HomeMy WebLinkAboutPLANTATION MANOR - PDP - 39-00 - CORRESPONDENCE - (9)23
REPEAT REPEAT REPEAT
LANDSCAPE PLAN
- SITE LEGEND NEEDS TO BE ON SITE PLAN - NO
24
REPEAT REPEAT REPEAT - ON LANDSCAPING PLANTING NOTES RE:
INSTALLAITON OF LANDSCAPING - REMOVE OWRDING HAVING TO DO WITH
PHASING - THIS PROJECT IS TOO SMALL FOR PHASING
25
REPEAT - TED - I DON'T WANT TO SEE THIS ONE AGAIN UNTIL THEY START
MAKING THE CHANGES OR PROVIDE ME WITH INFORMATION AS TO WHY THEY
ARE IGNORING MY COMMENTS. THANKS!!
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
TED SHEPARD
City Planner
Pa_c 3
Electric meter locations will need to be coordinated with Light and Power, and they must
be 'ganged' on the ends of the buildings.
Department: Police Issue Contact: Joseph Gerdom
18
Planting plan between buildings will create potential security/safety problems.
Insufficient information on lighting.
Department: Stormwater Utility Issue Contact: Wes Lamarque
19
Please revise landscape plan to have 10 feet of separation between storm sewer and all
trees. A note is not adequate, plans need to show what is actually going to be built.
Department: Transportation Planning Issue Contact: Mark Jackson
40
No further comments
Department: Water Wastewater Issue Contact: Jeff Hill
8
Coordinate landscape design with civil design. Correctly show all water and sewer lines
on the landscape plans.
41
Coordinate all sheets of the utility plans to reflect the same information.
42
Clearly define the encasement of the storm sewers over water mains as concrete encasement..
Department: Zoning Issue Contact: Jenny Nuckols
21
REPEAT REPEAT REPEAT - DID NOT RECEIVE ELEVATIONS THIS ROUND - WILL
THE ELEVATIONS FOR UNITS 29-38 BE THE SAME SIMILAR TO THE OTHER
BUILDINGS.
22
REPEAT REPEAT - PARKING AREAS ALONG EAST AND WEST SIDES NEED TO
BE SCREENED
Page 2
v` 4
STAF�. vG WEVIEWrMAOA
F PROJECT
Citv of Fort Collins
BRET LARIMER Date: 11/7/2001
1600 W. HORSETOOTH RD.
FT. COLLINS, CO 80526
Staff has reviewed your submittal for PLANTATION MANOR PDP -TYPE II #39-00, and we
offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
29
Add note to plat regarding maintenance responsibility of drives,tracts and sidewalk/curb
and gutter
30
look at eliptical, tongue and groove or ductile iron pipe to provide better cover over pipe
on Big Ben
1�
�V 31
Are off -site easements needed for storm sewer work on south side of Horsetooth?
Iv
32
Sidewalk issue to east property still needs to be addressed
33
Does existing sign/signal at west end of Horsetooth and project limits need to be
relocated?
Department: Light & Power Issue Contact: Doug Martine
26
Water service from Big Bend Dr. to building #2 needs to be moved to be 10 ft. south of
the sewer service. This is necessary to provide space for the electric service to the
building.
28
Pa,,e I