Loading...
HomeMy WebLinkAboutSWALLOW OFFICE BUILDING - PDP - 45-00 - CORRESPONDENCE - CORRESPONDENCE-HEARING (3)I regret I am unable to be at the hearing this afternoon because I need to drop my son off at camp in Estes Park at 4:00 p.m. today. Vicki Diehl from my office and Dave Klockeman from J.R. Engineering will be the project's representatives at the hearing in my absence. I very much appreciate your assistance in moving this project forward expeditiously, notwithstanding the various problems. Sincerely, Jon Prouty JP/vd cc: Ted Shepard July 18, 2001 Cameron Gloss, Hearing Officer City of Fort Collins, Current Planning Department 281 N. College Avenue Fort Collins, CO 80524 Re: Swallow Office Building Project Dear Cameron: I wish to acknowledge two errors I made in preparing submittals for this hearing. 1. Note #12, which appears both on the site plan and the utility plans, was not corrected to the revised note language, which was suggested and we have approved, as follows: "Future potential vehicular, bicycle and pedestrian access to be provided to the abutting property owner to the west. These accesses are secured by dedicated access easements granted to the City of Fort Collins. Such accesses shall be considered secondary as primary vehicular, bicycle and pedestrian access to the abutting property shall be gained via adjacent public streets and sidewalks. The necessary improvements to construct such access, including all earth work; utilities work; curb; gutter; asphalt; concrete; landscaping and irrigation repair; replacement and enhancement; and all other costs shall be negotiated between the abutting developer and the Office Owner or Office Owners' Association at such time in the future as the abutting property seeks Final Plan Approval for redevelopment." Accordingly, please make project approval conditional upon the correction of this note language. 2. Due to my failure in communication with J.R. Engineering, the engineering redlines were not responded to. Accordingly, please make project approval conditional upon J.R. Engineering's modification of the utility plans to reflect the several small changes requested by the City. 3950 JFK Parkway, Bldg 12, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125