Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWALLOW APARTMENTS - AMENDED FDP - 45-00C - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET
Project: Planner: T LEx o-rd Traffic Operations: Engineer: Kam ,Atoryre, Date: �, F,D,9� Items Requested Site land Plat Utility Drainage Rpt Other Items Required Redlined Items Being Returned Site land Plat Utility Drainage R t Other Items Being Returned Engineering Stormwater Water/Waitewate Tragic Operations Trans. Planning Tramfort Natural Resources Park Planning Totals I i 2 i Other: Hote: All rediined items should be returned with the resubmittal/ rdilom. VICKI r 2xG- SIis, BUILDING INSPECTION LIGHT & POWER 1 • 1 -----.------- -----.------_ • • �---..-..-.-- WATER CONSERVATION m POST OMCE •------- --- DEPARTMENTSTATE HIGIBVAY --------RAILROAD: ----- 1 • -----.------_ UP or BN/CS mm • 1 • ... m m -:=--.------- mom�i� t+S,Ryii 6'➢. Project Name: ,SiJALLO U 0 - PG£X File #: Jft' ys' DO s"r. (=�iftnsm6u%ti % �-/ZdD2 FINAL COMPLIANCE ROUTING SHEET THIS PROJECT HAS BEEN SCHEDULED FOR PUBLIC HEARING ON 01AV cb?gi_ o.?GQ Z . THE FOLLOWING TABLE LISTS SUBMITTAL REQUIREMENTS FOR FINAL COMPLIANCE FOR THIS PROJECT. A FINAL COMPLIANCE FEE OF $1000.00IS REQUIRED AT THE TIME OF SUBMITTAL LLINLESS OTHERWISE WAIVED OR REDUCED. FEE WAIVER/REDUCTION APPROVAL .✓Yr/� AMOUNT DATE to ' 7 0 "WHEN FINAL PLAT MYLAR5-ARE SUBMITTE- , A CERTIFICATE OF TAXES DUE SHOWING A ZERO BALANCE MUST ALSO BE SUBMITTED. THIS CAN BE OBTAINED AT LARIMER COUNTY OFFICE OF TREASURY, 200 WEST OAK STREET, FORT COLLINS, CO. zo �C' Qaah �a� a �� o� �a �z w FILE: PROJECT PLANNER ENGINEERING ZONING BUILDING INSPECTION LIGHT & POWER TECHNICAL SERVICES STO RM W ATE R WATER & WASTEWATER/FCLD TRAFFIC OPERATIONS TRANSPORTATION PLANNING NATURAL RESOURCES ADVANCE PLANNING TOTAL CITY PLANNER: DEVELOPMENT REVIEW ENGINEER: DATE Sf /VF- �f ©J2 DATE ji t'+2� —