Loading...
HomeMy WebLinkAboutARBOR SOUTH PROPERTIES - ANNEXATION & ZONING - 38-00 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWATTACHMENTI Conceptual Review Letters and explanation of how issues have been addressed Conceptual Review Letter — September 11, 2000 Explanation of how issues have been addressed: Zoning Department: • Type II ODP Light and Power Department: • Power is available, conduit in College Ave. Natural Resources: • Trees on the west side of site are identified on the City Natural Areas Inventory Map as an Urban Plain Forest. A 50' minimum setback will be provided and shown on the Final ODP. • Trash area will be contained to include a recycle area. Poudre Valley Fire: • Need 1,500 GPM @ 20 PSI reg. for commercial. • Fire hydrant spacing shall be 300'. Engineering: • TIS has been submitted with this ODP. • Noted, a State Access Permit will be required. • Noted, project may need to construct acceleration and deceleration lanes. • Noted, project may prompt the construction of a median (city. to cost share). • Street over -sizing impact fees will be required and paid. • Noted, coordinate with Susan Dirken regarding the Mason Street Corridor Plan. • Fossil Boulevard will be extended from the south through the site, terminating at Spradley Barr. The exact location will be determined during the review process. Stormwater: • Stormwater fees shall be $2,274/acre. • On -site detention will be required with a 10-year release rate. • Noted, that drainage through Mill Brother's may be difficult. E:\\PF\jim\j2046\doc\odp\20460DP Just.doc 17