HomeMy WebLinkAboutVERIZON WIRELESS, 3003 E. HARMONY RD. - PDP/FDP - FDP150014 - REPORTS - PLANNING OBJECTIVESfacility or equipment and other appropriate graphics to demonstrate the visual impact on the view
of the city's foothills and hogbacks.
• FTC Peloton Proposal: Foothills or Hogbacks are not an issue for this site.
(13) Airports and Flight Paths. Wireless telecommunication facilities and equipment located
near airports and flight paths shall obtain the necessary approvals from the Federal Aviation
Administration.
• FTC Peloton Proposal: The proposed wireless telecommunication equipment is not
located near an airport or flight path.
(14) Historic Sites and Structures. Wireless telecommunication facilities and equipment shall not
be located on any historic site or structure unless permission is first obtained from the city's
Landmark Preservation Commission as required by Chapter 14 of the City Code.
• FTC Peloton Proposal: The subject property is not an historic site or structure.
(15). Stealth Technology: To the extent reasonably feasible, the applicant shall employ "stealth
technology" so as to convert the wireless telecommunication into wireless telecommunication
equipment, as the best method by which to mitigate and/or camouflage visual impacts. Stealth
technology consists of, but is not limited to, the use of grain bins, silos, or elevators, church
:steeples, water towers, clock towers, bell towers, false penthouses or other similar "mimic"
structures. Such "mimic" structures shall have a contextual relationship to the adjacent area.
• FTC Peloton Proposal: The proposed facility is designed to minimize any change to
the appearance of the existing office building. Antennas mounted on the exterior
walls will match the color and texture of the existing building faVade. Electronic
equipment associated with the antennas will be placed in the building basement,
eliminating the need for rooftop accessory structures and further minimizing the
impact of the site on the building appearance.
5
I
(5) Fencing. Chain link fencing shall be unacceptable to screen facilities. Fencing material shall
consist of wood, masonry, stucco or other acceptable materials and be opaque. Fencing shall not
exceed six (6) feet in height.
• FTC Peloton Proposal: No fencing is proposed.
(6) Berming. Berms shall be considered as an acceptable screening device. Berms shall feature
slopes that allow mowing, irrigation and maintenance.
• FTC Peloton Proposal: No berming is proposed.
(7) Irrigation. Landscaping and berming shall be equipped with automatic irrigation systems
meeting the water conservation standards of the city.
FTC Peloton Proposal: No landscaping or berming is proposed; hence, no irrigation
is required.
(8) Color. All wireless telecommunication facilities and equipment shall be painted to match as
closely as possible the color and texture of the wall, building or surrounding built environment.
Muted colors, earth tones and subdued colors shall be used.
• FTC Peloton Proposal: The proposed antennas will be painted to match as closely
as possible the color and texture of the existing walls on which they are mounted.
The existing walls are muted earth tones as shown on the photosimulations.
(9) Lighting. The light source for security lighting shall be high pressure sodium and feature
down -directional, sharp cut-off luminaries so that there is no spillage of illumination off -site.
Light fixtures, whether freestanding or tower -mounted, shall not exceed twenty-two (22) feet in
height.
• FTC Peloton Proposal: No exterior lighting is proposed.
(10) Interference. Wireless telecommunication facilities and equipment shall operate in such a
manner so as not to cause interference with other electronics such as radios, televisions or
computers.
• FTC Peloton Proposal: The Verizon Wireless telecommunications site will pose no
interference issues with other electronic devices.
(I 1) Access Roadways. Access roads must be capable of supporting all of the emergency
response equipment of the Poudre Fire Authority.
• FTC Peloton Proposal: No new access roads are proposed at this site. The existing
access and parking lots will be undisturbed.
(12) Foothills and Hogbacks. Wireless telecommunication facilities and equipment located in or
near the foothills bear a special responsibility for mitigating visual disruption. If such a location
is selected, the applicant shall provide computerized, three-dimensional, visual simulation of the
4
facility is an accessory use to an existing use, the facility shall be constructed out of materials
that are equal to or better than the materials of the principal use.
• FTC Peloton Proposal: The proposed telecommunication facility is consistent with
the architectural style of the existing office building. There will be no changes to the
architecture of the building..Fagade mounted antennas are designed to create the
least impact on the appearance of the building. No equipment or structures are
proposed for the roof.
(3) Wireless Telecommunication Equipment. Wireless telecommunication equipment shall be of
the same color as the building or structure to which or on which such equipment is mounted.
Whenever a wireless telecommunication antenna is attached to a building roof, the height of the
antenna shall not be more than fifteen (15) feet over the height of the building. All wireless
telecommunication equipment shall be located as far from the edge of the roof as possible. Even
if the building is constructed at or above the building height limitations contained in Section
3.8.17, the additional fifteen (15) feet is permissible.
Whenever wireless telecommunication equipment is mounted to the wall of a building or
structure, the equipment shall be mounted in a configuration as flush to the wall as technically
possible and shall not project above the wall on which it is mounted.
Roof- and ground -mounted wireless telecommunication equipment shall be .screened by parapet
walls or screen walls in a manner compatible with the building's design, color and material.
• FTC Peloton Proposal: The antennas will be mounted as flush to the exterior walls
as technically possible and will not project above the walls on which they are
mounted.
