HomeMy WebLinkAboutPEAK VIEW - MAJOR AMENDMENT & REPLAT - 26-00C - CORRESPONDENCE - (3)Number: 30 Created: 5/26/2004
[5/26/04] Sheet 8 - Need to bubble and show changes to the building evelopes that
have changed and show how this impacts the services to these buildings. With the
building envelope changes, some of the meter pits may no longer be within
easement area and adequate distance from the buildings.
Number: 31
[5/26/04
Created: 5/26/2004
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 26 Created: 5/24/2004
[5/24/04] Show water and sewer lines on revised utility plans and site plans.
Maintain 4 feet minimum separation between meter pit and building envelopes.
Maintain 10 feet of separation between water/sewer services and trees.
See site, landscape and utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Yours Truly,
Ted Shepard
City Planner
Page 2
STAFF PROJECT REVIEW
Citvof Fort Collins
s-
DESIGN DEVELOPMENT CONSULTANTS Date: 06/02/2004
DON LEFFLER
2627 REDWING RD. #350
FT. COLLINS, CO 80526
Staff has reviewed your submittal for PEAK VIEW MAJOR AMENDMENT AND
REPLAT - TYPE I (LUC), and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Plat
Number: 29 Created: 5/25/2004
[5/25/041 Use standard dedication language on the plat. Can not use the statement
that you have that states that you do hereby vacate the platting of the above
property. Only City Council can vacate a plat and this is not going to City Council.
Use the standard dedication language. Note #2 provided covers the vacation of
previously dedicated easements. Add the following to the end of that note to make it
clear that the easements shown on this replat are to be dedicated with this plat. 'and
rededicates them as shown hereon.'
Topic: Utility Plans
Number: 7 Created: 3/30/2004
[5/25/04] signature block not yet provided on this sheet.
[3/30/04] Sheet 6A - Provide City Signature block on this sheet in the lower right
hand corner. This is where we will sign this sheet.
Number: 27 Created: 5/25/2004
[5125/04] There seems to be two sheet 6A in for review. I have a mylar sheet that
was just submitted that is different that the blueline sheet in this set for review.
Which sheet it the one you wish to be reviewed and approved? If these are to
become two sheets they need to be numbered 6A and 6B and duplicate information
should be removed (ie details). Nothing should be bubbled on either one of these
sheets nor noted in the revision block area as both are new sheets. Remove note
regarding wall design to be provided prior to construction of wall. The wall designs
need to be provided as a part of the utility plan set and approved with these plans.
Number: 28 Created: 5/25/2004
[5/25/04] Need to provide the retaining wall design(s). They need to be a part of the
utility plan set. Please provide the design(s) and provide signed and sealed
structural calculations for their design.
Page 1