Loading...
HomeMy WebLinkAboutU-4 ODP & MODIFICATION OF STANDARDS - 37-00 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW12. Current Planning: a. You will likely be required to provide access into your site from Shields Street as well as at least one access point from Vine Drive. b. Refer to Section 3 (General Development Standards), and Section 4.4 (LMN Zoning District) in the Land Use Code for the standards that apply to your propose development. The Land Use Code is available to view on the internet atwww.ci.fort-collins.co.us/CITY HALL/CODES. c. There are length restrictions and articulation requirements for rear walls of multifamily garages if you are considering such garages d. Street trees are required at to be located along the streets at 30 foot to 40 foot spacing intervals. e. Full tree stocking is required in all landscaped areas within 50 feet of the building. f. 5 foot wide foundation plantings are required along 50% of all exposed sections of building walls. g. Parking lots shall be screened from the street and adjacent properties. h.. Dumpsters must be screened. i. Primary entrances must face a connecting walkway and be no further than 200 feet from a street sidewalk. "Connecting walkway' is defined in Article 5 of the LUC, and specifically calls out that such a sidewalk must connect the building entrance to the street sidewalk without requiring pedestrians to walk across parking lots or driveways, around building, or follow parking lot outlines which are not aligned to a logical route. R e. Show the internal pedestrian circulation on site. #. A pedestrian connection to Gasamat should be provided. g. A pedestrian connection to the park to the south should be provided. h. You will be required to make sidewalk and parkway improvements to Shields Street, and to Vine if lot 2 is part of your proposed plan. 9. Historic Preservation: a. As long as there are no structures over 50 years old on the site, no comment. 10. Advance Planning: a. The possibility of rezoning to MMN is remote. b. Being an affordable housing project is currently a justifiable reason for the Planning and Zoning Board to grant a modification. You should probably be aware that there are currently discussions about taking out the example reference to affordable housing in section 2.8.2(H)(2) out of the LUC in the upcoming spring Land Use Code revisions. c. The project currently does not qualify for affordable housing. The project cannot be recognized as affordable until you have met the requirements for such. See Ken Waido for any questions. d. If you choose to seek a modification, arguments that should be discussed are the projects proximity to infrastructure that would support the density such as schools, parks, transit, etc. e. If you choose to seek a modification to the density limit of 12 units an acre. You should be aware that when this section of the code was under initial consideration for inclusion in the LUC, 14 dwelling units was discussed as possible an appropriate density. You might have luck getting staff/board support at 14 units per acre, but you might have difficulty getting support for much higher than that. f. If the project qualifies as affordable, you are eligible for: • Priority processing (quicker review time), • Development review fee waived, • Sales tax rebate, • .Impact fee delay. 11. Park Planning: a. The neighborhood and community parkland fees are based on square footage of each unit, and are due at the time of building permit. b. A fee schedule including the park fees was given to you at the Conceptual Review meeting. 5 b. If there any prairie dogs on site, they will have to be relocated or humainly eradicated. c. Trash enclosures should accommodate recycling containers of sufficient size to accommodate the type of recycling appropriate for the building use (newspapers, cans, plastics, glass etc.), and dumpsters must be enclosed within a fenced or walled area. d. We ask that a single trash hauler be used to minimize troffic impacts. e. _ Native grasses and plant materials should be used wherever appropriate, and bluegrasses should be minimized. f. If construction lasts for more than 6 months, you will have to file a permit for fugitive dust control with Lorimer County. 6. Fire Department: a. Access to the rear of every building must be no further than 150 feet from where the fire truck would park measured as the hose would lay. b. Address must be visible from the street using a minimum 6" numerals on a contrasting background. c. A fire hydrant must be within 300' of every building (measured as a hose would lay) with a capacity of 1500 g.p.m @ 20 p.s.i. Hydrants must be spaced no further apart than 600 feet on center. d. The fire code doesn't require you to setback your development from the existing fuel tanks, however you are required to file a Hazardous Material Impact Analysis. The Hazardous Material Impact Analysis needs to address the prevailing air, the spill flow directions, and the potential impacts to the nearest storm drainage system. 