(4) Landscaping. Wireless telecommunication facilities and ground -mounted wireless
telecommunications equipment may need to be landscaped with landscaping materials that
exceed the levels established in Section 3.2.11 due to the unique nature of such facilities.
Landscaping may therefore be required to achieve a total screening effect at the base of such
facilities or equipment to screen the mechanical characteristics. A heavy emphasis on coniferous
plants for year-round screening may be required.
If a wireless telecommunication facility or ground -mounted wireless telecommunication
equipment has frontage on a public street, street trees shall be planted along the roadway in
accordance with the policies of the City Forester.
• FTC Peloton Proposal: All antennas at this site will be facade mounted. The only
ground mounted equipment at the site will be HVAC condenser units located among
existing landscaping at the side of the building.
3
columns to which they are mounted on the fagade. The following pages provide detail regarding
compliance with the City's zoning requirements for Wireless Telecommunication Sites.
LAND USE CODE SECTION 3.8.13
REQUIREMENTS FOR WIRELESS TELECOMMUNICATION
3.8.13 Wireless Telecommunication
(A) Location. Subject to the requirements of paragraph (B) of this Section, wireless
telecommunication equipment may be attached to or mounted on any existing building or
structure (or substantially similar replacement structure) located in any zone district of the city.
Wireless telecommunication equipment shall not, however, be permitted to be attached to or
mounted on any residential building containing four (4) or fewer dwelling units.
• FTC Peloton Proposal: The proposed design calls for antennas to be mounted on
the facade of existing building. This building does not contain any dwelling units.
As noted above, electronic equipment will be located in the building basement so
that no equipment or structures will be required on the rooftop.
(B) Co -location. No wireless telecommunication facility or equipment owner or lessee or
employee thereof shall act to exclude or attempt to exclude any other wireless
telecommunication provider from using the same building, structure or location. Wireless
telecommunication facility owners or lessees or employees thereof shall cooperate in good faith
to achieve co -location of wireless telecommunication . facilities and equipment - with other
wireless telecommunication providers.
• FTC Peloton Proposal: Verizon Wireless will not act to exclude or attempt to
exclude any other competitor from using the building for the location of other
antennas or telecommunication equipment.
(C) Standards.
(1) Setbacks. With respect to a wireless telecommunication facility that is a tower or a monopole,
the setback of the facility from the property lines shall be one (1) foot for every foot of height.
However, to the extent that it can be demonstrated that the structure will collapse rather than
topple, this requirement can be waived by the Director. In addition, the setbacks for ground -
mounted wireless telecommunication equipment shall be governed by the setback criteria
established in Articles 3 and/or 4.
• FTC Peloton Proposal: Not applicable as no tower is proposed.
(2) Wireless Telecommunication Facilities. Whether manned or unmanned, wireless
telecommunication facilities shall be consistent with the architectural style of the surrounding
architectural environment (planned or existing) considering exterior materials, roof form, scale,
mass, color, texture and character. Such facilities shall also be compatible with the surrounding
natural environment considering land forms, topography, and other natural features. If such
2
PLANNING OBJECTIVES
VERIZON WIRELESS
FTCPELOTON
DEVELOPMENT REVIEW FOR
WIRELESS COMMUNICATION SITE
PROJECT INFORMATION
Applicant Information: Verizon Wireless (VAW) LLC, d/b/a/ Verizon Wireless, 3131 South
Vaughn Way, Aurora, CO 80014
Representative: Irene Cooke, Leasing and Zoning Consultant, Closser Consulting LLC, P O
Box 423, Tabemash, CO 80478; (970) 531-0831
Land Owner Information: Flats at the Oval, LLC, c/o Brinkman Partners, Contact: David
Vorlage, Director of Real Estate, 3528 Precision Drive, Suite 100, Fort Collins, CO 80528;
(970) 237-3780
Engineering Firm Preparing Site Plan: Charles Steckly Architecture, Inc.; 5935 South Zang
Street, Suite 280, Littleton, CO 80127; (303) 932-9974
Address of Project: 3003 E. Harmony Road
PLANNING OBJECTIVES
Verizon Wireless proposes to develop a new telecommunications site, "Verizon Wireless FTC
Peloton," at 3003 E. Harmony Road, a large office building near the intersection at Ziegler Road
and Harmony Road. The purpose of this site is to provide improved 4G-LTE voice and data
capacity for Verizon Wireless customers in the commercial and residential developments
surrounding this intersection. The proposed site will be part of continuous telecommunications
network serving the greater Fort Collins area. Verizon Wireless has recently developed several
sites within the City of Fort Collins and approval of this application will allow Verizon Wireless
to meet its federally mandated obligations under the license granted by the Federal
Communications Commission (FCC) pursuant to the Telecommunications Act of 1996.
Although there is a Verizon Wireless site at the Poudre Valley Health District Campus at 2121 E.
Harmony Road, the explosive growth of data usage from "smartphones" and similar devices has
made it necessary to increase the data capacity with an additional facility. The proposed facility
will address the need for additional capacity to serve the Intel and Avago campuses in addition to
the commercial developments in the vicinity of the Harmony -Ziegler intersection.
The proposed site will include a total of six (6) panel antennas mounted to the facade of the
office building. Electronic equipment associated with the antennas will be placed in the building
basement, eliminating the need for rooftop accessory structures and further minimizing the
impact of the site on the building appearance. The antennas will be painted to match the existing