HomeMy WebLinkAboutU-4 ODP & MODIFICATION OF STANDARDS - 37-00 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYm m m = =i
Traffic Counts
9/27/00 and 9/282000
6:45-7:00 (4:45-5:00)
7:00-7:15 (5:00.5:15)
7:15-7:30 (5:15-5:30)
7:30-7:45 (5:30-5:45)
7:45-8:00 (5:45-6:00)
8:00-8:15 (6:00-6:15)
6:45-7:45 (4:45-5:45)
7:00-8:00 (5:00-6:00)
7:15-8:15 (5:15415)
6:45-7:45 (4:45-5:45)
7:00-8:00 (5:00-6:00)
7:15-8:15 (5:15-6:15)
AM Peak (7:15-8:15)
PM Peak (5:00-6:00)
2000 Peak Hour Traffic
SBIKE
SBR
SBT
SBI-
WBIKE
WBR
WBT
Will,
NRIKE
NBR
NBT
Not,
EBIKE
EBR
EBT
P-Bl,
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
I'M
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
0
0
17
27
53
61
13
4
2
1
5
13
7
35
7
9
0
1
8
1
25
58
9
20
2
1
15
22
47
17
21
43
0
0
23
36
49
79
6
1
0
1
1
7
19
36
2
II
0
0
5
12
19
64
7
14
0
0
12
22
39
19
17
19
0
1
54
34
90
56
7
4
2
2
0
6
25
55
6
5
1
2
6
II
33
67
20
24
0
0
16
16
38
22
27
36
4
0
38
39
79
58
9
3
4
3
1
10
32
23
7
9
1
1
4
9
36
60
27
22
3
0
54
18
54
19
33
27
0
1
19
60
79
42
9
6
0
0
9
5
15
42
7
3
1
2
4
8
48
. 64
10
24
4
1
37
15
47
16
43
38
0
2
22
35
43
43
5
3
0
0
7
15
17
33
6
3
0
0
11
10
32
44
12
23
2
1
12
12
43
10
17
27
4
1
132
136
271
254
35
12
8
7
7
36
83
149
22
34
2
4
23
33
113
249
63
80
5
1
97
78
178
77
98
125
4
2
134
169
297
235
31
14
6
6
11
28
91
156
22
28
3
5
19
40
136
255
64
84
7
1
119
71
178
76
120
120
4
4
133
168
291
199
30
16
6
5
17
36
89
153
26
20
3
5
25
38
149
235
69
93
9
2
119
61
182
67
120
128
8M
rM
1122
1263
1222
1276
1250
1214
4
133
291
30
6
17
89
26
3
25
149
69
9
119
182
120
2
169
235
14
6
28
156
28
5
40
255
84
1
71
76
120
4
2
133
169
291
235
30
14
6
6
17
28
89
156
26
28
3
5
25
40
149
255
69
84
9
1
119
71
182
76
120
120
9129W (U4.x1s\COunW
L9AA..QKMS, INC.
U-¢ LLC Overall Development Plan
Traffic Counts and Projections
SBR
SBT
SBL
WBR
WBT
WBL
NBR
NBT
NBL
EBR
EBT
EBL
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
Shields and Vine 2000
133
169
291
235
30
14
17
28
89
156
26
28
25
40
149
255
69
84
119
71
182
76
120
120
Shields and Vine 2005(3%)
154
196
337
272
35
16
20
32
103
181
30
32
29
46
173
296
80
97
138
82
211
88
139
139
Project TraMc
5
6
7
12
0
1
0
1
3
14
3
7
Total Traffic (3%)
159
202
344
284
35
17
20
33
103
181
30
32
29
46
176
310
80
97
138
82
211
88
142
146
9/29/00 (U4.als%Pnjectioaa)
rdj, computed
0.2
-0.6
0.1
-0.6
0.1
-0.6
0.0
-0.6
Worksheet
4 - Departure
Headway
and Service Time
'
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
ow rate
259
91
236
33
451
51
333
224
initial value
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
initial
0.23
0.08
0.21
0.03
0.40
0.05
0.30
0.20
hd, final value
8.52
7.80
8.60
7.93
7.91
7.26
7.96
7.35
tfinal value
0.61
0.20
0.56
0.07
0.99
0.10
0.74
0.46
ve-up time, m
2.3
2.3
2.3
2.3
Service Time
6.2
5.5
6.3
5.6
5.6
5.0
5.7
5.1
Worksheet
5 - Capacity and Level
of Service
Eastbound
L1 L2
F ow Rate
259
91
rvice Time
6.2
5.5
ilization, x
0.61
0.20
Dep. headway, hd
8.52
7.80
tpacity
415
341
lay
'23.83
12.40
LOS
C
B
proach:
Delay
20.86
LOS
C
;jitersection Delay 34.33
11
Ll
1
1
I
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
236
33
451
51
333
224
6.3
5.6
5.6
5.0
5.7
5.1
0.56
0.07
0.99
0.10
0.74
0.46
8.60
7.93
7.91
7.26
7.96
7.35
409
283
455
301
448
474
21.83
11.25
68.03
10.79
29.84
16.11
C
B
F
B
D
C
20.53
62.22
24.32
C
F
C
Intersection
LOS D
' HCS: Unsignalized Intersections Release 3.2
tone: Fax:
E-Mail:
' ALL -WAY STOP CONTROL(AWSC) ANALYSI
ttersection: Shields and Vine
ty/State: Fort Collins, CO
Analyst: Jeremy Klop
oject No.: 2005 PM with Project
me period Analyzed: 5:00-6:00 pm
ate: 09/28/2000
st/West Street: Vine
rth/South Street: Shields
Worksheet 2 - Volume Adjustments and Site Characteristics
Eastbound I Northbound LboundSouthbound
LR LR L R
Uume 1146 88
% Thrus Left Lane
82 132 181 33
Eastbound Westbound
L1 L2 L1 L2
97 310 46
Northbound
L1 L2
17 284 202
Southbound
L1 L2
Infiguration
LT
R
LT
R
LT
R LT
R
PHF
0.90
0.90
0.90
1.00 0.90
0.90 0.90
0.90
ow Rate
259
91
236
33
451
51 333
224
Heavy Veh
2
2
2
0
2
2 2
2
No. Lanes
2
2
2
2
posing-Lanes
2
2
2
2
nflicting-lanes
le
2
2
2
2
ometry group
5
5
5
5
ration, T 0.25
hrs.
