oases May 1.2001
T0' Corky Bradley
9oo+p RB+B
Fax& (970)4A4.0264
'* (970)484.0117
CC:
Teffit l l .y_ OWN" lbt eoier tw
ahaft. Oren 1. b4cMul1en
PSD Prototype
Reference:
N thg aot►o ule:taxo�lroos►o�, plesae.ta9tnaf9Q3.986.8100
Corkyt
The 90% CD review set did in fact contain a site lighting plan and luminaire schedule. We designed the
exterior lighting, with the aid of the manufacturer specified. to the footcandle levels dictated in the PSD
Teohnisal Specifications. Those levels are 2 Pc. mittitnum for parking areas and t fc minimum for the
building exterior. The lamp source specified by PSD is high pressure sodium.
...mom In comparing the lighting requirements of the City of Fort Collins with those of the school district, our
design exceeds the minimum mquitements of the City.
If we can be of further assistance in this matter, Please do not hesitate to call out office.
0099
PwwwsNew**bsftstMM
MAY 02 101 03:20PM RBB
RBB Arehite e.
P.5
8. Please I" the adjacent street The plan shows the property line running down the middle of the County Road,
yet indicates that there is 41 feet of right-of-way. The property line should follow the edge of the right-of-way.
Reply: Changed to 42 feet and property line has been moved.
9. Emsting and strmmtding zoning should be shown either on the vicinity map, the context diagram, or the overall
site Platt_
Reply: Surrounding land is in the County. If you still treed this information, please contact the Owner.
10. A pedestrian connection between the west parking lot and the City Park maybe appropriate.
Reply: Good Ideal Added.
11. We recommend that you meet the City`s fill tree stocking standards adjacent to the building; however, we
understand the special use and traffic that a school building receives adjacent to the building. The standard reads
as follows: "All landscaped areas within SO feet of any building must provide formal and/or informal
groupings of trees at 30 to 40 foot Intervals for canopy shade trees, and 20 to 30 feet for evergreens and
ornamentals (3.2.100)(c)]. More shadelcanopy Irm oa the south side of the building would be consistent
with the School District's desire to reduce the heat oasis ,round the building.
Reply: We are providing far more trees than has ever been provided at any previous ekmnm=yy school in Fort
Collitts. Trees and vegetation have been carefully placed to reduce the building's lust gain in the
summer. However, consideration has been made to not placing plants where they will be damaged by
the heavy usage of this facility.
12. The materials to be used for the trash enclosure are not indicated. Please be advised that the City would not
typically allow chain link fencing with or without slats as a screening material as specified in section 3.8.11(2)
of the LUC.
Reply: See details on sheet 1.1. The enclosure is covered with T=%. a recycled plastic and wood fiber lumber.
13. Please show the utility elements and the proposed screening for such elements on the p13ns, We ask that all
HVAC and utility equipment meet the following standard of the LUC: Section 3.5.1(1) (2)&(3) Utility meters,
HVAC cquiprtunt, vaults, irrig umbons, transformers, and other utility service ftmctions (such as conduits,
and vents) shall be located and screened so that the visual and acoustic impacts of these Mons are fully
contained and out of view of the adjacent properties and public srreets• Please specify the material of any utility
screening.
Reply: Please see Civil Drawings and their written response. Building equipment is not visible from Kechter
Road. Ground equipment (chiller, generator, etc.) is in a -vinyl-coated f ced in area on the south side
of the building.
14. Please indicato the type of ligktting source. The LUC lists incandescent and high-pressure sodium light sources
with low contrast and brightness as acceptable light sources. Current Planning would like to see the fixtures
specified as high-pressure sodium.
Reply: Please see E3.1. (These have been reviewed by Gary Schroeder, as well.)
Vyou have any further comments or questions, please do not hesitate to contact RS+B Architects, Inc.
Thank you.
Sincerely,
r,
Car a , AI
Project test
Page 2 of 2
MAY 02 '01 03:20PM RBB
RBB ArChlte. Ine. • 915 East Mountain • Suite 100 • Foe CQHtns. CO a05 13 • (e70) 4OW17 • Fax (970)
P.4
Arenitacture
Planning
Interior Design
April 3.2001
Mr. Brian Grubb, AICP
City Planner
City of Fort Collins
281 North College Avenue
Fort Collins. Colorado 80322
Re: Poudre School District
2002 Elementary School
rM."TWITEM
Planning Staff has reviewed the plans and we offer the following comments:
1. Please provide a vicinity map for the plan set Several other review agencies and I bad difficulty locating the site
based upon the limited information presented.
Reply: Provided on Cover Sheet.
A lighting Plan in coaformanCe with City standards would be helpful to evaluate the impacts of the patting lot
and site lighting upon adjacent properties -
Reply: Lighting plan was submitted Another is included herein.
3. 5treet trees are typically regttircd along all public streets between the curb and a detached sidewalk at intervals
of 30.40 feet. Please see section 3.2.1 (D)(2) of the City's Land Use Code- Willow Brook
Reply: Street trees will be a part of the Kechter Road improvez ►t package, submitted by
4. Sheet 1.1 shows a heavy dashed line along the west side of the access road. What is this line? Is it the section
or quarter -section line?
Reply: Lmc has been removed.
5. What happens to the sidewalk connection to the northeast when the modular units are installed.
Reply: Modulus have been relocaud.
6. Staff cannot assist You with comments on the adequacy of parking bed there is no itlform an regarding the
number of seats in the audi onumlUmnasiom and no information regarding the pmjected mmnber of employees.
