 1 -7.1
t IKCuc.11 4.3
Redlined Items Being Returned
Site land I Plat I Utility Drainage R t Other Items Being Returned
x X
Stotmwater
Water/Wastewate
X
X
n
X
x
/,4,
x
x
x
X
Traffic Operations
.
Trans. Planning
TranOrt
Natural Resources
Park Planning
Totals
Other:
Hate: All redilned items should be returned with the resubmittal/ rer(sions.
125 Issue Contact. Jeff Hill
Include the following details on the detail sheets: concrete joint encasement,
3/4"-1" meter pit and manhole adjustment
Zoning
109 Issue Contact. Gary Lopez
1. Zoning requires parking stall dimensions shown either as typicals or on one
stall of each parking lot.
110 Issue Contact. Gary Lopez
2. Zoning requires that overall height (to ridge) be shown on elevations.
111 Issue Contact. Gary Lopez
3. Phasing is a bit confusing but I would interpret that phase is both to the north
& south of phase 2 - would be correct?
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
TED SHEPARD
City Planner
17 of 17
116 Issue Contact: Jeff Hill
Field locate, show and label all existing utilities in West Elizabeth Street.
Connection of proposed 8-inch watermain must be made on existing 8-inch
CFC high pressure watermain in Elizabeth Street. Clearly define this and
provide pothole information for existing 12-inch CFC water main along south
side of Elizabeth. Will a lowering of the proposed 8-inch watermain be needed
at this location? Provide an enlarged view of the intersection of Elizabeth and
Peakview Drive showing all utilites.
117 Issue Contact. Jeff Hill
Water services may not be located in driveways.
118 Issue Contact: Jeff Hill
Provide 10 feet minimum separation between thrust blocks and other
underground utilites.
119 Issue Contact: Jeff Hill
Show proposed routing of gas and electric through this site. Is a utility
coordination meeting needed for this development?
120 Issue Contact. Jeff Hill
Show and label all meter pits and curb stops. Draw meter pits to scale and
provide a 4 foot minimum separation between the outside wall of meter pits and
all permanent structures
121 Issue Contact. Jeff Hill
Place all manholes on the centerline of the streets when at all possible.
122 Issue Contact. Jeff Hill
Place sanitary sewer service stationing on the plan views which are located on
the plan and profile sheets.
123 Issue Contact: Jeff Hill
All profiles must be corrected to show utility crossings, correct inverts, stations,
lengths, etc.
124 Issue Contact. Jeff Hill
Provide lowering details for all watermain lowerings.
16 of 17
104
105
106
107
Issue Contact: Wes Lamarque
SWMM Comments
11. SWMM appendix, do not understand why you are using conveyance
element (334) for your detention design when it is a detention pond in the
Village West 8th Filing, is not near the area your are developing, and the rating
curve was not changed from the original SWMM. Also, please provide a
SWMM with your detention pond rating curve inserted into the appropriate
location and the appropriate modifications made to the SWMM to simulate your
development (100-year volume and appropriate release rate) and the effects on
the system.
Issue Contact: Wes Lamarque
SWMM Comments
12. PV&L Bridge Calculations appendix, why is this called "Bridge Calculations"
- is there a bridge in this analysis? Please provide documentation for the 254
cfs used as the PV&L capacity, FHWA chart numbers, entrance loss numbers,
culvert inverts, tailwater elevation, detention pond volume calculations from
SWMM, detention pond conceptual design drawing (how was the rating curve
developed?), design of emergency overflow structure and sluice gate off canal
into 4 x 8 box, plus any other assumptions or detailed information used in the
design. Basically, provide more detail and design documentation and
calculations. Also more clearly discuss and document that there is a pipe from
the detention pond and an emergency spill structure on the PV&L directed to
the Clearview channel/ponds
Issue Contact. Wes Lamarque
SWMM Comments
13. Drawing Sheet no. 4, should the outfall pipe from the detention pond not go
all the way to the Clearview Channel/ponds as stated in the report? Show also
the emergency spill structure pipe going to the appropriate outfall location
stated in the report.
