Loading...
HomeMy WebLinkAboutMORNINGSIDE (VILLAS) SUBDIVISION PLAT REVIEW - 23-00 - CORRESPONDENCE - (3)r 3. Please consider placing swale A -A away from the surrounding building to prevent problems, especially since there is a nearby window well. RESPONSE: 4. To provide adequate clearance over the existing 24-inch sanitary sewer line, please provide ductile iron pipe (DIP) instead of RCP for the storm sewer. RESPONSE: Please refer to the redlined plans and report for additional review comments. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: August 3, 2000 TO: Stormwater Util PROJECT: #23-00 Momingside Villas Subdivision Plat Review All comments must be received by Ted Shepard no later than the staff review meeting: August 16, 2000 Note- Please identify, your redlines for future reference Please Note: This project has previously been reviewed as a Building Permit Review. 1. Please be aware that final approval of this project is contigent upon signed easements. Please have the 20-foot drainage easement signed. RESPONSE: 2. Please provide freeboard for swale A -A by analyzing the capacity for 1.33*QI00. Please make any necessary changes to the cross-section on the plan. RESPONSE: (over) Signature x �� CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS " Axi _Plat _Site _Drainage Report _Other -Pe f WP _Utility _Redline Utility _Landscape qWbA City of Fort Collins Current PROJECT COMMENT S Building Permit Review AUG 7 2000 DATE: August 1, 2000 DEPT: PFA PROJECT: Morningside Villas Subdivision and RM Site Plan review, (formally Great Dane Sub) Note: Building Permit Review (old use -by -right) the site, landscape and elevations are to be reviewed under the old RM Zoning Code. PLANNER: Peter Barnes, Zoning ENGINEER: Sheri Wamhoff All comments must be received by: August 16, 2000 ADDRESS NUMERALS: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6 inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 97 UFC 901.4.4 WATER SUPPLY: Fire hydrants are required with a maximum spacing of 800 feet along an approved roadway. Each hydrant must be capable of delivering 1000 gallons of water per minute at a residual pressure of 20 psi. UFC 901.2.2.2 REQUIRED ACCESS: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 97 UFC 901.2.2.1, 901.3; 901.4.2; 902.2.1: FCLUC NOTE: If a fire lane can not be provided the buildings shall be fire sprinklered. SPRINKLER REQUIREMENTS: These proposed buildings shall be fire sprinklered. 97 UFC 1003.2.9 NOTE: A Fire Lane is unattainable as proposed, thus rendering the buildings out of access. These buildings will be required to be fire sprinklered. Date: 8 - g — z C`o v Signature Check ere if you wish to receive copies of revisions Plat _ Site _ Drainage Report _ Other: Utility _ Landscape _ Redline Utility PROJECT COMMENT SHEET City of Fort Collins Building Permit Review Current PlanninE DATE: August 1, 2000 DEPT: AT&T PROJECT: Morningside Villas Subdivision and RM Site Plan review, (formally Great Dane Sub) Note: Building Permit Review (old use -by -right) the site, landscape and elevations are to be reviewed under the old RM Zoning Code. PLANNER: Peter Barnes, Zoning ENGINEER: Sheri Wamhoff All comments must be received by: August 16, 2000 AT&T Cable Services will not plan to service this project until a Broadband Utility Easement, also called a Service Agreement, is completed with our Commercial Accounts Executive Reneta Santro. She maybe reached at (970)-419-3106 Monday through Friday 8a.m.-5 p.m.. Dater Signature: Chec ere 1 y u wishto receive copies of revision ' '/Plat _ Site _ Drainage Report _ Other: _ Utility � Landscape — Redline Utility City of Fort Collins Current PROJECT COMMENT SHEET Building Permit Review DATE: August 1, 2000 DEPT: Post Office PROJECT: Morningside Villas Subdivision and RM Site Plan review, (formally Great Dane Sub) Note: Building Permit Review (old use -by -right) the site, landscape and elevations are to be reviewed under the old RM Zoning Code. PLANNER: Peter Barnes, Zoning ENGINEER: Sheri Wamhoff All comments must be received by: August 16, 2000 RECEIVED AUG 10 2000 CURRENT PLANNING Date: F 'F .0n Signature:/'eYz'/ 1/'_ Pec=t you wisn to receive copies of revisions Plat _ Site _ Drainage Report _ Other: Utility _ Landscape _ Redline Utility PROJECT COMMENT SHEET City of Fort Collins Building Permit Review Current Planning DATE: August 1, 2000 DEPT: Engineering PROJECT: Morningside Villas Subdivision and RM Site Plan review, (formally Great Dane Sub) Note: Building Permit Review (old use -by -right) the site, landscape and elevations are to be reviewed under the old RM Zoning Code. PLANNER: Peter Barnes, Zoning ENGINEER: Sheri Wamhoff All comments must be received by: August 16, 2000 Morningside Villas Subdivision August 15, 2000 Plat Where is the off -site drainage easement in the process? Who is working on this, stormwater? Parks? Utility plans For the ramp on the east side of the driveway you are indicating that need to use vertical curb. That is great, I