HomeMy WebLinkAboutSWALLOW OFFICE BUILDING - PDP - 45-00 - CORRESPONDENCE - (11)July 16, 2001
Ms. Katie Moore
Mr. Ted Shepard
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Colorado 80522
J-R ENGINEERING
A Subsidiary of Wesrrian
Re: Swallow and Remington Office Building — Utility Plans and Redlines
Dear Katie and Ted:
At your request, JR Engineering (JR) has transmitted the redline plans from the previous
submittal on the above referenced project. It is our understanding that these plans have been
requested due to the re -submittal of the project for review. As I discussed with Katie, JR was not
aware of the re -submittal and the plans received by the City are exactly the same as the previous
submittal.
It is our desire to work with our client and the City to complete this project through the normal
processes. If you have any questions or comments, or need additional information, please do not
hesitate to contact me at my office. Thank you.
Sincerely,
VV -
Davi Pockeman, PE
Division Manager
2620 East Prosper Road, Suite 19o, Forr Collins, CO 80525
970-491-9888 • Fax: 970-491-9984 • wJrcnginmring.com