Issue Contact. Wes Lamarque
Erosion/Sediment Control Comments
One or more City Stormwater required elements of an erosion/sediment control
report and plan are missing. Please correct and resubmit.
Water Wastewater
Issue Contact. Jeff Hill
Provide required landscape/ utility separation distances on the landscape plans.
Show all water and sewer lines on the landscape plans.
3 Issue Contact: Jeff Hill
Provide meter pits for all duplex and larger units
15 of 17
M.
100
101
102
103
Issue Contact: Wes Lamarque
SWMM Comments
5. page 2, in the developed conditions section, please provide more discussion
on why the canal is overtopping - how was this determined? Also, please
include more discussion on the background and purpose of the emergency
overflow structure and sluice in the PV&L. Include the location of the structure
on the drawing.
Issue Contact: Wes Lamarque
SWMM Comments
6. page 3, please remove the sentences referring to Arapahoe County and Park
Meadows; and provide documentation and design calculations if using the COE
construction techniques - otherwise remove this reference as well.
Issue Contact. Wes Lamarque
SWMM Comments
7. The Peak View Drive crosses the PV&L; please include an analysis and
documentation of the effects of this crossing on the PV&L - a hydraulic analysis
using HEC-2 or HEC-RAS.
Issue Contact: Wes Lamarque
SWMM Comments
8. Please include a discussion in the text on the realignment of the PV&L and
include the realignment on the drawing.
Issue Contact., Wes Lamarque
SWMM Comments
9. Hydrology appendix, please provide more documentation pertaining to the
development of the rating curve, such as, pipe inverts, diameter, length,
elevation -discharge data, more elevation detail in the elevation -volume data,
combined discharge -volume data, etc.
Issue Contact: Wes Lamarque
SWMM Comments
10. SWMM appendix, please provide an input file which matches the output file.
14 of 17
91 Issue Contact: Wes Lamarque
18. Please provide an emergency spillway for the detention pond(s) and clearly
show the spillway(s) on the grading and drainage plans.
92 Issue Contact., Wes Lamarque
19. Please include the off -site flows from the area that drains to the southwest
corner of the site on Pleasant Valley Road in the hydrology and other
calculations (inlet, pipe size, etc.) calculations. Also, please include the off -site
flows in the calculations that enter the site near the northwest corner of the site.
93 Issue Contact: Wes Lamarque
20. Since the Siena PUD did not anticipate flows entering their site from this
project, all the flows at design points I and J need to be captured. Please
provide larger (or more efficient) inlets at this location or create a sump in the
street to allow all the flows to be captured.
94 Issue Contact: Wes Lamarque
SWMM Comments
1. Please ensure a professional engineer signs and stamps the cover letter for
the report.
95 Issue Contact. Wes Lamarque
SWMM Comments
2. page 1, please include in the site description that the site is in the Canal
Importation Drainage Basin. Also include in this section, the site is not in a City
regulated floodplain.
96 Issue Contact: Wes Lamarque
SWMM Comments
3. page 2, please explain the last sentence in the third paragraph of the existing
conditions section - .....masterplan describes the flow as being immediately
upstream of the site".
97 Issue Contact: Wes Lamarque
SWMM Comments
4. SWMM appendix, provide a legible output (could not read the summary
output table - did not copy) and one that does not line wrap (decrease the font
size to 7 so the lines do not wrap when printed). Also, please include in the text
the changes made to the Canal Importation SWMM to produce the necessary
output.
13 of 17
81 Issue Contact: Wes Lamarque
8. Please provide profiles and calculations for all storm sewers. See redline
plans for additional comments (sheet 15)
82 Issue Contact: Wes Lamarque
9. Storm Sewer #3 needs clarification on the profile. Manholes must be
installed at pipe junctions as per section 5.5 of Storm Drainage Design Criteria
manual.