Worksheet 3 -
Saturation
Headway
Adjustment
Worksheet
Eastbound
L1 L2
ow Rates:
Total in Lane 259 91
Left -Turn 162 0
Right -Turn 0 91
lop. Left -Turns 0.6 0.0
op. Right -Turns 0.0 1.0
op. Heavy Vehicle0.0 0.0
ometry Group 5
justments Table 10-40:
hLT-adj 0.2
hRT-adj -0.6
hHV-adj 1.7
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
236
33
451
51
333
224
35
0
107
0
18
0
0
33
0
51
0
224
0.1
0.0
0.2
0.0
0.1
0.0
0.0
1.0
0.0
1.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
5
5
5
0.2
0.2
0.2
-0.6
-0.6
-0.6
1.7
1.7
1.7
�adj, computed
0.1
-0.6
0.1
-0.6
0.1
-0.6
Worksheet
4 - Departure
Headway
and Service T
'
Eastbound
Westbound
Northbound
L1
L2
L1
L2
L1
L2
low rate
391
153
147
20
283
32
initial value
3.20
3.20
3.20
3.20
3.20
3.20
initial
0.35
0.14
0.13
0.02
0.25
0.03
hd, final value
7.75
7.07
8.50
7.82
8.04
7.37
Lfinal value
0.84
0.30
0.35
0.04
0.63
0.07
ve-up time, m
2.3
2.3
2.3
Service Time
5.4
4.8
6.2
5.5
5.7
5.1
Worksheet 5 - Capacity and Level of Servic
Eastbound
'
L1
L2
ow Rate
391
153
rvice Time
5.4
4.8
ilization, x
0.84
0.30
Dep. headway, hd
7.75
7.07
Lpacity
460
403
lay
39.62
12.77
LOS
E
B
tproach:
Delay
32.07
LOS
D
liptersection Delay 29.68
I
1
Westbound Northbound
L1 L2 L1 L2
0.1 -0.6
Southbound
L1
L2
420
176
3.20
3.20
0.37
0.16
7.57
6.96
0.88
0.34
2.3
5.3
4.7
Southbound
L1 L2
147
20
283
32
420
176
6.2
5.5
5.7
5.1
5.3
4.7
0.35
0.04
0.63
0.07
0.88
0.34
8.50
7.82
8.04
7.37
7.57
6.96
397
270
436
282
472
426
15.66
10.88
23.53
10.59
44.90
13.20
C
B
C
B
E
B
15.08
22.22
35.54
C
C
E
Intersection
LOS D
I
' HCS: Unsignalized Intersections Release 3.2
tone: Fax:
E-Mail:
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
tersection: Shields and Vine
ty/State: Fort Collins, CO
Analyst: Jeremy Klop
fa
oject No.: 2005 AM with Project
me period Analyzed: 7:15-8:15 am
te: 09/28/2000
tst/West Street: Vine
rth/South Street: Shields
Worksheet 2 - Volume Adjustments and Site Characteristics
' Eastbound Westbound Northbound Southbound
L T R I L T R L T R L T R
lume 142 211
Thrus Left Lane
Infiguration
PHF
ow Rate
Heavy Veh
No. Lanes
ieposing -Lanes
nflicting-lanes
ometry group
ration, T 0.25
138 130 103 20 1
Eastbound Westbound
L1 L2 L1 L2
80 176 29
Northbound
L1 L2
35 344 159
Southbound
L1 L2
LT
R
LT
R
LT
R
LT
R
0.90
0.90
0.90
1.00
0.90
0.90
0.90
0.90
391
153
147
20
283
32
420
176
2
2
2
0
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
5
5
5
5
hrs.
