Loading...
HomeMy WebLinkAboutHARRIS BILINGUAL ELEM. SCHOOL EXPANSION - SITE PLAN ADVISORY REVIEW - 6-01 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT11 1 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location This site is located in the southeast portion of Old Town Fort Collins. The school site encompasses nearly the entire block bounded by E. Elizabeth Street on the north, Smith ' Street on the east, Garfield Street on the south and Whedbee Street on the west. A small gas station exists on the southwest corner of this block. See the location map in Appendix A. ' 1.2 Description of Property The entire school site consists of approximately 3.06 acres of land. The site has 1 buildings and pavement currently existing and the site slopes from the center (existing school) to the existing streets on all sides. The slopes on each side vary from 2.8% on the east where the playground was recently reconstructed to 20% on the north which is covered in grasses and street trees. The project will consist of a removing two existing buildings and expanding the existing building to the west. Additional walks will service the new expansion and the existing ' parking lot on the south will be reconstructed. 1 2. DRAINAGE BASINS AND,SUB-BASINS 2.1 Major Basin Description 1 The proposed development lies within the Spring Creek Drainage Basin. ' 2.2 Sub -basin Description Flow from this site will enter the streets on all four sides. Runoff in Smith Street will flow north to Elizabeth and west to existing inlets at the intersection of Elizabeth and Whedbee. Runoff in Garfield Street will flow west to Whedbee and north to the same inlets. This storm system will convey the runoff north. .1 1 TABLE OF CONTENTS TABLEOF CONTENTS............................................................................................................... iu 1. GENERAL LOCATION AND DESCRIPTION ' 1.1 Location...................................................................................................................1 1.2 Description of Property ............................................................................................ I 1 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................I 3. 2.2 Sub -Basin Description.............................................................................................1 DRAINAGE DESIGN CRITERIA ' 3.1 Regulations..............................................................................................................2 3.2 Development Criteria Reference and Constraints...................................................2 3.3 Hydrologic Criteria..................................................................................................3 ' 3.4 Hydraulic Criteria....................................................................................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept......................................................................................................3 ' 4.2 Specific Flow Routing.............................................................................................3 4.3 Drainage Summary ..................................................................................................4 4.4 Variance Requests....................................................................................................4 5. EROSION CONTROL 5.1 General Concept......................................................................................................5 6. CONCLUSIONS ' 6.1 Compliance with Standards....................................................................................5 6.2 Drainage Concept....................................................................................................5 7. 6.3 Water Quality and Erosion Control Concept...........................................................6 REFERENCES....................................................................................................................6 APPENDICES A Vicinity Map B Hydrologic Computations & Erosion Control C Figures and Tables .1 1 1% North Star 1-I aft, design _ ' January 17, 2001 ' Basil Hamdan City of Fort Collins Stormwater 700 Wood Street 1 Fort Collins, CO 80522-0580 RE: Final Drainage Report for Harris Bilingual Elementary School Expansion Dear Basil, I am pleased to submit for your review and approval, this Final Drainage Report for Harris Bilingual Elementary School Expansion. I certify that this report for the drainage design of Laurel Street Apartments was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Since Patricia Kroetch, P North Star Design, Inc. ii 1194 W. Ash Street, Suite B Windsor, Colorado 80550 970-686-6939 Phone . 