Loading...
HomeMy WebLinkAboutSWALLOW APARTMENTS - AMENDED PDP - 45-00B - CORRESPONDENCE - REVISIONSZoning Issue Contact: Jenny Nuckols 3 Just an idea — relocate bike rack closer to south or west side of the building for security purposes. RESPONSE: We looked at relocating the bike rack. On the south side of building, it is too tight between the parking and the building. We also looked at the farthest west parking island and discovered that the concrete slab would have interfered with a proposed drainage swale. We feel that the best location is at the southeast corner of the building. We do have large shrubs along the building that should help screen the bike rack from the street. 4 The patio overhangs should be included in the building envelope. It doesn't appear that they are. RESPONSE: The balcony overhangs have been added to the site and landscape plans. 5 Note building height on elevations RESPONSE: The building height has been added to the elevations 6 What are the proposed building colors? RESPONSE: The colors have been included on the elevations. Engineering Issue Contact: Katie Moore 16 Please bring cover sheet and details sheet up to the Larimer County Urban Area Street Standards. RESPONSE: Updated all notes to match Larimer County Urban Area Street Standards. Sincerely, Vicki Diehl Administrative Assistant 3. Silt fencing (in part) runs along the east side of the property, but there is none across the concrete entrance at the southeast corner of the project. The silt fence will collect all the flow and then direct it out onto Remington through the concrete entrance. How are you going to prevent that from happening? RESPONSE: Enlarged construction entrance to cover the entire entrance. 4. Why doesn't the silt fencing go all the way along the south boundary of the project? RESPONSE: The silt fence was provided; however, it did not show up properly on the drawings and this has been corrected. Transportation Planning Issue Contact: Mark Jackson 12 No further comments. New use works on site plan from a bike/ped perspective. RESPONSE: Noted. Water/Wastewater 0 10 Issue Contact: Jeff Hill Include the standard general notes pertaining to depth of bury of water lines and polywrapping of D.I.P. on the overall utility plan sheet. RESPONSE: Added notes. Clearly define the connection of the fire line to the existing water main as being a "6X4" tapping saddle with a T.B. and a 4" G.V." RESPONSE: Drawings have been revised and updated. Show the proposed fire line on all plan sets (i.e. site plan and landscape plans). See site, landscape and utility plans for other comments. RESPONSE: The fire line has been added to the site and landscape plans. Shrubs have been relocated to maintain the required separation. 13 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. 97 UFC 901.4.4 RESPONSE: We will use 6-inch address numerals on the front of the building facing Swallow Road. 14 Water Supply: No commercial building can be greater than 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2 RESPONSE: Existing fire hydrant shown on Remington is within 300 feet of the building. 15 Building Area: This proposed building exceeds 5000 square feet and must be fire contained or fire sprinklered. 97 UBC Table 9B RESPONSE: Fire sprinklers are being provided. Stormwater Utility Issue Contact: Wes Lamarque 11 Please submit a new drainage report with next submittal. RESPONSE: Drainage report is being submitted (no significant change from previous submittals). Erosion / Sediment Control 7 This plan has been reviewed several times under other names (Swallow Office Bldg., TbirdEstates 9th). On this go -round, the following apply: 1. There is no report, calculations, escrow, etc. RESPONSE: Report, calculations, escrow, etc. are being provided in drainage report with this submittal. 2. The Standard Erosion Control notes on the plan are incomplete. RESPONSE: Updated Erosion control notes. LAGUNITAS COMPANY 3944 JFK Parkway, Fort Collins, CO 80525 970-226-5000 • Fax 970-226-5125 June 4, 2002 Mr. Ted Shepard, Planner Current Planning City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 RE: Swallow Residential Eight-Plex Building / Response to Staff Comments Dear Ted: The following are our responses to staff comments from the staff project review letter sent to us dated May 17, 2002. Light and Power Issue Contact: Doug Martine 1 The front (south) side of the existing electric transformer (called "electric vault' on the plans) must have 8 ft. of clearance from the edge of the pad to any obstacle (including trees & shrubs). This will require changing the landscaping. Depending on the power requirements for this project, an additional transformer to the south of the existing one may be necessary. RESPONSE: We have removed all of the planting within 8-feet of the transformer pad as requested. There will be rock mulch in the area instead. 2 Developer needs to coordinate power requirements and electric development charges with Light & Power Engineering (221-6700). RESPONSE: We will coordinate all power requirements and electric development charges with Light & Power Engineering. PFA Issue Contact: Michael Chavez