Loading...
HomeMy WebLinkAboutSWALLOW OFFICE BUILDING - PDP - 45-00 - CORRESPONDENCE - (11)July 16, 2001 Ms. Katie Moore Mr. Ted Shepard City of Fort Collins 281 North College Avenue P.O. Box 580 Fort Collins, Colorado 80522 J-R ENGINEERING A Subsidiary of Wesrrian Re: Swallow and Remington Office Building — Utility Plans and Redlines Dear Katie and Ted: At your request, JR Engineering (JR) has transmitted the redline plans from the previous submittal on the above referenced project. It is our understanding that these plans have been requested due to the re -submittal of the project for review. As I discussed with Katie, JR was not aware of the re -submittal and the plans received by the City are exactly the same as the previous submittal. It is our desire to work with our client and the City to complete this project through the normal processes. If you have any questions or comments, or need additional information, please do not hesitate to contact me at my office. Thank you. Sincerely, VV - Davi Pockeman, PE Division Manager 2620 East Prosper Road, Suite 19o, Forr Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • wJrcnginmring.com