970.686-1188 Fax FINAL DRAINAGE AND EROSION CONTROL REPORT HARRIS BILINGUAL ELEMENTARY SCHOOL EXPANSION Prepared for: RB+B Architects 315 E. Mountain Ave, Suite 100 Fort Collins, CO 80524 Prepared by: North Star Design, Inc. 1194 W. Ash Street, Suite B Windsor, Colorado 80550 (970)686-6939 January 17, 2001 Job Number 138-03 t ' APPENDIX C ' FIGURES AND TABLES L 1 I C 11 Cost Est EROSION CONTROL COST ESTIMATE Project: HARRIS ELEMENTARY Prepared by: PPK ITEM IQUANTITY JUNIT COST/UNIT TOTAL COST Silt Fence 635 LF $3 $1,905 Straw Bale Barrier 0 EA $150 $0 Gravel Inlet Filter 0 EA $150 $0 Construction Entrance 0 EA $550 $0 Subtotal Contingency (50%) Total $1,905 $953 $2,858 CITY RESEEDING COST Reseed/Mulch 3.06 ACRE $615 $1,882 Subtotal Contingency (50%) Total $1,882 $941 $2,823 EROSION CONTROL ESCROW AMOUNT $2,858 Page 1 North Star Design, Inc 1194 W. Ash St. Suite B Windsor, CO 80550 LOCATION: Harris Elementary School ITEM: Water Quality Pond Sizing COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design, Inc From Urban Strom Drainage Criterial Manual, March 1969 (Referenced figures are attached at the end of this section) Use 40-hour brim -full volume drain time for extended detention basin Water Quality Capture Volume = WQCV = (required storage/12)'(tributary drainage area) MAJOR BASIN Trib. area (ac) %Imperv. Req. Storage (in. of runoff) from Fig. 5-1 WQCV (ac-ft) Dwo 00 req. area/row (in 2/row) from Fig. 5-3 EX 3.06 34.0 0.15 0.038 PRO 3.06 36.0 0.16 0.041 1 /16/01 WQVOL.xIs North Star Design, Inc. 1194 W. Ash St., Suite B Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (NEW IDF CURVE) (100-YEAR) LOCATION: Harris Elementary School PROJECT NO: 138-02 COMPUTATIONS BY: ppk DATE: 1/16/01 100-yr storm, Cir = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C Cf tc (min) 1 (new) (in/hr) 0 (100) (cfs) from Design Point 0 (100) (cfs) all00)tot (ds) 1 EX1 0.74 0.49 5.0 9.95 3.57 3.57 2 EX2 0.95 0.50 11.2 7.37 1 3.51 1 3.51 3 EX3 1.07 0.62 5.0 9.95 6.65 6.65 4 EX4 0.29 0.57 5.0 9.95 1.67 1.67 15.40 Total - 1 PRO1 0.74 0.57 5.0 9.95 4.22 4.22 2 PR02 0.95 0.50 11.2 7.37 3.51 3.51 3 PR03 1.07 0.57 5.5 9.63 5.95 5.95 4 PRO4 0.29 0.79 5.0 9.95 2.32 2.32 16.00 Total Q=CiA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve I = 75 / (10+ tcf" A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) FlowAs 0100 North Star Design, Inc. 1194 W. Ash St., Suite B Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (NEW IDF CURVE) (10-YEAR) LOCATION: Hams Elementary School PROJECT NO: 138-02 COMPUTATIONS BY: ppk DATE: 1/16/01 10-yr storm. Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C Cf tc (min) i (new) (in/hr) Q (10) (cfs) from Design Point Q (10) (cfs) Q(10)tot (cfs) 1 EX1 0.74 0.39 5.4 4.75 1.36 1.36 2 EX2 0.95 0.40 11.2 3.60 1 1.37 1 1.37 3 EX3 1.07 0.50 6.4 4.46 2.38 2.38 4 EX4 0.29 0.46 5.2 4.81 0.65 0.65 5.77 Total 1 PR01 0.74 0.46 5.0 4.87 1.65 1 1.65 2 PR02 0.95 1 0.40 11.2 3.60 1.37 1.37 3 PR03 1.07 0.46 6.8 4.36 2.15 2.15 4 PRO4 0.29 0.63 5.0 4.87 0.91 0.91 6.09 Total Q=CtCiA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from OF curve I = 46.7 / (10+ tc)01B' A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow.xls Q10 North Star Design, Inc. 1194 W. Ash St., Suite B Windsor, CO 80550 STANDARD FORM SF-2 TIME OF CONCENTRATION -100 YR LOCATION: Hams Elementary School PROJECT NO: 138-02 COMPUTATIONS BY: ppk DATE: 1/16/01 100-yr storm Cf = 1.25 SUB43MIN DATA INITIAL /OVERLAND TIME (tl) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL to REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope (%) (5) ti (min) (6) Length 00 (7) Slope (%) (8) n Manning rough. Val. (f 1s) (9) n (min) (10) tc = It + It (11) Total L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) 1 EX1 0.74 0.39 0.49 132 20.0 4.7 0 1.00 0.016 2.0 0.00 4.7 132 10.7 5.0 2 EX2 0.95 0.40 0.50 220 2.8 11.4 0 1.00 0.016 2.0 0.00 11.4 220 11.2 11.2 3 EX3 1.07 0.50 0.62 85 3.9 5.0 0 1.00 0.016 2.0 0.00 5.0 85 10.5 5.0 4 EX4 0.29 0.46 0.57 135 17.0 4.3 0 1.00 0.016 2.0 0.00 4.3 135 10.8 5.0 1 PROI 0.74 0.46 0.57 132 20.0 4.0 0 1.00 0.016 2.0 0.00 4.0 132 10.7 5.0 2 PRO2 0.95 0.40 0.50 220 2.8 11.4 0 1.00 0.016 2.0 0.00 11.4 220 11.2 11.2 3 PR03 1.07 0.46 0.57 85 3.9 5.5 0 1.00 0.016 2.0 0.00 5.5 85 10.5 5.5 4 PRO4 1 0.291 0.631 0.791 135 17.0 2.5 01 1.001 0.0161 2.01 0.001 2.5 135 10.8 5.0 EQUATIONS: tC=ti+tt ti=[1.87(1.1-CCr)Lo.5]/S1r.1 tt = lNel. Velocity from Manning's Eqquation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + it and urbanized basin check min. tc = 5 min. due to limits of IDF curves FlowAs TOC-100 North Star Design, Inc. 1194 W. Ash St., Suite B Windsor. CO 80550 STANDARD FORM SF-2 TIME OF CONCENTRATION -10 YEAR LOCATION: Hams Elementary School PROJECT NO: 138-02 COMPUTATIONS BY: ppk DATE: 1/16/01 10-yr