Worksheet 3
- Saturation Headway
Adjustment
Worksheet
'
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
ow Rates:
Total in Lane
391
153
147
20
283
32
420
176
Left -Turn
157
0
33
0
88
0
38
0
Right -Turn
0
153
0
20
0
32
0
176
lop. Left -Turns
0.4
0.0
0.2
0.0
0.3
0.0-
0.1
0.0
op. Right -Turns
0.0
1.0
0.0
1.0
0.0
1.0
0.0
1.0
op. Heavy Vehicle0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ometry Group
5
5
5
5
justments Table
10-40:
hLT-adj
0.2
0.2
0.2
0.2
-0.6
-0.6
-0.6
-0.6
'hRT-adj
hHV-adj
1.7
1.7
1.7
1.7
�dj, computed 0.2 -0.6 0.1 -0.6 0.1 -0.6 0.0 -0.6
Worksheet 4 - Departure Headway and Service Time
Eastbound Westbound Northbound Southbound
L1
L2
L1
L2
L1
L2
L1
L2
ow rate
251
91
236
32
435
51
319
217
initial value
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
initial
0.22
0.08
0.21
0.03
0.39
0.05
0.28
0.19
hd, final value
8.38
7.66
8.43
7.77
7.80
7.15
7.83
7.22
tfinal value
0.58
0.19
0.55
0.07
0.94
0.10
0.69
0.44
ve-up time, m
2.3
2.3
2.3
2.3
Service Time
6.1
5.4
6.1
5.5
5.5
4.8
5.5
4.9
Worksheet
5 - Capacity and Level
of Service
Eastbound
L1
L2
Westbound
L1 L2
Northbound
L1 L2
Southbound
Ll L2
ow Rate
251
91
236
32
435
51
319
217
rvice Time
6.1
5.4
6.1
5.5
5.5
4.8
5.5
4.9
ilization, x
0.58
0.19
0.55
0.07
0.94
0.10
0.69
0.44
Dep. headway, hd
8.38
7.66
8.43
7.77
7.80
7.15
7.83
7.22
pacity
417
341
413
282
460
301
451
467
lay
22.22
12.19
21.07
11.05
56.41
10.65
26.47
15.38
LOS
C
B
C
B
F
B
D
C
proach:
Delay
19.55
19.88
51.60
21.98
LOS
C
C
F
C
Tjiitersection Delay
29.95
Intersection
LOS D
n
II
n
II
I
II
' HCS: Unsignalized Intersections Release 3.2
tone: Fax:
E-Mail:
ALL -WAY STOP CONTROL(AWSC) ANALYSI
tersection:
Shields and Vine
ty/State:
Fort Collins, CO
Analyst:
Jeremy Klop
oject No.:
2005 PM without Project
me period Analyzed:
fa
5:00-6:00 pm
te:
09/28/2000
Street:
Vine
ist/West
rth/South Street:
Shields
Worksheet 2 - Volume Adjustments and Site Characteristics
EastboundI Westbound I Southbound
LR LR Ld L R
Ilume 1139 88
% Thrus Left Lane
82 132 181 32
Eastbound Westbound
L1 L2 L1 L2
97 296 46
Northbound
L1 L2
16 272 196
Southbound
L1 L2
Infiguration
LT
R
LT
R
LT
R
LT
R
PHF
0.90
0.90
0.90
1.00
0.90
0.90
0.90
0.90
Rate
251
91
236
32
435
51
319
217
Iow
Heavy Veh
2
2
2
0
2
2
2
2
No. Lanes
2
2
2
2
posing-Lanes
2
2
2
2
nflicting-lanes
Je
2
2
2
2
ometry group
5
5
5
5
ration, T 0.25
hrs.
Worksheet
3 -
Saturation
Headway Adjustment
Worksheet
'
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
ow Rates:
Total in Lane
251
91
236
32
435
51
319
217
Left -Turn
154
0
35
0
107
0
17
0
Right -Turn
0
91
0
32
0
51
0
217
Jop. Left -Turns
0.6
0.0
0.1
0.0
0.2
0.0
0.1
0.0
op. Right -Turns
0.0
1.0
0.0
1.0
0.0
1.0
0.0
1.0
op. Heavy Vehicle0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1P ometry Group
5
5
5
5
justments Table
10-40:
hLT-adj
0.2
0.2
0.2
0.2
hRT-adj
-0.6
-0.6
-0.6
-0.6
hHV-adj
1.7
1.7
1.7
1.7
�dj, computed
0.1
-0.6
0.1
-0.6
0.1
-0.6
Worksheet
4 - Departure
Headway
and Service T
'
Eastbound
Westbound
Northbound
L1
L2
L1
L2
L1
L2
ow rate
388
153
147
20
280
32
initial value
3.20
3.20
3.20
3.20
3.20
3.20
initial
0.34
0.14
0.13
0.02
0.25
0.03
hd, final value
7.70
7.02
8.44
7.76
7.99
7.33
tfinal value
0.83
0.30
0.34
0.04
0.62
0.07
ve-up time, m
2.3
2.3
2.3
Service Time
5.4
4.7
6.1
5.5
5.7
5.0
Worksheet 5 - Capacity and Level of Service.
Eastbound
'
L1
L2
ow Rate
388
153
rvice Time
5.4
4.7
ilization, x
0.83
0.30
Dep. headway, hd
7.70
7.02
pacity
462
403
lay
38.00
12.68
LOS
E
B
proach:
Delay
30.84
LOS
D
J&tersection Delay 28.28
11
1
1
0.1 -0.6
Southbound
L1
L2
412
171
3.20
3.20
0.37
0.15
7.54
6.92
0.86
0.33
2.3
5.2
4.6
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
147
20
280
32
412
171
6.1
5.5
5.7
5.0
5.2
4.6
0.34
0.04
0.62
0.07
0.86
0.33
8.44
7.76
7.99
7.33
7.54
6.92
397
270
438
282
474
421
15.51
10.81
22.92
10.54
41.69
12.98
C
B
C
B
E
B
14.95
21.65
33.26
B
C
D
Intersection
LOS D
1
' HCS: Unsignalized Intersections Release 3.2
tone: Fax:
E-Mail:
ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Shields and Vine
-tersection:
ty/State:
Fort Collins, CO
Analyst:
Jeremy Klop
oject No.:
2005 AM without Project
me period Analyzed:
Fa
7:15-8:15 am
te:
09/28/2000
Street:
Vine
fst/West
rth/South Street:
Shields
Worksheet 2 - Volume Adjustments and Site Characteristics
' IEastboundI WestboundI NorthboundI Southbound
LR LR Ld L
Uume 139 211
% Thrus Left Lane
r
138 130 103 20 180 173 29
Eastbound Westbound Northbound
L1 L2 L1 L2 L1 L2
Infiguration
LT
R
LT
R
LT
R
PHF
0.90
0.90
0.90
1.00 0.90
0.90
Rate
388
153
147
20
280
32
Iow
Heavy Veh
2
2
2
0
2
2
No. Lanes
2
2
2
posing-Lanes
2
2
2
nflicting-lanes
le
2
2
2
ometry group
5
5
5
ration, T 0.25
hrs.