83 Issue Contact: Wes Lamarque
10. The grading in the pond on sheet 6 does not match the calculations given in
the report. Please finalize the grading and or calculations.
84 Issue Contact: Wes Lamarque
11. Please calculate the time of concentration in the rational method by
separating the overland flow time and gutter travel time per section 3.1.7 of the
SDDC. Also, please use the "nevi' rainfall data for the hydrologic calculations.
85 Issue Contact: Wes Lamarque
12. Please show individual lot grading around the single-family unit lots. The
Lot Grading example shown on sheet 6 is not adequate. An example of the
acceptable method was provided (see sheet 6). Please limit cross lot flows.
86 1 Issue Contact. Wes Lamarque
13. Please correct the elevation for City of Fort Collins vertical control
benchmark 22-97.
87 Issue Contact. Wes Lamarque
14. Please provide a detention pond summary on the drainage plan including
100-year WSEL, release rate, and volume.
88 Issue Contact: Wes Lamarque
15. Please provide details of the detention pond(s) and water quality structure
(s).
89 Issue Contact. Wes Lamarque
16. Please provide a detail of the PV&L spill structure in the plans. Has
backf low from the ditch spills been considered in the detention pond design?
Will a backflow preventor be needed? Please address these issues with the
detention pond and spill structure design.
90 Issue Contact. Wes Lamarque
17. Please provide details for all drainage facilities in the plans.
12 of 17
75
►FV
77
78
79
M
Issue Contact. Wes Lamarque
2. The outfalls from this site into the adjacent park are most likely not
acceptable by the Parks and Recreation Department. Please contact them to
discuss the outfall location and the possibility of piping these flows. As
mentioned in the report, the possibility of expanding the park pond should also
be discussed with them. Another possibility would be to outfall the site into the
existing outfall storm sewer for Lory Ann Estates.
Issue Contact. Wes Lamarque
3. Please provide written explanations in the text or the appendices of what
changes have been made (if any) to the SWMM and HEC-2 models in the
report. If either of these models have been modified, please provide
documentation on what changes have been made. Also, please include a
revised SWMM map and schematic and HEC-2 cross-section map. Also, as
mentioned in the e-mail from Sue Paquette, the spillway design will need to be
incorporated in the UNET model to determine the spillway's effect on the
system as a whole and prove you are not creating a problem further upstream
or downstream.
Issue Contact. Wes Lamarque
4. Please include a discussion of water quality in the beginning of the report.
Discuss why the southern portion of the site is not being detained and provide
valid reasoning why a water quality variance should be granted for this portion
of the site; if one is requested. Calculations for the water quality release rate
and a detail of the water quality release structure are required. Detention
volume for water quantity could be provided in the Overland Park ponds if they
were enlarged. This would require an easement from the Parks Department.
Water quality extended detention may be mitigated by the existing wetlands in
the Park.
Issue Contact. Wes Lamarque
5. It appears that there will be grading that occurs over the existing channel.
The tie-ins for this portion of the grading will need to be more clearly defined. If
a retaining wall needs to be installed here please include the top and bottom of
wall elevations. Please include a detail of the box and invert elevations at the
crossing.
Issue Contact: Wes Lamarque
6. Please include a section in the report for signed copies of all easements
(grading) obtained. Please also include a copy of the approval letter from the
ditch company stating they are ok with ditch modification.
Issue Contact: Wes Lamarque
7. The pond may need pans to facilitate low flows if the pond does not have a
bottom slope of at least 2%. Standing water in the pond will not be allowed.
11 of 17
PFA
112
113
114
115
Issue Contact: Michael Chavez
Address Numerals:
Address numerals shall be visible from the street fronting the property, and
posted with a minimum of 6-inch numeral on a contrasting background. 97 UFC
901.4.4
NOTE:
1) One address per multiplex cluster on the East side of Peak View Drive (2)
posted next to main sidewalk visible from the street. 10-inch minimum.