storm C/ = 1.00 SUB -BASIN DATA INITIAL /OVERLAND TIME (U) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN(s} 0) Area (ac) (2) C (3) Length (6) (4) Slope (%) (5) ti (min) (6) Length (it) (7) Slope (%) (8) n Manning rough. Vel. (11/s) (9) it (min) (10) tc = ti + 8 (11) Total L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) 1 EX1 0.74 0.39 132 20.0 5.4 0 1.00 0.016 2.0 0.00 5.4 132 10.7 5.4 2 EX2 0.951 0.40 220 2.8 13.3 0 1.00 0.016 2.0 0.00 13.31 220 11.2 11.2 3 EX3 1.071 0.50 85 3.9 6.4 0 1.00 0.016 2.01 0.00 6.4 85 10.5 6.4 4 EX4 0.29 0.46 135 17.0 5.2 0 1.00 0.016 2.0 0.00 5.2 135 10.8 5.2 1 PRO1 0.74 0.46 132 20.0 4.9 0 1.00 0.016 2.0 0.00 4.9 132 10.7 5.0 2 PRO2 0.95 0.40 220 2.8 13.3 0 1.00 0.016 2.0 0.00 13.3 220 11.2 11.2 3 PR03 1.07 0.46 851 3.9 6.8 0 1.00 0.016 2.0 0.00 6.8 85 10.5 6.8 4 PR04 1 0.291 0.6. 135 17.0 3.81 01 1.001 0.0161 2.01 0,00 3.8 135 10.8 5.0 EQUATIONS: tc=ti+III 6 [1.87(1.1-CCr)L0.5)/S113 tt = L/Vel. Velocity from Manning's Eqquation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of OF curves FlowAs TOC-10 North Star Design, Inc. 1194 W. Ash St., Suite B Windsor, CO 80550 RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Hams Elementary School PROJECT NO: 138-02 COMPUTATIONS BY: ppk DATE: 1/16/01 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks (concrete) Roofs Gravel Lawns (flat 2-7%, sandy soil) ` Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.50 40 0.15 0 SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sQ-ft) SIDEWALK AREA (sq.ft) GRAVEL AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious EX1 0.74 32,182 5,320 0 4.263 0 22.599 0.39 28 EX2 0.95 41.504 3,256 0 9,707 0 28,541 0.40 30 EX3 1.07 46,780 3,680 12,541 4,110 0 26,449 0.50 42 EX4 0.29 12,823 3.639 0 1,286 0 7,898 0.46 35 EX Total 3.06 133.289 15,895 12,541 0 85,487 0.44 34 PR01 0.74 32,182 9,194 0 d3,248 0 19.740 0.46 35 PRO2 0.95 41,504 3,256 0 0 28,541 0.40 30 PR03 1.07 46,780 7,582 3.048 3,908 26,459 0.46 3PRO4 0.29 12,823 6,661 0 0 5,068 0.63 55 PRO Total 3.06 133,289 26.693 3,048 19,832 3,908 79.808 0.46 36 Eauations - Calculated C coefficients & %, Impervious are area weighted C=E(Ci Ai) /At Ci = runoff coefficient for specific area, At Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Flow.xls C"I I APPENDIX B ' HYDROLOGIC COMPUTATIONS EROSION CONTROL 11 .1 ULBERRY STREE -TT FT W O ELIZABETH STREET LAURE 57RE Q I W v y C� SITE I VICINITY MAP NOT TO SCALE I APPENDIX A ' VICINITY MAP [1 1 1 1 1 1 i 1 i 1 .1 1 6.3 Erosion Control Concept Since the site is less than 5.0 acres, a NPDES permit is not required. During construction, erosion control shall be maintained to minimize erosion on this site and transport of silt downstream. 7. REFERENCES 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. Z :11 6. EROSION CONTROL 5.1 General Concept This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins Zone Maps. The potential exists for silt movement from the site and into the existing storm system during construction. Silt fence is being utilized to minimize this potential during construction. This project is an infill project and construction will utilize the majority of the site. Because of this, most Best Management Practices (BMP's) are not effective and therefore very few erosion control measures are being proposed. Most of the construction traffic (concrete trucks, etc) will utilize the existing parking lot which is proposed to remain until the majority of the building is constructed thus minimizing the possibility of mud tracking. Silt fence is utilized around the areas of disturbance to minimize wind and stormwater erosion. Watering of disturbed areas is being proposed to also minimize the wind erosion. The erosion control escrow amount is $2858. CONCLUSIONS 6.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for the detention and transmission of developed on -site runoff to the existing streets and into the existing storm system. The impact of the development of this site on existing downstream facilities is very minor and therefore on site detention is not being proposed. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. W Subbasin 3 contains the south quarter of the site including a smallportion of the proposed ' building expansion, the existing parking lot and the proposed main entry walks. Runoff from this basin flows south to Garfield Street. Flows then continue west and into Subbasin 4. Subbasin 4 contains the west quarter of the site including the west half of the proposed building expansion and the delivery entrance. Runoff from this basin flows west to Whedbee Street. Flows then combine with runoff from Subbasin 3 and continue north to ' the existing inlet at the intersection of Elizabeth and Whedbee. 