think the no should read: "vertical curb & gutter taper curb from 1/2"to 5"" instead of "6" vertical curb & gutter taper curb from 6" to 5"". Since the curb height will be 1/2" at the driveway and 5" high at the beginning of the ramp. This is shown on several sheets, so the change needs to be made on all of them. Would also recommend a note: "vertical curb and gutter taper curb from 6" to 5"" for the piece between the curb chase and the existing curb. Date: �� Signature•7S 1 /�; Check ere if you wish to receive copies of revisions tj Plat _ Site _ Drainage Report _ Other: Utility _ Landscape — Redline Utility PROJECT City of Fort Collins COMMENT SHEET Current Planning BUILDING PERMIT REVIEW DATE: August 1, 2000 DEPT: Water & Wastewater PROJECT: Morningside Villas Subdivision and RM Site Plan Review, (formally Great Dane) Note: Building Permit Review (old -use -by -right) The site, landscape and elevation are to be reviewed under the old RM Zoning Code PLANNER: Peter Barnes, Zoning ENGINEER: Sheri Wamhoff All comments must be received by: August 16, 2000 ➢ No bends are allowed on fire line laterals. ➢ In order to provide maximum separation between storm sewer and sanitary sewer use 16" D.I.P. in place of RCP. ➢ Correct all plan sheets to reflect the change in storm sewer pipe size/material. ➢ Original plans show and indicate the abandonment of the existing sanitary sewer services, which extend from the end of Morningside Drive. All existing services must be used or abandoned. ➢ See site, landscape and utility plans for other comments. Date: IL 7- OU Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVI IONS X PLAT X SITE _DRAINAGE REPORT —OTHER\ X UTILITY X REDLINE UTILITY X LANDSCAPE 9^61� Z�� City of Fort Collins City of Fort Collins Current PlanninP PROJECT COMMENT SHEET Building Permit Review DATE: August 1, 2000 DEPT: Parks PROJECT: Morningside Villas Subdivision and RM Site Plan review, (formally Great Dane Sub) Note: Building Permit Review (old use -by -right) the site, landscape and elevations are to be reviewed under the old RM Zoning Code. PLANNER: Peter Barnes, Zoning ENGINEER: Sheri Wamhoff All comments must be received by: August 16, 2000 0 C- /,k.,,lf��� ,/,/ w; l/ tip- � � �V Air r Aa-'A �'-7 Date: %S - 2sx" Signature: do,", 40�- Checic�i youwito o receive copies of revisions Plat _ Site _ Drainage Report _ Other: Utility _ Landscape _ Redline Utility If you should have any questions regarding these comments or if you need to meet to go over them please feel free to contact the department representative that made the comment or myself. Sincerely, Sheri Wamhoff Civil Engineer II Attachments cc: Peter Barnes Ted Shepard Georgiana Deines Dick Rutherford, Stewart and Associates, Inc. file Transportation Services Engineering Department City of Fort Collins August 24, 2000 Brett Larimer 1600 W Horsetooth Road Fort Collins, Co 80526 Dear Mr Larimer, For your information, attached are copies of the staffs "Building Permit Review/Utility Plan Review" comments concerning the Morningside Villas Subdivision and RM Site Plan Review. The plans submitted were reviewed by numerous City departments and other agencies. The comments are offered by Staff to assist you in preparing final plans for building permit issuance and Utility plan approval. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by November 24, 2000. A 30-day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. Mylars for signature can be submitted provided the following are done or have occurred prior to submittal: 1) The plat has had an administrative hearing and received approval. 2) The off -site easement for the storm drain line on the City property has been granted, and 3) All of the comments being returned have been addressed and the utility plans, site and landscape plans have been updated. Once this has occurred please submit a mylar of the site plan, landscape plan, elevations and the utility plans, return all redlined plans and provide 2 blueline site plans, 2 blueline landscape plans, 1 blueline set of utility plans, and 3 drainage reports for review and approval. The site, landscape and elevation mylars will be kept by the City for filling, the utility plans upon approval will be returned for to the developer, who at such time shall make a mylar copy and 5 blueline sets (stamped and signed by the Engineer) of the signed utility plans and submit them to the City. Please note, if all the comments have not been adequately addressed the mylars will be returned until the plans are updated and/ or the issue(s) resolved. In addition fill out and return "Information for Development Agreements" sheet. Upon receipt of this I will start drafting the development agreement for this project. Ted Shepard with the Current Planning Department is in the process of scheduling the type 1 hearing for the plat associated with this project. Please contact him if you have any questions regarding this. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 wwwdfort-collins.co.us