Loading...
HomeMy WebLinkAboutPINNACLE TOWNHOMES - FDP - 34-00B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTProject No: 1555-02-00 June, 2002 Re: Final Drainage and Erosion Control Report Pinnacle Townhomes; Ft. Collins, Colorado X. CONCLUSIONS 12 A. Compliance With Standards 12 B. Drainage Concept 13 XI. REFERENCES 13 APPENDIX I Drainage Calculations APPENDIX II Erosion Control Cost Estimate APPENDIX III Floodplain Documents APPENDIX IV Charts and Figures APPENDIX V Stuffer Envelope Project No: 1555-02-00 June, 2002 Re: Final Drainage and Erosion Control Report Pinnacle Townhomes; Ft. Collins, Colorado TABLE OF CONTENTS I. INTRODUCTION I H. GENERAL LOCATION AND DESCRIPTION I A. Project Location I B. Description of The Project I III. DRAINAGE BASINS AND SUB -BASINS 2 A. Major Basin Description 2 B. Sub -Basin Description 3 C. Historic Conditions 3 D. Developed Conditions 3 IV. DRAINAGE DESIGN CRITERIA 4 A. Regulations 4 B. Development Criteria Reference and Constraints 4 C. Hydrologic Criteria 5 D. Hydraulic Criteria 5 V. DRAINAGE FACILITY DESIGN 6 A. General Concept 6 B. Specific Details — Detention 6 C. Specific Details — Street Capacities 6 D. Specific Details — Swale Capacities 7 E. Specific Details — Inlet and Storm Sewer 7 VI. FLOODPLAIN DESIGN AND PROTECTION 8 A. General Concept 8 B. Specific Details 8 VII. WATER QUALITY 10 A. General Concept 10 B. Specific Details 10 VIII. EROSION CONTROL 11 A. General Concept 11 IX. VARIANCE FROM CITY STANDARDS 12 A. Variance From City of Fort Collins Requirements 12 zfil SHEAR ENGINEERING CORPORATION Final Drainage and Erosion Control Report For PINNACLE TOWNHOMES P.D.P. (Project Development Plan) Fort Collins, Colorado Prepared for: Pinnacle FTC, LLC 1083 Wild Cherry Lane Ft. Collins, Colorado 80521 ,y Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1555-02-00 Date: June, 2002 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com