Worksheet 3 -
Saturation
Headway
Adjustment
Works
Eastbound
L1 L2
ow Rates:
Total in Lane 388 153
Left -Turn 154 0
Right -Turn 0 153
top. Left -Turns 0.4 0.0
op. Right -Turns 0.0 1.0
op. Heavy Vehicle0.0 0.0
ometry Group 5
justments Table 10-40:
hLT-adj 0.2
hRT-adj -0.6
hHV-adj 1.7
Westbound Northbound
L1 L2 L1 L2
35 337 154
Southbound
L1 L2
LT
R
0.90
0.90
412
171
2
2
2
2
5
Southbound
L1 L2
147
20
280
32
412
171
33
0
88
0
38
0
0
20
0
32
0
171
0.2
0.0
0.3
0.0
0.1
0.0
0.0
1.0
0.0
1.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
5
5
5
0.2
0.2
0.2
-0.6
-0.6
-0.6
1.7
1.7
1.7
�dj, computed
0.2
-0.6
0.1
-0.6
0.1
-0.6
0.0
-0.6
Worksheet
4 - Departure
Headway and Service Time
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
ow rate
217
78
204
28
376
44
276
187
initial value
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
initial
0.19
0.07
0.18
0.02
0.33
0.04
0.25
0.17
hd, final value
7.71
6.98
7.73
7.07
7.16
6.51
7.14
6.53
tfinal value
0.46
0.15
0.44
0.05
0.75
0.08
0.55
0.34
ve-up time, m
2.3
2.3
2.3
2.3
Service Time
5.4
4.7
5.4
4.8
4.9
4.2
4.8
4.2
Worksheet
5 - Capacity and Level
of Service
Eastbound
Westbound
Northbound
Southbound
'
L1
L2
L1
L2
L1
L2
L1
L2
ow Rate
217
78
204
28
376
44
276
187
Wrvice Time
5.4
4.7
5.4
4.8
4.9
4.2
4.8
4.2
ilization, x
0.46
0.15
0.44
0.05
0.75
0.08
0.55
0.34
Dep. headway, hd
7.71
6.98
7.73
7.07
7.16
6.51
7.14
6.53
pacity
445
328
440
278
493
294
489
437
lay
16.91
10.92
16.32
10.18
28.19
9.78
18.15
12.55
LOS
C
B
C
B
D
A
C
B
proach:
Delay
15.33
15.58
26.27
15.89
LOS
C
C
D
C
�itersection Delay
18.81
Intersection
LOS C
HCS: Unsignalized Intersections Release 3.2
tone: Fax:
E-Mail:
ALL -WAY STOP CONTROL(AWSC) ANALYSI
Shields and Vine
Itersection:
ty/State:
Fort Collins, CO
Analyst:
Jeremy Klop
oject No.:
Existing PM Peak
me period Analyzed:
Fa
5:00-6:00 pm
te:
09/28/2000
Street:
Vine
fst/West
rth/South Street:
Shields
Worksheet 2 -
Volume Adjustments and
Site Characteristics
Eastbound
Westbound
Northbound
Southbound
L T
R
L T R
L
T R
L T
R
Uume
169
120 76
71
28 156 28
84
255 40
14 235
% Thrus Left Lane
tEastbound
Westbound
Northbound
Southbound
L1
L2 L1 L2
L1 L2
L1
L2
Infiguration
LT
R LT R
LT R
LT
R
PHF 0.90
0.90 0.90 1.00
0.90 0.90
0.90
0.90
ow Rate 217
78 204 28
376 44
276
187
Heavy Veh 2
2 2 0
2 2
2
2
No. Lanes
2 2
2
2
-Lanes
2 2
2
2
gposing
nflicting-lanes
2 2
2
2
eometry group
5 5
5
5
ration, T 0.25 hrs.
Worksheet 3
- Saturation Headway Adjustment
Worksheet
' Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
ow Rates:
Total in
Lane
217
78
204
28
376
44
276
187
Left -Turn
133
0
31
0
93
0
15
0
Right -Turn
0
78
0
28
0
44
0
187
op. Left -Turns
0.6
0.0
0.2
0.0
0.2
0.0
0.1
0.0
op. Right -Turns
0.0
1.0
0.0
1.0
0.0
1.0
0.0
1.0
op. Heavy Vehicle0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ometry Group
5
5
5
5
justments Table
10-40:
hLT-adj
0.2
0.2
0.2
0.2
hRT-adj
-0.6
-0.6
-0.6
-0.6
hHV-adj
1.7
1.7
1.7
1.7
�adj, computed
0.1
-0.6
0.1
-0.6
0.1
-0.6
0.1
-0.6
Worksheet
4 - Departure
Headway
and Service Time
'
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
low rate
335
132
126
17
283
32
356
147
d, initial value
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
, initial
0.30
0.12
0.11
0.02
0.25
0.03
0.32
0.13
hd, final value
7.32
6.64
7.93
7.25
7.42
6.75
7.12
6.50
final value
0.68
0.24
0.28
0.03
0.58
0.06
0.70
0.27
ove-up time, m
2.3
2.3
2.3
2.3
Service Time
5.0
4.3
5.6
5.0
5.1
4.5
4.8
4.2
Worksheet 5 - Capacity and Level of Service
Eastbound.