2) Each multiplex shall have an alphabetical designation (A,B,C... ) per building.
10-inch minimum.
3) Each individual unit shall have a numerical designation with 6-inch minimum.
Example: 1234 Peak View Drive
Building A
Unit #101
Issue Contact: Michael Chavez
Water Supply:
No commercial building can be greater then 300 feet from a fire hydrant. Fire
hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per
minute at a residual pressure of 20 psi.
Issue Contact. Michael Chavez
Street Name:
Street names shall be verified and reviewed by LETA and the City Planning
Department prior to being put into service. 97 UFC 901.4.5
Issue Contact., Michael Chavez
Required Access:
A fire lane is required. The fire lane shall be visible by painting and signage,
and maintained unobstructed. 97 UFC 901.3; 901.4.2; 902.2.1
Stormwater Utility
74
Issue Contact., Wes Lamarque
1. Please incorporate the spillway for the PV&L Canal into the design as
discussed with Glen Schlueter previously and show on the plans. These flows
will need to be routed to the regional pond southeast of the site. Please contact
our office if you have any questions.
10 of 17
70
71
72
73
Issue Contact: Sheri Wamhoff
Utility plans -
Add a note to rotate the manhole so that the cover is not in the bike path.
Issue Contact: Sheri Wamhoff
Utility plans -
What is detail 7-20B needed for? All streets are vertical curb.
Issue Contact. Sheri Wamhoff
Utility plans -
Provide detail 7-29A identify values for x, y, w and t
Issue Contact: Sheri Wamhoff
Utility plans -
Provide details 7-32A, 7-326, 11-01 F, 16-1, 16-4D
Light & Power
X:
Issue Contact: Doug Martine
1. Electric facilities need to be shown on the utility plan. The developer's reply
to previous comments (their reply #6) states "electric facilities and easements
have been incorporated on the utility plans." A utility plan was not included in
this review set, however the electric facilities could not be on it because L&P
hasn't designed the system. The developer needs to contact L&P engineering
to initiate the design. There is a $50.00 per lot deposit required before the
electric system is designed. This deposit will be credited to the electric
developoment charges if the final plan doesn't require a re -design of the electric
system.
2. Streetlights need to be shown on the landscape plan & street tree locations
adjusted to a minimum of 40 ft. from the lights. The streetlight plan will be
includes as a part of the preliminary electric design (see #1 above).
9of17
63
64
65
67
.•
Issue Contact: Sheri Wamhoff
Utility plans -
Pleasant Valley Road
What type of curb exists on the property to the west? Will probably need to
remove some of this curb and gutter to provide the necessary curb transition to
the type r inlet. Will also need to saw cut and tie into a clean edge that is in
good shape. This will need to be at or beyond the curb removal point.
Utility plans -
Pleasant Valley Road
Need intersection elevations
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Utility plans -
Pleasant Valley Road
Need to show the area of repavement to the east. Will need to repave past the
point where you are tying in with utilities. How are you tying in at this point?
Curb transitions? Is their existing curb on the north side to tie into? Are you
removing the temporary turnaround?
Issue Contact. Sheri Wamhoff
Utility plans -
Pleasant Valley Road
Have a couple of curves where you are not meeting min vertical curve design.
(local)
Issue Contact: Sheri Wamhoff
Utility plans -
Pleasant Valley Road
What are the existing grades being tied into? Both ends
Utility plans -
Pleasant Valley Road
Need to identify PCR points
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Utility plans -
Pleasant Valley Road
Need to indicate the points where you tie into existing grades.
8 of 17
56
57
58
59
.f
61
62
Issue Contact. Sheri Wamhoff
Utility plans -
Peak View Drive
Have a vertical curve that does not meet min design requirements (local)
Issue Contact. Sheri Wamhoff
Utility plans -
Peak View Drive
The station on the plan view does not match the profile view.
