HomeMy WebLinkAboutTIMBERVINE, SECOND FILING - FDP - FDP150028 - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSComment Number: 25 Comment Originated: 06/03/2015
06/03/2015: Please correct the description (marked) on sheet 4. See redlines.
Updated.
Topic: Site Plan
Comment Number: 26 Comment Originated: 06/03/2015
06/03/2015: Since the Utility Plans are no longer being revised, we suggest that a
completely new set of plans be filed.
Acknowledged.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 05/05/2015
05/05/2015: The difference in number of units from 167 to 173 is less than 4% and
is not considered to be significant from a traffic operations evaluation perspecctive.
Noted. Thank You.
Page 7 of 6
06/03/2015: There are text over text issues. See redlines.
Updated.
Comment Number: 15 Comment Originated: 06/03/2015
06/03/2015: There is text that needs to be rotated 180 degrees. See redlines.
Updated
Comment Number: 16 Comment Originated: 06/03/2015
06/03/2015: Please tie the coordinate values shown for utilities to the project boundary.
We would prefer that this be done by adding property corner values to each sheet, or
showing the property corner values on the horizontal control plans and adding a note to
each sheet with coordinate values. There appear to be values for the boundary corners
on the utility plan sheets. If these are boundary corner coordinates, please label them
as that.
Note added to see sheet EXO1 for boundary corner coordinates.
Comment Number: 17 Comment Originated: 06/03/2015
06/03/2015: There are issues with matchline references. See redlines.
Updated.
Topic: Landscape Plans
Comment Number: 18 Comment Originated: 06/03/2015
06/03/2015: Since the Utility Plans are no longer being revised, we suggest that a
completely new set of plans be filed.
Acknowledged.
Topic: Lighting Plan
Comment Number: 19 Comment Originated: 06/03/2015
06/03/2015: Since the Utility Plans are no longer being revised, we suggest that a
completely new set of plans be filed.
Acknowledged.
Topic: Plat
Addressed.
Updated.
Noted.
Updated.
Addressed.
Comment Number: 20 Comment Originated: 06/03/2015
06/03/2015: Please make changes to the legal description as marked. Technically
you could remove all bearing & distance calls by referencing prior Subdivision. This
is your choice. See redlines.
Comment Number: 21 Comment Originated: 06/03/2015
06/03/2015: There are line over text issues. See redlines.
Comment Number: 22 Comment Originated: 06/03/2015
06/03/2015: All reception numbers for documents recorded by separate document
must be added prior to mylars.
Comment Number: 23 Comment Originated: 06/03/2015
06/03/2015: Please revise the monumentation along the west boundary line, to
following C.R.S. 38-51-105 (1) (c). See redlines.
Comment Number: 24 Comment Originated: 06/03/2015
06/03/2015: What is the box (marked) near the south of the Sour Street & Shandy
Street intersection? See redlines.
Page 6 of 6
06/04/2015: Stormwater is ready for a hearing.
Noted. Thank You.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamaraue@fcoov.com
Topic: General
Comment Number: 2 Comment Originated: 05/06/2015
05/06/2015: Please provide documentation on what is being revised from the
original approved plans.
Drainage letter provided.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcoov.com
Topic: Construction Drawings
Comment Number: 1
Comment Originated: 05/04/2015
06/03/2015: There are line over text issues. See redlines.
05/04/2015: There are line over text issues that will need to be corrected for final
review.
Updated.
Comment Number: 2
Comment Originated: 05/04/2015
06/03/2015: The lighter background text & linework marked is not acceptable. It will not
scan or reproduce. Please darken it up. If it is not needed on the plans, it should be
removed. See redlines.
Updated.
05/04/2015: The lighter background text & linework marked is not acceptable. It will not
scan or reproduce. Please darken it up.
Comment Number: 11 Comment Originated: 06/03/2015
06/03/2015: Please revise the benchmark statements on all sheets to the following. All
benchmark information needs to match on all sheets.
PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM)
BENCHMARK # w/ DESCRIPTION ELEVATION:
BENCHMARK # w/ DESCRIPTION ELEVATION:
If using NGVD29 UNADJUSTED the following equation statement will be needed.
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED
+ X.XX�.
Updated.
Comment Number: 12 Comment Originated: 06/03/2015
06/03/2015: The titles in the sheet index do not match the titles on the marked sheets.
See redlines.
Updated.
Comment Number: 13 Comment Originated: 06/03/2015
06/03/2015: There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Updated
Comment Number: 14
Comment Originated: 06/03/2015
Page 5 of 6
Casing added.
The District has more than adequate capacity to service the property referenced above.
The District is in full compliance with federal and state water quality requirements.
Please feel free to contact me if you have any questions.
Sincerely,
Brian Zick, P.E. District Engineer
Comment Number: 2
05/08/2015: ELCO
Comment Originated: 05/08/2015
Plans for the above referenced project were received by East Larimer County Water
District (District). District staff has reviewed and redlined the drawings/documents.
The following comments are to further clarify redlines. Note that comments below
are not included for all redlines.
Sheet Comment
Multiple Sheets - ELCO signature block should be replaced with updated ELCO
signature block. Updated signature block will be emailed to Rob Van Uffelen.
Updated Sig Block.
SS Sheets - Remove ELCO block from these sanitary sewer sheets
ELCO sig Block Removed.
SS 06 - ELCO line crossing shows approximately 6 inches of clearance between
water and sewer line. On drawing note that ELCO line is can be raised to have 4.5-ft
of cover (drawing appears to show 5.5-ft cover now) and provide 18-inches of
clearance between water and sewer line.
18" clearance provided.
SD02 - Two lines in the profile are labeled as �waterL lines. Please review, lower
line appears to be sewer.
Updated.
DT 03 - There are no ELCO details on this sheet and therefore, remove
ELCO signature block from this page.
ELCO sig Block Removed.
EX 01 - No ELCO impacts on this sheet, remove ELCO signature block.
Please return the redlined sheets with the next review set for backchecking.
ELCO sig Block Removed.
Sincerely,
Randy
Siddens
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@ooudre-fire.ora
Topic: General
Comment Number: 1 Comment Originated: 05/06/2015
05/06/2015: PFA has no comment relative to the replat.
Noted. Thank You.
Contact: Wes Lamarque, 970-416-2418, wiamaraue@fcaov.com
Topic: General
Comment Number: 2
Page 4 of 6
Comment Originated: 06/04/2015
with the lot line adjustments. They currently show the numbering from the original
project. Please see redlines.
Updated.
Department: Outside Agencies
Contact: Pete Wray, 970-221-6754, owrav@fcoov.com
Topic: General
Comment Number: 1
05/08/2015: Boxelder:
Comment Originated: 05/08/2015
On behalf of the Boxelder Sanitation District (BSD), Farnsworth Group has reviewed the
Final Development Plan identified as:
Utility Plan review for a 167 single family lot subdivision. The Utility Plan proposes 8-
inch sanitary sewers throughout the project, connecting into a proposed 10-inch
sanitary sewer flowing South offsite along Mexico Way and eventually connecting to BSD's
existing 15-inch sanitary sewer main in International Blvd.
The District hereby advises as follows:
- There is no objection to this proposal.
- Responses required to comments below.
- The District will respond at the hearing date (TBD)
Comments:
1) Sanitary sewer service shown at Lot 15, Block 2 connecting into manhole SSMH 5-6
will need to be realigned to connect to the sanitary sewer main. BSD will not allow any
services to flow directly into a manhole.
Service revised.
2) The Utility Contact List for BSD needs to change from Patricia Mathena to Karen
Reynolds.
Contact list updated.
3) Update all construction details and specifications to meet new BSD standards. To
obtain updated details and specifications, reference BSD website or contact BSD.
Details updated.
4) All utility crossings need to have 18-inches of separation. If crossings are under 18-
inches, a casing is required and needs to be shown on profiles at the crossing. Add
callout of separation to all utility crossings in profile view.