Westbound
Northbound
Southbound
'
L1
L2
L1
L2
L1
L2
L1
L2
low Rate
335
132
126
17
283
32
356
147
rvice Time
5.0
4.3
5.6
5.0
5.1
4.5
4.8
4.2
ilization, x
0.68
0.24
0.28
0.03
0.58
0.06
0.70
0.27
Dep. headway, hd
7.32
6.64
7.93
7.25
7.42
6.75
7.12
6.50
Lpacity
480
382
376
267
470
282
496
397
ay
24.23
11.46
13.65
10.21
19.97
9.88
24.98
11.53
LOS
C
B
B
B
C
A
C
B
proach:
1 Delay
20.62
13.24
18.94
21.05
LOS
C
B
C
C
intersection Delay
19.66
Intersection
LOS C
11
I
1
IHCS: Unsignalized Intersections Release 3.2
tone: Fax:
E-Mail:
,1 ALL -WAY STOP CONTROL(AWSC) ANALYSIS
Shields and Vine
ttersection:
ty/State:
Fort Collins, CO
Analyst:
Jeremy Klop
oject No.:
Existing AM Peak
me period Analyzed:
7:15-8:15 am
L te:
9/28/00
Street:
Vine
tst/West
?rth/South Street:
Shields
Worksheet 2 - Volume Adjustments and Site Characteristics
Eastbound
Westbound
Northbound
Southbound
L T R
L
T R
L
T R
L T
R
plume
176 29
133
120 119
26
89 17
80
30 291
Thrus LeftLane
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1 L2
L1 L2
L1
L2
Infiguration LT
R
LT R
LT R
LT
R
PHF 0.90
0.90
0.90 1.00
0.90 0.90
0.90
0.90
Rate 335
132
126 17
283 32
356
147
Iow
Heavy Veh 2
2
2 0
2 2
2
2
No. Lanes 2
2
2
2
posing -Lanes 2
2
2
2
(anflicting-lanes 2
2
2
2
;:;aometry group 5
5
5
5
Iiration, T 0.25 hrs.
Worksheet 3 -
Saturation Headway Adjustment
Worksheet
Eastbound
L1 L2
ow Rates:
Total in Lane 335 132
Left -Turn 133 0
Right -Turn 0 132
top. Left -Turns 0.4 0.0
op. Right -Turns 0.0 1.0
Prop. Heavy Vehicle0.0 0.0
ometry Group 5
justments Table 10-40:
hLT-adj 0.2
hRT-adj -0.6
hHV-adj 1.7
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
126
17
283
32
356
147
28
0
88
0
33
0
0
17
0
32
0
147
0.2
0.0
0.3
0.0
0.1
0.0
0.0
1.0
0.0
1.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
5
5
5
0.2
0.2
0.2
-0.6
-0.6
-0.6
1.7
1.7
1.7
r
Attachment "B"
PEDESTRIAN ANALYSIS WORKSHEET
Pedestrian Destinations
(within ; mile of project site)
Origin
(Project Site)
Rec.
Res.
Inst.
Ofc/Bus.
Corn.
Ind.
Other
(Specify)
Recreation
Residential
"UTNArI
�'4�wt
Institution
(school, church, civic)
Office/
Business
Commercial
Industrial
Other
(Specify)
Based upon the project's land use classification, the pedestrian Level of Service analysis for directness, continuity, street crossings, visual
Interestfamenity, and security should consider the applicable destinations which are located within one quarter mile of the project site.
DATE: �/' Z4, ' oO
TRAFFIC ENGINEER:
Attachment "A"
Transportation Impact Study
Base Assumptions
Project Name
Project Location
Study Area Boundaries
North:
South:
East:
West:
Study Yeats
doses
Future Traffic Growth Rate
- -7o
Study Intersections
1. All access drives
2. ��w--
3.
4.
5.
6.
7.
g_
Time Period for Study
AM
PM r
Sat Noon
Trip Generation Rates
r
Trip Adjustment Factors
Passby: rr
�+a
Captive
Market:
Overall Trip Distribution
North
South
East
West
Mode Split Assumptions
oac:
Committed Roadway Improvements
Other Traffic Studies
Areas Requiring Special Study
aka
Date: %- A. o 0s
Traffic Engineer: G
Transit level of service is based on hours of weekday service, headways, a travel time factor of
2.0, and a peak load factor of less than 1.2. Based on these criteria, which are established in the
Multimodal Transportation Level of Service Manual, the current level of service in the project
area meets the LOS D standard based analysis of the above criteria and the proximity to Route 9.
In addition, Shields is identified in the City of Fort Collins 2015 Transit Plan as a high frequency
transit route in the project area, which should improve transit level of service in the project area.
CONCLUSIONS
Based upon the site investigation, current and projected operating conditions, and the preceding
analysis, the following can be concluded:
• Under existing conditions, the intersection of Shields and Vine is operating at acceptable
levels of service.
• For the year 2005 background and total traffic conditions with project traffic, the study
intersection was found to operate acceptably with the current geometry.
• Pedestrian level of service standards are met by the proposed development, with the
exception of the continuity and street crossing elements, which suffer from gaps and a
lack of facilities at the Shields and Vine intersection.