Issue Contact: Sheri Wamhoff
Utility plans -
Peak View Drive
Row needs to be dedicated to encompass the entire structure (culvert)
Issue Contact. Sheri Wamhoff
Utility plans -
Peak View Drive
Need to show and locate and identify the driveway widths.
Issue Contact. Sheri Wamhoff
Utility plans -
Peak View Drive
Need to see the culvert/ structure design. See sample notes - make sure this
info is provided as it applies to this structure.
Issue Contact: Sheri Wamhoff
Utility plans -
Peak View Drive
Provide intersection elevations and use directional ramps
Issue Contact., Sheri Wamhoff
Utility plans -
Pleasant Valley Road
Where is the 10-foot sidewalk transition occurring? On this property or on the
property to the west?
rrnirN
49
50
51
52
53
54
55
Issue Contact. Sheri Wamhoff
Utility plans -
Elizabeth Street
Provide intersection elevations and indicate what the radius of the curb return
is.
Issue Contact: Sheri Wamhoff
Utility plans -
Elizabeth Street
What are the lines going out to Eliz Street? They look like they could be curb
chases but they are not labeled as such any place and curb chase details have
not been provided.
Issue Contact. Sheri Wamhoff
Utility plans -
Elizabeth Street
Show where the row lines are adjacent to and across from the site.
Issue Contact: Sheri Wamhoff
Utility plans -
Elizabeth Street
Provide curb return information on this sheet or on the profile for Peakview
Drive
Issue Contact: Sheri Wamhoff
Utility plans -
Elizabeth Street
Provide a correct x-section for the road. Need to show what it will look like with the improvements
you are providing and also indicate where the future curb gutter and walk will be on the north. Need
to show the interim lane configuration and show the ultimate (typically this is done by showing the
ultimate lane configuration under the section as I have drawn it).
Utility plans -
Peak View Drive
Provide curb return radii
Utility plans -
Peak View Drive
Have greater than allowed grade breaks
6 of 17
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
37
LLI
41
42
43
44
45
46
47
i;
Issue Contact., Sheri Wamhoff
utility plans
eliz street
note indicates that there is an intersection detail sheet - where is this?
Site plan -
Provide directional ramps
Issue Contact: Sheri Wamhoff
Issue Contact. Sheri Wamhoff
Site plan -
rotate manhole that is in walk so that the cover is not in the sidewalk
Site plan -
provide sight distance easements as shown
Issue Contact. Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Site plan -
need to show driveway location for the single family lots.
Site plan -
See plans for additional comments
Issue Contact. Sheri Wamhoff
Issue Contact. Sheri Wamhoff
Landscape plan -
Show the sight distance easement and provide sight distance note
Issue Contact: Sheri Wamhoff
Landscape plan -
Need to show where the driveways are to be located for the single-family lots.
This will effect tree placement.
Landscape plan -
See additional comments on the plans
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Utility plans -
Elizabeth Street
Will need to see if the existing road section meets ultimate design - may not be
able to just add pavement to the edge of the roadway as shown. The x-section
of the road needs to meet ultimate design and any tie in to existing pavement
will need to be at a lane line or center of a lane. Therefore it is important to
know what the striping on this street will be.
5 of 17
Nc
31
32
33
34
35
KI
Issue Contact: Sheri Wamhoff
utility plans
need to show the driveway locations for the single family lots. they will need to
be set as they affect the utiltiiy and tree placement and since the streets have
vertical curb they will need to be built at the same time the curb is being poured.
Keep in mind that the driveways need to 12 feet apart (edge to edge) and that
waterwastewater will not normally allow the waterline to be under the driveway.
Have been allowing the sewer under the driveway in some situations though.
utilityplans
elizabeth street
provide existing grade being tied into
utiltiyplans
eliz street
have greater than allowed grade breaks
utiltiy plans
eliz street
show the cross pan in the profile
utilty plans
eliz street
provide centerline profile
utility plans
eliz street
provide cross sections (50 ft intervals)
utility plans
eliz street
provide striping plan for the interim striping
Issue Contact: Sheri Wamhoff
Issue Contact. Sheri Wamhoff
Issue Contact. Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Issue Contact. Sheri Wamhoff
Issue Contact. Sheri Wamhoff
utility plans
eliz street
how does the north flowline profile tie into the existing grades shown?
