HomeMy WebLinkAboutSCARPELLA SUBDIVISION, REPLAT OF LOT 3 - PDP/FDP - 27-00 - CORRESPONDENCE - ROUTING SHEETREVISION
COMMENT SHEET
DATE: October 24, 2000 TO: Water/Wastewater
PROJECT: #27-00 Scarpella Subdivision, Replat of Lot 3,
Type I LUC
All comments must be received by Ted Shepard in Current
Planning no later than the staff review meeting:
Wednesday, November 1, 2000
10 No Comment
Problems or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE"
Date: — Signatu
CHECK
_ Plat _ site _ Drainage Report
_ Utility _ Redline Utility _ Landscape
REVISION
COMMENT SHEET
DATE: October 24, 2000 DEPT: Stormwater
PROJECT: #27-00 Scarpella Subdivision, Replat of Lot 3,
Type I LUC
All comments must be received by Ted Shepard in Current Planning
no later than the staff review meeting:
Wednesday, November 1, 2000
The Stormwater Department is ready for mylars at this time. After addressing the following
comment, please provide two additional signed and stamped reports with the mylars.
1. Please include the benchmark elevation (5097.16 feet) in general note #16.
RESPONSE:
Scarpel la-2.doc
Date: �b f l(% Signature: 5� ✓l
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS o I ,
Plat _Site Drainage Report Other -�
Fi �"�/ t
_ Utility — Redline Utility _ Landscape �r
r[.�`XSn/ J �5�, City of Fort Collins
REVISION
COMMENT SHEET
DATE: October 24, 2000 TO: Engineering
PROJECT: #27-00 Scarpella Subdivision, Replat of Lot 3,
Type I LUC
All comments must be received by Ted Shepard in Current
Planning no later than the staff review meeting:
Wednesday, November 1, 2000
❑ No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE**
uj� X,4r+
to
Date: Zj `' -Icz) Signature:
CHECK Bm IF You W611 10 HCEIVE COPIES Of REVISIOR
_ Plat _ Site _ Drainage Report _ other
Utl7ity _ Redline Ufdity _ Landscape
Citv of Fort Collins