• Recommended improvements include southbound and westbound right turn lanes
improvements at Shields and Vine and pedestrian facilities including crosswalk striping,
directional curb ramps, and appropriate signage.
I
11
I
I
I
I
I
I
1
I
VISUAL INTEREST AND AMENITY
The proposed new development, required to meet current development and landscape standards
will achieve or exceed the LOS C threshold through design of on -site pedestrian facilities and
amenities.
SECURITY
The key requirement for achieving a LOS B for security is adequate lighting and line -of sight for
visibility. Both of these will be included in the design of the proposed project.
BICYCLE LEVEL OF SERVICE
There are bicycle facilities within the study area along portions of both Shields and Vine. South
of Vine, Shields is designated as an on -street bicycle route. West of Shields, Vine is designated
as an on -street bicycle route. There are no bicycle facilities in place between the proposed
development and the intersection of Shields and Vine.
The required level of service standard identified in the Multimodal Transportation Level of
Service Manual is LOS C for bicycle facilities in the City of Fort Collins. LOS C is defined as
"directly connected to either a North -South or East-West corridor which is a set of on -street
lanes." Since no on -street bicycle lanes exist in the immediate project area, the project fails to
meet the LOS C standard.
TRANSIT LEVEL OF SERVICE
There is currently Transfort transit service along Vine Drive on the Pink Route (9) with hourly
feeder bus service. Service runs from 4:52 am to 6:17 pm on an hourly schedule, providing
approximately 13 hours of weekday service with a 60-minute headway. The development is not
located in a "mixed use center or commercial corridor" as designated by the City of Fort Collins
Multimodal Transportation Level of Service Manual, and as such, the LOS D standard applies.
I
the project to proximate institutional destinations were analyzed. The key institutional
destinations within the study area include Putnam Elementary School and Lincoln Junior High
School. Both of these destinations are west of the project area, and pedestrians will traverse the
Shields and Vine intersection to reach either destination.
1 DIRECTNESS
The goal of LOS B for direct pedestrian access to proximate residential developments is
' achieved with the proposed project. The grid pattern of the surrounding street network lends
itself well to direct connections to both schools in the area as well as the convenience store
timmediately south of the project.
' CONTINUITY
The goal of LOS B for continuity is not achieved due to a lack of a continuous sidewalk system
along the streets immediately south and west of the project area. A significant gap exists
' between the proposed development and the Shields and Vine intersection, as no sidewalks are
present in and around the Gasamat gas station and convenience store. Additionally, while
sidewalks are present in some locations along Vine west of Shields, no continuous sidewalk
system is in place to serve pedestrians walking to Lincoln Junior High. Sidewalks are present
south of the intersection along Shields, which do provide direct, continuous access to Putnam
Elementary School.
' STREET CROSSINGS
The goal of LOS B will not be met for the street crossings at Shields and Vine without additional
improvements to the intersection. These street crossings do not cross more than three lanes, but
no appropriate signing, crosswalks and standard directional curb ramps are currently in place.
Additionally, high traffic volumes in the peak hours do not allow for pedestrian gaps in the
traffic flow and a number of junior high age children were observed having difficulty crossing
the intersection during the traffic counts.
I
I
I
C
I
I
11
I
I
background traffic with the addition of the project traffic were developed for the short-term,
2005 condition. These projections are presented in Figure 8.
Short -Term Operations
The current network should adequately support both the projected background short-term traffic
growth and the project related traffic growth in the study area. The study intersection was
evaluated with and without the project traffic for the short-term study year of 2005. It continues
to operate at acceptable levels of service in the short run. Intersection geometry is generally
consistent with the existing network in the short run, though it is assumed that southbound and
westbound right turn lanes will either be improved or continue to operate informally as they do
in the current condition. Analysis of the short-term projections resulted in the following
operating condition seen in Table 3 and Table 4.
TABLE 3
Short Term Intersection Operations (Without Project)
Peak Hour LOS
Intersection
Control
Movement
AM
PM
Shields and Vine
Stop
Overall I
D
D
ITABLE 4
I
I
t.
I
i
Short Term Intersection Operations (With Project)
Peak Hour LOS
Intersection Control Movement AM PM
and Vine SCOA I Overall I D I D
PEDESTRIAN LEVELS OF SERVICE
The City of Fort Collins Multi -Modal Transportation Level of Service Manual was used to assess
future pedestrian conditions. Based on requests by the City Traffic Engineer, connections from
VINE DR
L S A
N IT
coo
N N i,
\ \ T
LO � \
rLO
M CO
20/33
� 103/181
30/32
142/146 "�
211/88
138/22 "7►
o
T
chi
IM \ y
V
CD
I- 85
CO T N
LEGEND
X� AM�PM TRAFFIC COUNTS
,�- xww
FIGURE 3
U4 LLC Overall Development Plan
2005 Total Traffic
SOURCE: LSA ASSOCIATES. INC. 9/29/00
o_
0 .5 1
MILES
L S A
LEGEND
XXm A"M TRAFFIC COUNTS
,�- xww
FIGURE %
U4 LLC Overall Development Plan
Project Traffic Assignment
SOURCE: LSA ASSOCIATES, INC. 9129/00
viw nR E 30-40%
L S A
LEGEND
f- � AII�PY TWFIC COURT$
'r- xxryy
I♦ ♦
1
1
1
1
6 5
FIGURE 6
U4 LLC Overall Development Plan
Project Trip Distribution
SOURCE: LSA ASSOCIATES, INC. 9/29/00
11
I
L
I
11
r
Project Traffic
Site traffic projections were estimated using the 6`s Edition of the TTE Trip Generation Manual,
as requested by the City Traffic Engineer. The Single Family Detached TTE category (210) was
used to generate trips for all of the units to provide a conservative estimate of trip generation.