4 of 17
21
22
23
24
25
26
27
M1
Issue Contact. Sheri Wamhoff
Utility plans
need grading easements for work outside the platted boundaries. Show the
easments that are needed. Letters of intent for the easements will be needed
before this item can be scheduled for hearing
Issue Contact: Sheri Wamhoff
utitlity plans
per section 9.4.11 no more than 500 sq ft of driveway can drain across a walk -
you have more thatn that draining across the driveway at the north east access
drive
Issue Contact: Sheri Wamhoff
Utiltiy plans
need to show how the driveway transitions out, show that it is sheet flow
accross the drive.
Issue Contact. Sheri Wamhoff
Utiltiy plans
what do the driveway sections look like? Is there a crown?
is there curb and gutter?
are they concret or asphalt?
utiltiy plans
sheet 7
have some conflicts in the dimensioning
Issue Contact: Sheri Wamhoff
Issue Contact: Sheri Wamhoff
utiltiy plans
not meeting the tangent between curve requirements for some of the curves.
Issue Contact: Sheri Wamhoff
utility plans
only really need one ramp on the south side of pleasenet valley road at the
intersection with peak view drive but can provide two if you like.
Issue Contact. Sheri Wamhoff
utitity plans
The min curve length per the standards table 7-5 is 100 feet. not meeting this
on two of the southern curves. The western one needs to be lengthened so as
to take the kink out of the road. I can support a variance request for the lenght
of the other one
3 of 17
11
12
14
15
16
17
M.
19
20
Plat
indicate who is to own and maintain all tracts
Issue Contact., Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Plat
identify the row line on the north - where is it how much is there
Issue Contact: Sheri Wamhoff
plat
where is the row on th adj parcels and how much is there.
Issue Contact. Sheri Wamhoff
plat
need to provide radius at the corner of row for the row and easements
Issue Contact: Sheri Wamhoff
plat
most of the abriviations that are used within the document are not contained
within the list provided at the top
plat
not meeting min tangent requirements
Issue Contact. Sheri Wamhoff
Issue Contact: Sheri Wamhoff
Plat
show sight distance easements and provide the sight distance easement
language
Issue Contact., Sheri Wamhoff
plat
what do the lines on the bottom left corner represent?
Issue Contact: Sheri Wamhoff
Utility plans
show the off site easeements needed - indicate that they are to be provided by
seperate document
2 of 17
STAFF PROJECT REVIEW
City of Tort Collins
DESIGN DEVELOPMENT CONSULTANTS Date: 8/14/01
DONALD LEFFLER
2627 REDWING RD. #350
FT. COLLINS, CO 80526
Staff has reviewed your submittal for PEAK VIEW SUBDIVISION PDP - TYPE II (LUC) #26-
00, and we offer the following comments:
ISSUES:
Engineering
4 Issue Contact: Sheri Wamhoff
Site Plan -
per section 3.6.2(L)(4) of the luc add notice for private drives (see attached for
recommended wording)
5 Issue Contact: Sheri Wamhoff
Landscape plan -
Do not provide a the utility signature block on the plan - this sheet is not signed
off by the utilities
6 Issue Contact. Sheri Wamhoff
Utiltiy Plans
Use the attached list of general notes
7 Issue Contact. Sheri Wamhoff
Utility Plans -
Add imdenifiacation staement section 3.3.1.F
8 Issue Contact: Sheri Wamhoff
Utility Plans
Provide typical street sections on the cover sheet see section 3.3.1.E
9 Issue Contact: Sheri Wamhoff
Plat
modify the repair and guarentee statement as shown on the plat.
10 Issue Contact: Sheri Wamhoff
Plat
Add notice for private streeets and drives
1 of 17