Loading...
HomeMy WebLinkAboutVERIZON WIRELESS, 3003 E. HARMONY RD. - PDP/FDP - FDP150014 - REPORTS - PLANNING OBJECTIVESfacility or equipment and other appropriate graphics to demonstrate the visual impact on the view of the city's foothills and hogbacks. • FTC Peloton Proposal: Foothills or Hogbacks are not an issue for this site. (13) Airports and Flight Paths. Wireless telecommunication facilities and equipment located near airports and flight paths shall obtain the necessary approvals from the Federal Aviation Administration. • FTC Peloton Proposal: The proposed wireless telecommunication equipment is not located near an airport or flight path. (14) Historic Sites and Structures. Wireless telecommunication facilities and equipment shall not be located on any historic site or structure unless permission is first obtained from the city's Landmark Preservation Commission as required by Chapter 14 of the City Code. • FTC Peloton Proposal: The subject property is not an historic site or structure. (15). Stealth Technology: To the extent reasonably feasible, the applicant shall employ "stealth technology" so as to convert the wireless telecommunication into wireless telecommunication equipment, as the best method by which to mitigate and/or camouflage visual impacts. Stealth technology consists of, but is not limited to, the use of grain bins, silos, or elevators, church :steeples, water towers, clock towers, bell towers, false penthouses or other similar "mimic" structures. Such "mimic" structures shall have a contextual relationship to the adjacent area. • FTC Peloton Proposal: The proposed facility is designed to minimize any change to the appearance of the existing office building. Antennas mounted on the exterior walls will match the color and texture of the existing building faVade. Electronic equipment associated with the antennas will be placed in the building basement, eliminating the need for rooftop accessory structures and further minimizing the impact of the site on the building appearance. 5 I (5) Fencing. Chain link fencing shall be unacceptable to screen facilities. Fencing material shall consist of wood, masonry, stucco or other acceptable materials and be opaque. Fencing shall not exceed six (6) feet in height. • FTC Peloton Proposal: No fencing is proposed. (6) Berming. Berms shall be considered as an acceptable screening device. Berms shall feature slopes that allow mowing, irrigation and maintenance. • FTC Peloton Proposal: No berming is proposed. (7) Irrigation. Landscaping and berming shall be equipped with automatic irrigation systems meeting the water conservation standards of the city. FTC Peloton Proposal: No landscaping or berming is proposed; hence, no irrigation is required. (8) Color. All wireless telecommunication facilities and equipment shall be painted to match as closely as possible the color and texture of the wall, building or surrounding built environment. Muted colors, earth tones and subdued colors shall be used. • FTC Peloton Proposal: The proposed antennas will be painted to match as closely as possible the color and texture of the existing walls on which they are mounted. The existing walls are muted earth tones as shown on the photosimulations. (9) Lighting. The light source for security lighting shall be high pressure sodium and feature down -directional, sharp cut-off luminaries so that there is no spillage of illumination off -site. Light fixtures, whether freestanding or tower -mounted, shall not exceed twenty-two (22) feet in height. • FTC Peloton Proposal: No exterior lighting is proposed. (10) Interference. Wireless telecommunication facilities and equipment shall operate in such a manner so as not to cause interference with other electronics such as radios, televisions or computers. • FTC Peloton Proposal: The Verizon Wireless telecommunications site will pose no interference issues with other electronic devices. (I 1) Access Roadways. Access roads must be capable of supporting all of the emergency response equipment of the Poudre Fire Authority. • FTC Peloton Proposal: No new access roads are proposed at this site. The existing access and parking lots will be undisturbed. (12) Foothills and Hogbacks. Wireless telecommunication facilities and equipment located in or near the foothills bear a special responsibility for mitigating visual disruption. If such a location is selected, the applicant shall provide computerized, three-dimensional, visual simulation of the 4 facility is an accessory use to an existing use, the facility shall be constructed out of materials that are equal to or better than the materials of the principal use. • FTC Peloton Proposal: The proposed telecommunication facility is consistent with the architectural style of the existing office building. There will be no changes to the architecture of the building..Fagade mounted antennas are designed to create the least impact on the appearance of the building. No equipment or structures are proposed for the roof. (3) Wireless Telecommunication Equipment. Wireless telecommunication equipment shall be of the same color as the building or structure to which or on which such equipment is mounted. Whenever a wireless telecommunication antenna is attached to a building roof, the height of the antenna shall not be more than fifteen (15) feet over the height of the building. All wireless telecommunication equipment shall be located as far from the edge of the roof as possible. Even if the building is constructed at or above the building height limitations contained in Section 3.8.17, the additional fifteen (15) feet is permissible. Whenever wireless telecommunication equipment is mounted to the wall of a building or structure, the equipment shall be mounted in a configuration as flush to the wall as technically possible and shall not project above the wall on which it is mounted. Roof- and ground -mounted wireless telecommunication equipment shall be .screened by parapet walls or screen walls in a manner compatible with the building's design, color and material. • FTC Peloton Proposal: The antennas will be mounted as flush to the exterior walls as technically possible and will not