Loading...
HomeMy WebLinkAboutSTODDARD PROPERTY - OVERALL DEVELOPMENT PLAN - 42-00 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: #- yz _ Planner: Steve- C)I+ Engineer: Kxke, Moor+Z Traffic Operations: ward SfAArd Date:. z Zo.of Items Requested Site I land Plat Utility I Drainage R t Other Items Required ROW Items Being Returned Site I land I Plat Utility Drainage R t Other Items Being Returned Engineering x Wormwater _ Water/Wastewate Tralfc Operations X x x Dred liilc wi: I Trans. Planning X X — — Trarofort � — Natural Resources�a �—� ^ -<< •r — Park Planning Totals Other: Note: All Wlined items should be returned with the resubmittal/ revisions. r j Revisions Routing Sheet - 2- Item: [# 42- N ]X. Date: 1.16.01 PROJE ENGINEERING: PAVEMENT M oil BUILDING INSPECTION LIGHT & POWER MM • • ---------- =:---------- ADVANCE ---��---ISO -�--_ •• ..-a.w;.ocnrc�iiyl� POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE/THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS REA/DOE/PRPA TOTAL xC% so- v7