Loading...
HomeMy WebLinkAboutSCARPELLA SUBDIVISION, REPLAT OF LOT 3 - PDP/FDP - 27-00 - CORRESPONDENCE - ROUTING SHEETREVISION COMMENT SHEET DATE: October 24, 2000 TO: Water/Wastewater PROJECT: #27-00 Scarpella Subdivision, Replat of Lot 3, Type I LUC All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: Wednesday, November 1, 2000 10 No Comment Problems or Concerns (see below or attached) "PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE" Date: — Signatu CHECK _ Plat _ site _ Drainage Report _ Utility _ Redline Utility _ Landscape REVISION COMMENT SHEET DATE: October 24, 2000 DEPT: Stormwater PROJECT: #27-00 Scarpella Subdivision, Replat of Lot 3, Type I LUC All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: Wednesday, November 1, 2000 The Stormwater Department is ready for mylars at this time. After addressing the following comment, please provide two additional signed and stamped reports with the mylars. 1. Please include the benchmark elevation (5097.16 feet) in general note #16. RESPONSE: Scarpel la-2.doc Date: �b f l(% Signature: 5� ✓l CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS o I , Plat _Site Drainage Report Other -� Fi �"�/ t _ Utility — Redline Utility _ Landscape �r r[.�`XSn/ J �5�, City of Fort Collins REVISION COMMENT SHEET DATE: October 24, 2000 TO: Engineering PROJECT: #27-00 Scarpella Subdivision, Replat of Lot 3, Type I LUC All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: Wednesday, November 1, 2000 ❑ No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** uj� X,4r+ to Date: Zj `' -Icz) Signature: CHECK Bm IF You W611 10 HCEIVE COPIES Of REVISIOR _ Plat _ Site _ Drainage Report _ other Utl7ity _ Redline Ufdity _ Landscape Citv of Fort Collins