project above the walls on which they are mounted. (4) Landscaping. Wireless telecommunication facilities and ground -mounted wireless telecommunications equipment may need to be landscaped with landscaping materials that exceed the levels established in Section 3.2.11 due to the unique nature of such facilities. Landscaping may therefore be required to achieve a total screening effect at the base of such facilities or equipment to screen the mechanical characteristics. A heavy emphasis on coniferous plants for year-round screening may be required. If a wireless telecommunication facility or ground -mounted wireless telecommunication equipment has frontage on a public street, street trees shall be planted along the roadway in accordance with the policies of the City Forester. • FTC Peloton Proposal: All antennas at this site will be facade mounted. The only ground mounted equipment at the site will be HVAC condenser units located among existing landscaping at the side of the building. 3 columns to which they are mounted on the fagade. The following pages provide detail regarding compliance with the City's zoning requirements for Wireless Telecommunication Sites. LAND USE CODE SECTION 3.8.13 REQUIREMENTS FOR WIRELESS TELECOMMUNICATION 3.8.13 Wireless Telecommunication (A) Location. Subject to the requirements of paragraph (B) of this Section, wireless telecommunication equipment may be attached to or mounted on any existing building or structure (or substantially similar replacement structure) located in any zone district of the city. Wireless telecommunication equipment shall not, however, be permitted to be attached to or mounted on any residential building containing four (4) or fewer dwelling units. • FTC Peloton Proposal: The proposed design calls for antennas to be mounted on the facade of existing building. This building does not contain any dwelling units. As noted above, electronic equipment will be located in the building basement so that no equipment or structures will be required on the rooftop. (B) Co -location. No wireless telecommunication facility or equipment owner or lessee or employee thereof shall act to exclude or attempt to exclude any other wireless telecommunication provider from using the same building, structure or location. Wireless telecommunication facility owners or lessees or employees thereof shall cooperate in good faith to achieve co -location of wireless telecommunication . facilities and equipment - with other wireless telecommunication providers. • FTC Peloton Proposal: Verizon Wireless will not act to exclude or attempt to exclude any other competitor from using the building for the location of other antennas or telecommunication equipment. (C) Standards. (1) Setbacks. With respect to a wireless telecommunication facility that is a tower or a monopole, the setback of the facility from the property lines shall be one (1) foot for every foot of height. However, to the extent that it can be demonstrated that the structure will collapse rather than topple, this requirement can be waived by the Director. In addition, the setbacks for ground - mounted wireless telecommunication equipment shall be governed by the setback criteria established in Articles 3 and/or 4. • FTC Peloton Proposal: Not applicable as no tower is proposed. (2) Wireless Telecommunication Facilities. Whether manned or unmanned, wireless telecommunication facilities shall be consistent with the architectural style of the surrounding architectural environment (planned or existing) considering exterior materials, roof form, scale, mass, color, texture and character. Such facilities shall also be compatible with the surrounding natural environment considering land forms, topography, and other natural features. If such 2 PLANNING OBJECTIVES VERIZON WIRELESS FTCPELOTON DEVELOPMENT REVIEW FOR WIRELESS COMMUNICATION SITE PROJECT INFORMATION Applicant Information: Verizon Wireless (VAW) LLC, d/b/a/ Verizon Wireless, 3131 South Vaughn Way, Aurora, CO 80014 Representative: Irene Cooke, Leasing and Zoning Consultant, Closser Consulting LLC, P O Box 423, Tabemash, CO 80478; (970) 531-0831 Land Owner Information: Flats at the Oval, LLC, c/o Brinkman Partners, Contact: David Vorlage, Director of Real Estate, 3528 Precision Drive, Suite 100, Fort Collins, CO 80528; (970) 237-3780 Engineering Firm Preparing Site Plan: Charles Steckly Architecture, Inc.; 5935 South Zang Street, Suite 280, Littleton, CO 80127; (303) 932-9974 Address of Project: 3003 E. Harmony Road PLANNING OBJECTIVES Verizon Wireless proposes to develop a new telecommunications site, "Verizon Wireless FTC Peloton," at 3003 E. Harmony Road, a large office building near the intersection at Ziegler Road and Harmony Road. The purpose of this site is to provide improved 4G-LTE voice and data capacity for Verizon Wireless customers in the commercial and residential developments surrounding this intersection. The proposed site will be part of continuous telecommunications network serving the greater Fort Collins area. Verizon Wireless has recently developed several sites within the City of Fort Collins and approval of this application will allow Verizon Wireless to meet its federally mandated obligations under the license granted by the Federal Communications Commission (FCC) pursuant to the Telecommunications Act of 1996. Although there is a Verizon Wireless site at the Poudre Valley Health District Campus at 2121 E. Harmony Road, the explosive growth of data usage from "smartphones" and similar devices has made it necessary to increase the data capacity with an additional facility. The proposed facility will address the need for additional capacity to serve the Intel and Avago campuses in addition to the commercial developments in the vicinity of the Harmony -Ziegler intersection. The proposed site will include a total of six (6) panel antennas mounted to the facade of the office building. Electronic equipment associated with the antennas will be placed in the building basement, eliminating the need for rooftop accessory structures and further minimizing the impact of the site on the building appearance. The antennas will be painted to match the existing