Daily, AM, and PM peak hour trip generation associated with the development is specified in
TABLE 2
Trip Generation
AM PM
Land Use Size DUE rTE Code Rate ADT Enter Exit Total Enter Exit Total
Single Family Homes 2.38 acres 36 210 9.57 345 7 21 28 24 13 37
Table 2. The analysis assumes no transit, ridesharing, bicycle commuting, or telecommuting
mode split adjustments.
Trip Distribution and Assignment
Distribution assumptions for the trips generated by the U-4 LLC development site are based on
existing land uses, activity and employment center locations, and the existing trip distribution
observed during the peak hour traffic counts. There are no major changes in distribution
anticipated between the existing and short-term projections. The distribution is presented in
Figure 6 and expected project traffic assignment is illustrated in Figure 7.
IMPACT ANALYSIS
Roadway Improvements
No short-term roadway improvements are planned for the project area, however, it should be
noted that long-term improvements identified in the City of Fort Collins Master Street Plan
include the widening of Shields to a 4-lane arterial south of Vine.
Traffic Impacts
The key intersection identified by the City Traffic Engineer was analyzed for operating
conditions with the full buildout of the U-4 LLC project. Total traffic projections reflecting the
VINE DR
O
PILES
L S A
(D N
M I-
r N (D
\ A\ T
r CO M
20/32
103/181
30/32
139/139 I
211 /88 —�
138/22 �►
rn
I� N (D
O � cz
CDTN
LEGEND
A*IPY TRAFFIC COUNTS
IC xxiry
FIGURE rJ
U4 LLC Overall Development Plan
2005 Background Traffic
' SOURCE: LSA ASSOCIATES, INC. 9129/00
It should also be noted that the intersection currently operates at a failing level of service without
the addition of the southbound and westbound right turn lanes in the HCS calculation. Since the
observed operation of the intersection included the use of these informal southbound and
' westbound right turn lanes, and since improvements to the intersection are anticipated in
conjunction with the Master Street Plan, the capacity analysis includes a dedicated right turn lane
for each movement in both the existing and short-term analysis.
I FUTURE BACKGROUND TRAFFIC PROJECTIONS
Short Term Background Traffic
Background traffic was projected using an annual growth rate of 3% on the surrounding roadway
network. Existing traffic volumes were factored using this growth rate to approximate traffic
conditions in 2005. The full development of the U-4 LLC site was assumed for the short-term
calculations. Short-term background traffic conditions are shown in Figure 5. The study
intersection also continues to operate at acceptable levels of service (LOS D or better).
PROJECT TRAFFIC PROJECTIONS
IDevelopment Character
The U-4 LLC development may be a mixed -use development and may include singe and mult-
family 4-plexes, 6-plexes, and 9-plexes. The land uses identified in the U-4 LLC Overall
Development Plan are based on the best estimate of the likely development on the parcel. In
order to present a conservative estimate of traffic generation, the maximum density identified on
the Overall Development Plan was assumed.
' Surrounding land uses are primarily residential, with a gas station and convenience store located
immediately to the south. Access to the site is planned via a right -in -right -out access at the
southwest edge of the site onto Shields, and a full movement access at the northwest edge of the
site.
'
cn
cn
W
�
�
En
IM
IM M M M M
rn In
co ch
rNti'
� � T
r N cc*)
#` 17/28
II
j I
� 89/156
26/28
VINE DR y
kc—
120/120
1 I r
182/76
—�
119/71
7►
LO
N a
OC�OrN
L S A
LEGEND
A"M TK"FIC COUNTS
XX/YV
FIGVBE 4
U4 LLC Overall Development Plan
Recent Peak Hour Traffic
SOURCE: LSA ASSOCIATES, INC. 9/29/00
1
1 L S A
FIGURE 3
U4 LLC Overall Development Plan
Existing Roadway Geometry
SOURCE: LSA ASSOCIATES, INC. 9/29/00
I
11
i
r
I
1
I
�j
7
ILj
Shields and Vine are both designated as on -street routes for bicyclists, which extend south and
west from the intersection. On -street bicycle routes are defined as low -volume local streets,
which the City has designated and signed as bicycle routes, and in which cyclist share the travel
lanes with motor vehicles. It should be noted that between in the AM peak hour, over 20
cyclists were observed using the intersection of Shields and Vine, and that in the PM peak hour
14 cyclists were observed.
Existing Traffic
Weekday morning and afternoon peak hour traffic counts were taken at the study intersection to
establish current intersection operating conditions. The intersection is currently all way stop
controlled with the operating lane geometry identified in Figure 3. Existing traffic conditions are
presented in Figure 4.
Existing Level of Service
The study intersection is currently operating at level of service C or better as shown in Table 1.
This level of service is achieved with the assumption of dedicated right turn lanes for all
approach lanes. While only the northbound and eastbound approaches have striped lanes with
storage and tapers, it was observed that southbound and westbound right turning vehicles utilize
adequate paved width and shoulder space to allow a dedicated right turn movement in these
directions as well. The general lack of striping at the intersection may contribute to this
observed driver behavior. Level of Service calculations for the unsignalized intersection reflect
the Highway Capacity Manual procedures and are included in the Technical Appendix.
