Loading...
HomeMy WebLinkAbout1005 LAUREL STREET, WIRELESS TELECOMMUNICATIONS FACILITY - PDP/FDP - 28-00 - CORRESPONDENCE -City of Fort Collins Commu / Planning and Environmental ' vices Current Planning STAFF REVIEW COMMENTS Justin Robinson September 20, 2000 Nextel Communications 4643 5. Ulster Street, Suite 500 Denver, CO 80237 Staff has reviewed your proposal for the 1005 Laurel Street Wireless Telecommunication Facility and Equipment, Project Development Plan and offer the following comments: COMMENTS: 1. AT&T Digital, Poudre Fire Authority, Natural Resources, Technical Services: a. These departments and agencies have indicated that they have no comment on this project. 2. Zoning, Advance Planning, Stormwater, Light & Power, Water/Wastewater, Engineering: a. Please see the attached comment sheets and/or redlined plans from these departments. 3. Current Planning: a. The pole is to be painted an earthtone color, and not be galvanized [LUC 3.8.18(C)(8)]. b. Chain link fencing is not permitted for screening. The fence must be wood, masonry, stucco, or other opaque material [3.8.18(C)(5)]. c. The new shelter proposed on the plans is a wireless telecommunication facility by definition [LUC 5.1.2]. Wireless telecommunication facilities are not permitted in the NCB zone. Sportsman Storage is in the NCB zone. As we verbally discussed, you cannot propose to build a new structure for the �ti I \orth College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 •FAX (970) k16-202U purpose of locating wireless telecommunication equipment as part of this application. The only way your proposal to locate the cabinet equipment in a shed on the Sportsman Storage site would be allowed is if that equipment is placed into an existing building. d. If you want to build a new shed on the Sportsman Storage site, you can pull a building permit to do that. Once the shed is existing, you can propose to use the existing shed to house wireless telecommunication equipment. e. Once you have an existing structure, you can resubmit your revisions with the shed labeled as "existing." f. The title of the page should be changed from "E. Fort Collins; CO 0264- Zoning" to "Wireless Telecommunications Facility & Equipment; 1005 Laurel Street." g. Once all comments form all departments and agencies are addressed, we can schedule the project for a Type 2, Planning and Zoning Board Hearing. h. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by December 19, 2000. A 30 day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. If you have any questions about these or any other issues related to this project please feel free to call be at 221-6750. Yo rs truly, A Tr y Jones City Planner