HomeMy WebLinkAboutPINNACLE TOWNHOMES - FDP - 34-00B - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTI
Geotechnical Engineering Report
Pinnacle P.U.D. — Townhomes
Project No. 20015202
APPENDIX A
Site Plan/Boring Location Diagram
Test Borings/Piezometers
APPENDIX B
Laboratory Test Results
APPENDIX C
General Notes
Pavement Preventative Maintenance Notes
1
1
IV
Terracon
TABLE OF CONTENTS
Letter of Transmittal..........................................................................................Page No.
..............ge i
INTRODUCTION.................................................................................................................1
PREVIOUS EXPLORATIONS.............................................................................................1
PROPOSED CONSTRUCTION.:........................................................................................ 2
SITEEXPLORATION.......................................................................................................... 3
FieldExploration......................................................................................................3
LaboratoryTesting..................................................................................................4
SITECONDITIONS.............................................................................................................4
Geology................................................................................................................... 5
SoilConditions...................................................................................................:.... 5
Field and Laboratory Test Results............................................................................ 5
Groundwater Conditions.......................................................................................... 6
ENGINEERING ANALYSES AND RECOMMENDATIONS.................................................6
Geotechnical Considerations...................................................................................6
FoundationSystems........................................................:....................................... 7
Basement Construction........................................................................................... 8
Lateral Earth Pressures...........................:...............................................................9
Seismic Considerations...........................................................................................9
Floor Slab Design and Construction........................................................................10
Pavement Design and Construction — for On -Site Parking Areas ...........................10
Earthwork................................................................................................................13
General Considerations...............................................................................13
SitePreparation...........................................................................................13
SubgradePreparation..................................................................................14
Fill Materials and Placement........................................................................14
Excavation and Trench Construction...........................................................15
Additional Design and Construction Considerations................................................16
Exterior Slab Design and Construction........................................................16
Underground Utility Systems........................................................................16
Corrosion Protection....................................................................................16
SurfaceDrainage.........................................................................................16
GENERALCOMMENTS.....................................................................................................17
Geotechnical Engineering Report Terracon
Pinnacle P.U.D. — Townhomes
Project No. 20015202
to 5-1/2-feet below site grades. In an effort to lower groundwater levels throughout the site to
allow for lower level construction, it is recommended an area underdrain system be installed. The
area underdrain system should be placed in the sewer line utility trench and day light/gravity flow
to the south toward Spring Creek. The individual units' interior perimeter drainage systems should
be connected to the roadway underdrain system.
' Based on the type of construction proposed, and the anticipated maximum wall and column loads,
it is recommended the proposed townhome structures be supported by conventional -type spread
footings bearing on undisturbed subsoils and/or on engineered controlled fill. The footings should
be placed a minimum of 3-feet above the maximum anticipated rise in groundwater and interior
perimeter drains are installed and connected to the subsurface underdrain system. Based on our
review of the proposed civil engineering drawings prepared by Shear Engineering Corporation,
the proposed top of wall (T.O.W.) elevations vary from 4961 at the northwest comer and drop to
approximately 4956 at the southeast corner. Assuming the basement footings will be placed
approximately 8 to 9-feet below T.O.W. elevations, and correlating with the groundwater
piezometric surface flow diagram, Figure 3, the footings will be 1-1/2 to 2-1/2 feet above existing
_ water levels. Thus, with this close proximity, we recommend an area/subsurface drainage system
be installed.
Basement construction is considered feasible throughout the site provided lower level slabs are
placed a minimum of 4-feet above the maximum anticipated rise in groundwater and interior
perimeters drains are installed as previously stated. Slab -on -grade construction is feasible
provided the recommendations set forth in this report are followed. Further details are provided in
this report.
We appreciate the opportunity to be of service to you on this phase of your project. If you have
any questions concerning this report, or if we may be of further service to you, please do not
hesitate to contact us.
Sincerely,
C i GIST
•
TER CON
G�C.`:.'',K..R�cs
• /12
David A. Riche
P
Geotechnical E
anager
SS10 N lk .
Reviewed by:
obe, P.E.
Office Manger
Copies to:
Addressee (4)
Shear Engineering, Corp. (1): Mr. Brian Shear
October 10, 2001
Pinnacle Fort Collins, LLC
C/o Anchor Development
1083 Wild Cherry Lane
Fort Collins,. Colorado 80521
Attn: Mr. Russ Wells
Irerracon
301 N. Howes • P.O. Box 503
Fort Collins, Colorado 80521-0503
(970) 484-0359 Fax: (970) 484-0454
Re: Geotechnical Engineering Report
Proposed Pinnacle Townhomes
South of Prospect Road, North of Spring Creek, and West of Lemay Avenue
Fort Collins, Colorado
Terracon Project No. 20015202
Terracon has completed a geotechnical engineering exploration for the proposed Pinnacle
Townhome development project to be located south of Prospect Road, north of Spring Creek, and
west of Lemay Avenue in Fort Collins, Colorado. This study was performed in general accordance
with our Proposal No. D2001303 dated September 5, 2001 as well as the City of Fort
Collins/Larimer County Urban Area Street Standards design criteria, dated January of 2001.
Empire Laboratories, Inc., Terracon's predecessor, performed a geotechnical engineering
explorations for the site in on July 1, and 2, 1985. For further information and findings thereof,
please refer to our "Report of a Geotechnical Investigation" dated July 8, 1985, Project No. 6069-
85.
The primary purpose of this study is to update the original geotechnical engineering report to and
drill and install 5 groundwater piezometers in an effort to provide future monitoring of groundwater.
This study is to supplement previous work provided at the site and will assist the project design
engineer for an underdrain/subsurface drainage system, which may be required if basement
construction is planned.
The results of our engineering study, including the boring location diagram, laboratory test results,
test boring records from the 5-additional test borings/piezometers, and the geotechnical
engineering recommendations needed to aid in the design and construction of foundations,
basement construction, subsurface drainage systems, pavements and other earth connected
phases of this project are attached.
The subsoils at the site consisted of sandy lean clay, silty clayey sand and silty sand with gravel
extending to the bedrock below. Siltstone/sandstone bedrock was encountered in each of the 5
additional test borings at approximate depths of 10 to 13-feet below existing site grades and
extended to the depths explored. Groundwater was encountered in each of the recently installed
piezometers at approximate depths of 5 to 7-1/2-feet below existing site grades. In the previously
drilled test borings in July of 1985, groundwater was encountered at approximate depths of 1-1/2
Arizona ■ Arkansas ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ lowaA Kansas ■ Kentucky ■ Minnesota ■ Missouri
Montana ■ Nebraska \ Nevada ■ New Mexico ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming
Quality Engineering Since 1965
r
rrJr'
GEOTECHNICAL ENGINEERING REPORT
PROPOSED PINNACLE TOWNHOMES
' SOUTH OF PROSPECT ROAD, NORTH OF SPRING CREEK,
AND WEST OF LEMAY AVENUE
FORT COLLINS, COLORADO
TERRACON PROJECT NO. 20015202.
OCTOBER 10, 2001
Prepared for.
PINNACLE FORT COLLINS, LLC
C/O ANHOR DEVELOPMENT
1083 WILD CHERRY LANE
FORT COLLINS, COLORADO 80521
ATTN: MR. RUSS WELLS
Prepared by:
ITerracon
301 North Howes Street
iFort Collins, Colorado 80521
� � lrerracon.J