HomeMy WebLinkAboutSWALLOW OFFICE BUILDING - PDP - 45-00 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: L45 -()n
,)
a a 4 (8«� rf<<� Date: 14, ` . DI
Planner: Try
Slrorx,
rr1 Traffic Operations:
Engineer: +
Tli
wfr A wy- /I/ CCOL ")
Items Requested Redlined Items Being Returned
lite
I land
I Plat Utiliq I Drainage R t Other Items Required Site I landI Plat U81i Drainage R f Other Items BeingReturned
ineering
X
X
itormwater
X
X
Wa--ter/waitewater
T
Tralic Operations
x
X
x
x
il
Trans. Planning
nd
Transibrt
X
n
Natural Resources
Park Planning
Other:
Note: All redlined items should be returned with the mubmittal/ revisions.
. l.
I
1. I
FUM PROJECT
�--.--------_
IN:34 pit
BUILDING INSPECTION
ADVANCE PLANNING
WATER CONSERVATION
PUBLIC SERVICE
STATE HILIMAY DEPARTMENT
------.-_
CoMpANy
DITCHRAILROAD:
-----.----.-_
UP or BN/CS
iiiO��
OWE