7. Light and Power: a. You have a couple of choices to get power into this site: • Extend to the site from Vine Drive and possibly use that existing 10 foot utility easement, or • Obtain an off -site easement at least 6 feet wide along the Gasamat property. b. You will need a utility coordination meeting to coordinate meter locations with the other on -site utilities. c. Normal development fees apply. 8. Transportation: a. Depending on the results of the TIS, you may be required to make improvements to the Shields & Vine intersection. b. A transit route currently runs down Vine Drive.. c. Bike racks must be provided for each building. d. Ensure that the site plan avoids parking lot pedestrian/vehicle conflicts. Off site easements and conveyances may be needed. If there is a change it water quality, quantity or character, an easement is required. e. Water quality needs to be addressed with onsite extended detention which can be added to the quantity detention. 3. Engineering Department: a. Street Oversizing Fees would be between $948 and $1021 per unit. Check with Matt Baker for the specific amount of this fee for your project. b. Additional street right-of-way and utility easements must be dedicated along Shields and improved to minor arterial standards (84 feet of right-of- way). Shields currently exists with 50.5 feet of right-of-way (full width). c. If plating lot 2, dedicate right-of-way for Vine and do improvements. d. Use of the private drive can only be done if this is considered multi -family. e. Sidewalk, curb, and gutter may be required to extend to the nearest improved arterial depending on your projected traffic counts. f. The project will require a Traffic Impact Study (TIS) that addresses site access, and all modes of transportation including automobile, bicycle, pedestrian, and tran�si�t. g. You may be pMo d'e o provide access or stub a future connection to adjacent developable properties. h. Street connection to the arterial cannot exceed 660 feet. i. Because of parking set back requirements, you would probably lose a few spots as shown. j. You will be required to have a Development Agreement, a Development Construction Permit, and Utility Plans. 4. Water & Wastewater Utility: a. EX. Mains: 12-inch water main in Shields; 12-inch water and 30-inch sewer in Vine. b. Connect to the existing water distribution system at two locations, preferably on Shields and on Vine. c. Extend sewer either in Shields or in private drive connection off Vine. d. If sewer is not in R.O.W., provide a 30 foot wide easement. e. The water conservation standards for landscape and irrigation will apply. f. Plant Investment Fees and water rights will be due at time of building permit. 5. Natural Resources: a. An Ecological Characterization Study may need to be provided if Natural Resources staff determines that Aurther's Ditch has significant plant life or wildlife corridors associated with it. 3 COMMENTS: 1. Zoning Department: a. The site is in the LMN zoning district. b. Because your site is less than 20 acres, there is no minimum density requirement for the property. c. If your project in fact becomes designated as an affordable housing project by the Advance Planning Department, and because your project is smaller .than 10 acres, you will be allowed to build at a density of 12 units per gross acre of land. d. Two possible ways you might be allowed to build at the densities you desire would be either to rezone the property to MMN, or request a modification to the 4.4(D)(1)(b) of the LUC to increase the maximum density allowed for your project. e. The required number of parking spaces will be based on the number of bedrooms. f. The number of required handicap spaces are based on the total number of parking spaces in the project. g. You must provide adequate bicycle parking. h. Size your trash enclosures based on the number of units using them. Include recycling. i. Six percent of the interior area of the parking lot shall be devoted to landscaped areas. ! J No more than 15 spaces are allowed in a row without an intervening landscape peninsula. k. The buildings are limited to 2 2 stories in the LMN zoning district. 2. Stormwater Utility Department: a. This site is in the West Vine drainage basin where the new development fee is $7,004/acre and is subject to the runoff coefficient reduction. The site is in inventory grid #6F. b. The, site is also in the West Vine floodplain which is a no -rise floodplain. HEC-2 must be used to demonstrate no -rise. c. Floodplain Use Permits would be required. The no -rise criteria is part of this permit. Other requirements are elevation of 18 inches above the 100 year floodplain water surface. This is being updated so the master planning division will work with the design engineer.to establish the new water surface elevation with the new runoff requirement. For all floodplain requirements, please contact Marsha Hilmes-Robinson at 224-6036. d. On -site detention would be required and the standard release rate would be the 2 year historic. The outf all may be a problem if the existing site drainage does not follow a dedicated drainage easement or street R.O.W. 18�1��1 2 MEETING