4.3 Drainage Summary ' The storm conveyance system is a surface system and has been designed for minimum ' maintenance. The City of Fort Collins will be responsible for maintenance of the existing adjacent streets utilized as drainage conveyance. The drainage facilities located on this site will be maintained by the owners of the site. 1 4.4 Variance Requests ' A variance is being requested to forgo the detention requirement for this site due to the ' increase rainfall criteria adopted by the City of Fort Collins in 1999. The amount of increase to the runoff for this site (from the existing condition to the developed condition) is approximately 0.60 cfs in the 100 year storm and when viewed in the context of the ' overall basin, this increase is very minor. ' A variance is also being requested for the requirement to provide water quality in the form of extended detention. With the development of the expansion several measures are ' being proposed to minimize the impervious areas on site. Grass pavers are proposed (instead of concrete) on each side of the walks on the south and west sides of the 1 building. Gravel pavers are proposed in the parking bays of the reconstructed parking lot. On the all sides of the building, the roof drain discharge will flow across grassed areas before reaching the streets. This will allow sediment to be removed from the runoff prior to reaching the streets. 1 4 I minor impact on downstream conveyances. ' 3.3 Hydrologic Criteria Runoff computations were prepared for the 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub - basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub - basins and Design Points associated with this site. ' 3.4 Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria and are also included in Appendix C of this report. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept Because the site sits on top of a hill, the runoff from this site flows in all four directions. Flow will be directed to the existing streets on all sides of the site. 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Subbasin 1 contains the north quarter of the site including a portion of the proposed building expansion and runoff from this basin flows north to Elizabeth Street. Flows then continue west and into the existing inlet at the intersection of Elizabeth and Whedbee. 1 Subbasin 2 contains the east quarter of the site including the existing playground. This basin will remain unaltered by the expansion. Runoff from Subbasin 2 flows to Smith street on the east boundary of the site. The flow is combined with runoff from Subbasin 1 and flows to the existing inlet. 3 i 1 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual' specifications. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints 1 The runoff from this site has been routed to conform to existing site constraints. Since all of the adjacent streets surrounding the site and the main building on the site are already constructed, there is very little room for variances from existing site conditions. i The streets and associated drainage systems surrounding the site exist. The nearest storm ' system is at the intersection of E. Elizabeth Street and Whedbee Street at the northwest corner of this site. The existing school sits on top of a hill in the center of the site. No offsite flows will enter this site. The expansion proposed for this site is approximately 13,500 square feet. Some of this ' building will replace existing impervious area (two buildings, paved area and walks) but there would still be a large increase in impervious area on this site. In order to offset the impervious area created by this expansion several alternative pavements are being proposed. In some of the walkways, grass pavers are proposed to reduce the potential concrete area. In the parking lot, the stall areas are proposed to be gravel pavers to reduce the existing asphalt area. In the service area on the south side of the expansion, gravel will be utilized rather than concrete. These techniques minimize the potential impact of the expansion and reduce the potential runoff from the site. No detention is proposed for this site. The existing site (based on the rainfall criteria adopted by the City of Fort Collins on March 26, 1999) generates approximately 5.77 cfs runoff in the 10 year storm and 15.60 cfs in the 100 year storm event. The site as it is proposed will generate approximately 6.09 cfs in the 10 year event and 16.00 cfs in the 100 year event. Because of the innovative techniques utilized on this site to reduce impervious areas, the additional runoff in the 100 year event is only 0.4 cfs. This increase, when viewed on a basin wide level, is very insignificant and will have a very 2