TABLE I
Existing Intersection Operations
Peak Hour LOS
Intersection Control Movement AM PM
Shields St. and Vine Ave. I Stop Overall I C I C
I
�- 410�
�-�
r
w Kffm FlGY TOP
SANK OF MnKM a(W
' N
Jor
II ' Single/ti-Family) Mul
B-a a✓.a
wart TUM II I 93-H aLL r
MW naM 0l
—1 , 1
ti
ooLE,ty 1 w store
C mwordsl
1 —3010
VINE DRIVE
L S A
FIGURE 2
U4 LLC Overall Development Plan
Project Site Plan
SOURCE: LSA ASSOCIATES. INC. 9/29/00
ANALYSIS OF EXISTING CONDITIONS
Existing Transportation System
The U-4 LLC development is bordered on the west by Shields Street, on the north by the Arthur
Ditch, on the east by existing low density residential uses, and on the south by the Gasamat gas
station and convenience store. The site plan for the parcel is illustrated in Figure 2.
Shields Street is currently a 2-lane facility with no curb and gutter north of Vine. The posted
speed limit is 30mph both north and south of Vine in the immediate project area. Shields serves
as the first north -south connection between Fort Collins and US 287 west of College Avenue. It
also provides direct access to low -density rural residential parcels in Larimer County
immediately north of the project site. South of Vine, Shields is designated as a 4-lane Arterial in
the City of Fort Collins Master Street Plan and north of Vine, it is designated as a Minor Arterial
with 2 lanes.
Vine Drive is currently a 2-lane facility with curb and gutter generally along it south edge in the
project area. The posted speed limit is 30mph, and Vine is designated as a Minor Arterial with 2
lanes in the Master Street Plan. Land uses along Vine in the project area are primarily
residential, and collector access as well as direct residential access is provided in the project area.
The intersection of Shields and Vine is an all way stop controlled intersection. Northbound and
eastbound right turn lanes are present on Shields and Vine, respectively. There are also de -facto
southbound and westbound right turn lanes that are utilized in the peak hour periods (observed
during traffic counts).
Sidewalks are present on both sides of Shields south of Vine, and along the south edge of Vine in
the vicinity of the intersection, but no sidewalks are provided on either side of Shields north of
Vine. No crosswalks, sidewalk ramps, or other pedestrian facilities are provided at the
intersection of Shields and Vine. Direct and continuous sidewalk connections generally exist
south of the intersection to the residential neighborhoods on either side of Shields and to Putnam
Elementary.
s
L S A
LEGEND
khLOCATION OF PROJECT
FIGURE 1
U4 LLC Overall Development Plan
Project Location
SOURCE: LSA ASSOCIATES. INC. 9/8/00
INTRODUCTION
This transportation impact analysis study describes the transportation implications of the U-4
' LLC Overall Development Plan. The 2.4-acre site is located northeast of the intersection of
Shields and Vine, just north of the Gasamat gas station and convenience store on the corner. The
' development will consist of attached multi -family housing in the form of 4-plexes, 6-plexes, or
9-plexes and will add up to 36 dwelling units to the site. A map of the project location is
' presented in Figure 1.
The City of Fort Collins Transportation Impact Study Guidelines (Revised March 27, 1998)
document was used to prepare this report. Accordingly, the analysis includes the following
' sections:
• Analysis of Existing Conditions
' • Future Background Traffic Projections
' • Project Traffic Projections
• Impact Analysis
' • Conclusions
• Technical Appendix
' Per the TIS Guidelines, an initial scoping meeting with Eric Bracke, the City Traffic Engineer,
' was held to establish the scope of this analysis, identify study intersections, and determine base
assumptions for the study. It was agreed that the analysis should incorporate the following
' elements:
• Traffic growth projections for 2005
' • A 3% future traffic growth rate
• Impact analysis for the intersection of Shields and Vine
' • Pedestrian analysis for Residential to Institutional destinations, including Lincoln Junior
High and Putnam Elementary.
i
I FIGURES AND TABLES
'
Figure 1. Map of Project Location
Figure 2. Project Site Plan
Figure 3. Existing Roadway Geometry
Figure 4. Recent Peak Hour Traffic
'
Figure 5. Short Term Background Traffic
Figure 6. Project Trip Distribution
'
Figure 7. Project Traffic Assignment
Figure 8. Short Term Total Traffic
t
Table 1. Existing Intersection Operation
' Table 2. Project Trip Generation
Table 3. Short -Term Intersection Operation (Without Project)
' Table 4. Short -Term Intersection Operation (With Project)
[1
1
II
' TRANSPORTATION IMPACT ANALYSIS
U4 LLC Overall Development Plan
FORT COLLINS, COLORADO
SEPTEMBER 2000
L S A
Vaughn Furness
From: Eric Bracke [ebracke@ci.fort-collins.co.us]
Sent: Monday, September 11, 2000 12:07 PM
To: cgloss@ci.fort-collins.co.us; KREAVIS@ci.fort-collins.co.us
Cc:"INET:vaughnf'@jimselldesign.com
Subject: Re: u-4 Affordable housing
They will do a full TIS, it will just be a couple of weeks late.
Eric
>>> Kathleen Reavis 09/11 10:58 AM >>>
Are they going to do the full TIS? If not, I would at least want the alternative mode
portion done. Thanks.
KR
>>> Eric Bracke 09/11 10:05 AM >>>
Cameron,
I am going to let one more project slide on the TIS requirements. U-4 Affordable Housing
Project @ Shields and Vine, can submit their TIS by September 30th.
Eric