DATE: February 14, 2000 ITEM: Affordable housing apartments north of Gasamat at Shields and Vine Drive. APPLICANT: Vaughn Furness Jim Sell Design 153 Mountain Avenue Fort Collins, CO 80524 LAND USE DATA: Two alternatives were proposed. The first (Concept Plan A) was total of 6 apartment buildings comprised of 4 buildings with 8 units each, a 4 unit building, and a 6 unit building for a density of 22 units/acre. The second (Concept Plan B) was 4 apartment buildings with 12 units in each building for a density of 25 units/acre. The property abuts a gas station. There are above ground gasoline storage tanks on the adjacent property next to the property line. DEPARTMENTAL CONTACTS: Current Planning- Troy Jones 221-6750 Advance Planning- Ken Waido 221-6376 Zoning Department- Jenny. Nuckols 221-6760 Engineering Department- Sheri Wamhoff 221-6605 Street Oversizing Coordinator- Matt Baker 221-6605 Poudre Fire Authority- Ron Gonzales 221-6570 Stormwater Utility- Glen Schlueter 224-6065 Water & Sewer Utilities- O'Aflk�v Roger Buffington 221-6854 Natural Resources Development Planner Kim Kreimeyer 221-6750 Light and Power Doug Martine 221-6700 Transportation Services (ped. & transit) Mark Jackson 416-2029 Transportation Services (traffic) Eric Bracke 224-6062 Transfort (local bus service) Gaylene Rossiter 224-6195 Park Planning Janet Meisel -Burns 221-6367 COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT Commi y Planning and Environmental vices Current Planning City of Fort Collins Vaughn Furness Jim Sell Design 153 Mountain Avenue Fort Collins, CO 80524 February 18, 2000 Dear Mr. Furness: For your information, attached is a copy of the Staff's comments concerning the Affordable Housing apartments at the corner of Vine and Shields presented before the Conceptual Review Team on February 14, 2000. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. mcerely, Troy' Jones City Planner cc: Eric Bracke, Streets Department Stormwater Department Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 No Text 8) Light and Power comments: a) Service to the site - noted. b) Utility coordination meeting will be scheduled prior to PDP. c) Developer will pay normal development charges and work within the current policies. 9) Transportation Planning comments: ' a) . Noted.- b) Noted. c) Noted.. d) . Noted. e) • Pedestrian connections to Gasamat will be provided. f) Noted. . 9) Noted. . 10) Historic Preservation: a) No structures on site. 11)Advance Planning Comments: a) Noted. b) Noted. c) Noted. d) Noted.. e) Noted. f) Noted. 12) Park Planning Department comments: o a) Noted. b) All residential dwelling units will be within a 1/3 mile distance, measured along the roads and pedestrian paths, to a park. c) Parkfees will be paid, at current rate,,at time of building permit. The current rate today is: $955/unit for neighborhood park. and $1,002/unit for community parks.. ` 13)Current Planning Department comments: a) Noted. b) Noted. EAVaughn\1961\odp\1961ODP.justdoc . _ 9 d) n s Noted. e) A Transportation Impact Study has been deferred to PDP.submittal,. as per. Eric Bracke. f) Noted. . g) Noted. h) Noted. - i) Noted. , j) Noted. 5) Water'and Wastewater Department comments: a) Existing mains.- noted. r b) Noted. c). Noted. d) Noted. e) This development will use the City of Fort Collins water conservation standards for landscape and irrigation systems. f) Plant investment fees and water rights will be paid at application for building permits, except for qualified affordable housing projects: 6) Natural Resources: . a) An Ecological Characterization Study will be completed for a PDP submittal: We have. provided a 50' natural area buffer area along the Aurther's Ditch. ' b) Noted. c) :Noted: d) 'Noted. e)• Noted. f) Noted. 7) Poudre Fire Authority comments: a). Noted. b) Noted. c) Fire hydrants will be spaced at 300minimum from all buildings (measured as a hose will lay). Noted. d) A Hazardous Material Impact Analysis will be submitted with.the PDP submittal addressing the prevailing air, the spill flow directions, and the potential impacts to the nearest storm drainage system. E:\Vaughn\1961\odp\1961ODP.just.doc • '' 8 ATTACHMENT II Conceptual Review Letters and explanation of how issues have been addressed Conceptual Review Letter — February 2000 Explanation of how issues have beer' addressed: 2) Zoning Department comments: . a) Noted. b) Noted. c) Noted: , d) We'have included with this ODP submittal a request for a modification the Land Use Code for a higher density affordable housing project. . e) Noted. f) Noted. g) Noted. h) Noted. i) Noted. j) Noted. k) We have included with this CDP submittal a request for a modification to the Land Use ' Code for an increase in the allowable building height. 3) Stormwater Utility comments: a) Noted.. b) Noted. c) Noted. d) Noted. e) -Noted. 4) Engineering comments: a) Street Oversizing fees will be paid by developer. b) Additional Street right-of-way andutility easements will be dedicated along Shields Street. c) Noted, we are not -planning to Plat Lot 2 at this time. • E1Vaughn\1961\odp\1961ODP.just.doc 7