Loading...
HomeMy WebLinkAboutHARRIS BILINGUAL ELEM. SCHOOL EXPANSION - SITE PLAN ADVISORY REVIEW - 6-01 - CORRESPONDENCE - (3)r 8. Please indicate how the service drive drains. In order to resolve drainage issues, please contact Basil Hamdan, Stormwater Utility, 221-6681. 9. After checking with Engineering, the service drive may be shifted to the south to provide greater separation from the existing street tree. Be sure to stay five feet off the property line. This concludes Staff comments at this time. The project is scheduled for the March 15, 2001 Planning and Zoning Board public hearing. Please note the following for this hearing: One set of 81/2 x 11 reductions of the site, landscape and architectural plans are due on Monday, February 261h Ten sets, folded, 24 x 36, of the site, landscape, and architectural plans are due on Monday, February 5th Digital images for a power point presentation are due Monday, February 5th. Please contact Ginger Dodge, 221-6750, if you have formatting questions. The Planning and Zoning Board worksession will be on Friday, March 9th noon until 3:00 p.m. Please note that we are scheduling this item for the consent agenda. If you have any questions, please feel free to call our office at 221-6750. Sincerely: Ted Shepard Chief Planner Commv ''-y Planning and Environmental ' vices Current Panning City of Fort Collins February 15, 2001 Ms. Rebecca Spears RB+B Architects, Inc. 315 East Mountain Avenue Fort Collins, CO 80524 Dear Rebecca: Staff has reviewed the request for Harris Bilingual Elementary School Expansion, Site Plan Advisory Review and offers the following comments: If any of the public sidewalks along the four streets are in disrepair or missing, they should be fully repaired or constructed, whatever the case may be. 2. Any cutting of a street will require a Street Cut Permit from Engineering. There is a sliding scale fee based on the condition of the pavement. Please contact Rick Richter, 221-6605, in the Engineering Department for further information regarding the permit and fee for this work in the public right-of-way. 3. Staff is concerned about any new construction encroaching into any existing easements. Please provide documentation indicating that there will be no such encroachments. 4. There are parents who pick-up/drop-off on Elizabeth Street. Has any consideration been given to constructing stairs in the middle of the block connecting the sidewalk to the north entrance? 5. Similarly, there are parents who drop off on Garfield. Will there be a no parking zone on the street to facilitate this pick-up/drop-off activity? 6. There will be an increase in imperviousness. This will require a variance from the Stormwater Utility which will be approved. There is a concern about the dry well. The use of a dry well is not preferred. Rather, storm flows should be routed south to Garfield. 7. The Drainage Report should address Erosion Control Criteria. 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020