Loading...
HomeMy WebLinkAboutPEAK VIEW - MAJOR AMENDMENT - 26-00B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Planner: e-6 c�' Traffic Operations: Engineer: _�� Date: 101elaz Items Requited Site land Plat Utiliq I Drainage R t Other Items Required Engineering x x x 2 itormwater X Redlined Items Being Returned Site land Plat Utility Drainage R t Other Itemi Being Returned x x — x Water/Waitewate x x x x x x x irafbit Operationi _ Trans. Planning Tra—m6rt Natural Resources _ Park Planning Other: Note: All redlined items should k returned with the resubmittal/ revisions. Revisions Routing She et all , • , ' FILE: PROJECT PLANNER ENGINEERING: PAVEMENT m LIGHT & POWER WATER CONSERVATION • • • --�---------- iiii��������� PUBLJC SERVICE STATE HIGHWAY DEPARTMENT DITCH COMPANY mom NoRAILROAD: UP or BN/Cs m NO mm mm � i��ON MOM