• International Blvd. Is a collector.
Stormwater:
• Stormwater fees shall be $5,000/acre.
• On -site detention will be required with a 10 year release rate.
• Drainage easements are needed to the Dry Creek drainage channel at Timberline
Road.
• May be some drainage improvements required downstream, noted.
ATTACHMENT
Conceptual Review Letters
and explanation of how issues have been addressed
Conceptual Review Letter — September 11, 2000
Explanation of how issues have been addressed:
Zoning Department:
• Not an infill project.
• Type II ODP
• Minimum of 2 housing types will be addressed at PDP.
• Minimum of 4 housing models will be addressed at PDP.
Light and Power Department:
• Power is available
ELCO:
• There is an 8" waterline in a 20' easement from south drainage, could overlay
Parks and Recreation Department:
• City would like a mini -park in this area. Developer will coordinate with the city staff.
Natural Resources:
• There are no wetlands on this site.
• Ecological Characterization Study will be completed at time of PDP submittal.
• There is a 100' buffer shown on the ODP.
• Trash area will be contained to include a recycle area.
Poudre Valley Fire:
• May be able to rezoning to industrial
• Need 1,500 GPM @ 20 PSI reg. for industrial.
• Fire hydrant spacing shall be 300'.
Engineering:
• TIS has been submitted with this ODP.
Transportation:
0