Based upon the overall square footage only, it appears that parking is adequate.
Reply: There is no auditorium. Gymnasium has no built-in seating. Owner has accepted the number of
parking stalls shown.
I The plat+ lacks dimensions. The parking spaces, handicapped parking, drive aisles, sidewalks, and sidewalk
separation should be dimensioned. Please provide other dimensions as reasonable.
Reply: Stalls and drives have been dimensioned. Other dimensions are indicated on the Civil drawings.
Page 1 of 2
MAY 02 '01 03:20PM RBB
P.3
TRANSMITTAL
PROJECT NAME: 2002 Elementary
PROJECT NUMBER: 00-12
DATE: April 4, 2001
TO: Current Planning
City of Fort Collins
ATTENTION: Brian Grubb
WE ARE SENDING YOU:
x Prints Shop Drawings
Specifications Electronic Media
Original X Other
FOR:
Approval x Review and Your Use
Comment
RB+B
Architecture, Planning, Interior Design
315 E. Mountain Avenue Suite 100
Ft. Collins, Colorado 80624.2913
970 4W117 FAX 970 484.0264
EMAIL: rbbinc@rbbarchitiicts.com
FAX Pages
x As Corrections
Requested
12
03-02-01
Cover Sheet
12
Slte Plan
10 12
Site Lighting Plan
10
Civil Drawings; Utility Plans
3
Elevations
13
Landscape Plan
1
2I 2001
Drainage Report
2
03-03-01
Planning Response
2
03-03-01
Civil Responses
2
Transportation Planning Response
1
3 letters of compliance with various codes
1
Misc Drawings marked by the City
REMARKS/MESSAGE:
Please review, prepare, and forward to the Planning and Zoning Board for their earliest
approval.
Thank you.
SIGNED: Corky Bradley, A-I.A.
COPY TO: File
Poudre School District
MAY 02 101 03:19PM RHH P.2
Mr. Brian Grubb, AICP
May 2, 2001
page 2
5. Adequate mature: The Distver has committedto providing ftuis for road impruvemcnIs as required. The
Owner is rcquirod to comply with State and local Fire Authority's requirements for conetrnmon water and for
occupaaxy and will do so at all times. We bavc already met with Poudre Fire Authority regarding having water
available at the appropriate time for consmrction.
Other Departments/AgcrrcaeS:
• Fort Collins - Loveland Water District: Back•Flow-Prmention-Device will be provided.
• Excel (XCel?) Energy - No Comments
park Planning - No Comments
5 Comments by an unknown deparmtent:
1. Sidewalks havc been adjusted, and are shown on the Sits Plan delivered to you office last woek.
2. Pedestrian signal is also noted on said plan.
3. Future Trail is also noted on said plan.
4. Cross walk aligned to cast side of Cinquefoil lane, as noted on said plan.
S. Future Trail is also noted on said plant.
Faaneeairg 7omng, Natural Does, and Stotmwater d�arnna>rs' m will be addressed in the near
future.
If you have any Rather comments or questions, please do not hesitate to Contact RBtB Architects, Inc.
Thank you.
sincerely,
corky' >
Project Architect
attachments: Transmittal of April 4, 2001
Response Jew of April 3, 2001
Letter from Shaffer Beacom of May 1, 2001
Page 2 of 2
MY 02 '01 P3:19PM RBB
P.1
N b Arc,... acts, Inc. • 315 &t Mountain - 8uit8 ioo • Fort Couine 00*-A*4.24b 40Ij 464a1t 7 • Fax (M) 4e4-0264
Architecture
PlanrOg
Interior Design
R8 B
May 2, 2001
Mr. Brian Gebb, AICP NFax: 416•620
City Plaaw 6 pages
City of Porttolins
an North Cotlego Awe
Fort Collin, Colorado $0522
Re: PbudiAchool District
2002 Etctiwzy School
Subject• AtdvisW Review, td Issue dated ApriN27, ION
Qtymgart Co litis P Hitt �41a, U+B &ekit ds- hr4 rzwg&&
1. Lighting 4rrpu did am Weive thtc�ies of 41u situ �i�gbtiq 1i aye the sent with the.last
submitta�wlidte&appy"rovide additional copies.
hhave � d ha m% my licenseaelecttical2u r � a letter (att stating that$is d
meets; Q#,Sts . Fudbeemorc, Gary SdAed& has bee pmddng with ow Team far
months and has aet� our site lighQ and SSitltfbs. 4 you I0 additiondl guesfl* you z%ght*%w to
oo=ctfiim-
2. Street 'Nees: Tifa reply Vi gave you ffidhe la set Of ComMtte is 4dt Vac:'
"reply: =W will ba*= of the Aditer Road imp4dO4�pbht pa A*mi WiU9w Brook"
If you are that these wtll,£ gaily show up,�"19 the peratitdo the' work
on t bem9fart of the package.
3. Di f n oration an d, tmdittg Aglacie t lWaS cctte4mmon e' vicinity map. Sl�ndmg pte�r�rty
is mogtly%4rt a County. `$$op djacent to the west is, of wars¢ Park.
ca' Laodscape islands: We appreciate }boapoommatt about DBduGag tltc heat etas, however we think that we island
on each aide woq't films = 44 dit c We have gone to great lengths to reduce the amount of paving
on thistite,�s � ptvv�trtg gWt4 large landIscaputg areas (including abtoswale) on the east and west sides
of this Wddgg lot- if sU w;1l witlohe bib ws wM be using tho Gravelf'ave throughout the north parking
41 kvhtch)vill fi r her reduce ftheaGgain,