Crossing separation shown.
5) Manholes SSMH 5-1A and SSMH 8 are shown below Proposed Ground in
profiles. Check manhole rims and adjust accordingly.
Updated.
6) The plans show manholes in areas where permeable pavers are to be used.
Provide information that describes how these pavers work and will not cause
infiltration problems into manholes.
Please see note 12 on the SS sheets.
7) Sanitary Sewer casing will be required on Sanitary Sewer Line 1 at water line
crossing Station 34+91.52. Show and label casing in Plan and Profile.
Page 3 of 6
Contact: Marc Ragasa, 970.221.6603,
mraaasa@fcaov.com Topic: General
Comment Number: 7 Comment Originated:
05/29/2015
05/29/2015: Since the Plat will not be included in the final Utility
Plans, please remove the Plat (For reference only) item from the
Sheet Index.
Plat reference removed.
Comment Number: 8 Comment
Originated: 05/29/2015 05/29/2015: List Private Drives in the General
and Construction Notes #47.
Private Drives Listed
Comment Number: 10 Comment Originated: 05/29/2015
05/29/2015: Angled sidewalk chases are not allowed. Please revise chase
on Lager and Saison Street. See redlines.
Sidewalk Chases Revised.
Comment Number: 11 Comment Originated: 05/29/2015
05/29/2015: It appears with the revision of lot lines, a layer was not changed.
Please adjust Lot labeling on all Street Plan and Profile sheets (RD01, RD02,
RD04, RD05, RD07, RD08, RD12, RD13).
Lot references Updated.
Comment Number: 12 Comment Originated: 05/29/2015
05/29/2015: More elevation points will be needed for the intersection
of Trappist Street and Saison Street where the sidewalk chase is
located (Sheet RD10) or a note can be added to 4"See Sheet RD18
for more details"4
Note added.
Comment Number: 13 Comment Originated: 05/29/2015
05/29/2015: Please update detail sheets with the updated LCUASS drawings.
See redlines.
Sheet details updated.
Comment Number: 14 Comment Originated: 05/29/2015
05/29/2015: ADA ramps need to align. (Saison and Lager; Stout and
Lager) Please see redlines.
Ramps aligned.
Comment Number: 15 Comment Originated: 05/29/2015
05/29/2015: Please show the transition on Dunkel Street at Mackinac. A
minimum of 30' is required.
Transition shown on sheet RD 17
Comment Number: 16 Comment Originated: 05/29/2015
05/29/2015: Label the transition distance at Saison Street and Stout Street.
Transition added.
Transition shown
Comment Number: 17 Comment Originated: 05/29/2015
05/29/2015: Lot labels on street plan and profile sheets have not been updated
Page 2 of 6
of
Fort`�TyCollins
June 05, 2015
Russell + Mills Studios
141 S. College
Ave., Suite 104 Fort
Collins, CO 80524
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
RE: Timbervine Major Amendment and Replat, MJA150001, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions
about any comments, you may contact the individual commenter or direct your
questions through the Project Planner, Pete Wray, at 970-221-6754 or
pwray@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Pete Wray, 970-221-6754,
owrav@fcoov.com Topic: General
Comment Number: 9
Comment
Originated: 06/05/2015 06/05/2015: This project is ready for hearing,
scheduled for June 18.
Noted. Thank You.
Topic: Lighting Plan
Comment Number: 8
06/02/2015
Comment Originated:
06/02/2015: Enlarge proposed street light fixture locations on plan. It
is very hard to see these as shown.
Updated.
Topic: Site Plan
Comment Number: 7
Comment
Originated: 06/02/2015 06/02/2015: Tract B - Make sure cut -through
paths between lots 9-10, 23, 24,
28-29, and 33-34 have a minimum lot to lot clearance of 10 feet to
allow space on either side of the 5' walk. This minimum corridor
width is acceptable, in review of the LCUASS standard.
Acknowledged.
Department: Engineering Development Review
Page 1 of 6