HomeMy WebLinkAboutPEAK VIEW - MAJOR AMENDMENT & REPLAT - 26-00C - CORRESPONDENCE - REVISIONS (3)Number 30
Sheet 8 — Need to bubble and show changes to the building envelopes that have changed
and show how this impacts the services to these buildings. With the building envelope
changes, some of the meter pits may no longer be within easement area and adequate
distance from the buildings.
Per conversations with Jeff Hill and a meeting between the owner's representative and
Roger Buffington, we have changed the water service, curb stop, and meter pit locations
for two buildings. The relocated meter pits have been located 4 feet from the building
envelope and a 10 foot separation has been maintained from sanitary sewer services.
The original Sheet 8 has been bubbled and a new Sheet 8A has been added identifying
these changes.
Department: Water Wastewater
Contact: Jeff Hill
Topic: General
Number 26
Show water and sewer lines on revised utility plans and site plans. Maintain 4 feet
minimum separation between meter pit and building envelopes. Maintain 10 feet of
separation between water/sewer services and trees. See site, landscape and utility plans
for other comments.
See response to Number 30, above.
Pickett Engineering, Inc. Page 2 of 2
June 22, 2004
1
RESPONSES TO
CITY OF FORT COLLINS
STAFF PROJECT REVIEW COMMENTS
DATED 6/2,/04
PEAK VIEW MAJOR AMENDMENT AND REPLAT—TYPE I (LUC)
Department: Engineering
Contact: Sheri Wamhoff
Topic: Plat
Number 29
N/A
Topic: Utility Plans
Number 7
Signature block not yet provided on this sheet.
The utility signature block has been added to this sheet
Number 27
There seem to be two sheets 6A in for review. I have a Mylar sheet that was just
submitted that is different than the blueline sheet in this set for review. Which sheet is
the one you wish to be reviewed and approved? If these are to become two sheets they
need to be numbered 6A and 6B and duplicate information should be removed (ie
details). Nothing should be bubbled on either one of these sheets nor noted in the
revision block area, as both are new sheets. Remove note regarding wall design to be
provided prior to construction of wall. The wall designs need to be provided as part of
the utility plan set and approved with these plans.
We have changed the sheet number for the modification to the detention pond to sheet
6A; sheet 6B is now the revisions to the grading around the new building envelopes. The
bubbled areas have been.removed on all sheets and the text has been removed from the
revision block area. The note requiring that the retaining wall design be approved prior
to the construction of the walls has been changed to read that the approval of the wall
design shall be done in conjunction with the approval of the Mylar for detention pond
modifications.
Number 28
Need to provide the retaining wall design(s). They need to be a part of the utility plan
set. Please provide the design(s) and provide signed and sealed structural calculations
for their design.
The owner will, or possibly has already, submitted the design and sealed structural
calculations for the retaining wall design to your office.
Pickett Engineering, Inc.
June 22, 2004