Loading...
HomeMy WebLinkAboutSTODDARD PROPERTY - OVERALL DEVELOPMENT PLAN - 42-00 - CORRESPONDENCE - REVISIONSMr. Steve Olt April 26, 2001 Page 3 23. Noted? 24. Noted. Please refer to the updated Conceptual Drainage Study. 25. Noted and complied with. 26. Noted and complied with. Please review this information and should you have any questions, give me a call. Sincerely, JIM SELL DES G C. Dana Le itt, ASL Project Manager encl. USERVER_D I IL DRIVE\PROJECf PILESLLAND12017JS1DOCS\ODPRESPONSELM4.26.01.DOC Mr. Steve Olt April 26, 2001 Page 2 10. Noted. 11. Noted. 12. Noted. 13. Noted. 14. Noted. 15. Noted. The right-of-way requested by the canal company will be incorporated into the plan and is depicted on the ODP as part of the buffer area. 16. Noted. 17. Advance Planning , a. Noted. The owner has initiated a dialogue with the property owner to the south in regards to obtaining a second point of access for the project. b. A neighborhood center is required for projects forty acres and greater in size. This project is 39.15 acres. A neighborhood center is not required. c. Noted. Shown on the ODP. d. Noted. 18. Engineering Department a. Noted. See comment 17.a above. This issue will be resolved as project development plans progress to the PDP stage. b. Pedestrian connections shall be established within the development via a network of trails connecting development pods, the greenway trail along the canal and to the adjoining properties to the east and west. A future connection to the north property boundary is shown in the event that the railroad switching yards are removed (the impediment to access to East Vine Drive c. Noted. d. See note 17.b above. e. Noted. The parcel is 39.15 acres. f. Noted. g. Noted and request complied with. h. Noted and request complied with. i. Heights will comply with the Land Use Code. j. Noted and request complied with. k. Noted and request complied with. 1. Noted. 19. Noted. 20. This project does not meet the minimum threshold of 40 acres to comply with Section 4.4(D)(3) of the LUC as stated above in comment 17.b. 21. Addressed by LSA. 22. Addressed by LSA. 11SERVER DELLIE DRIVETROJECf FILESILAN 017ISIDOCSIODPRESPONSELTR1.16.0I.DOC a April 26, 2001 Mr. Steve Olt Project Planner City of Fort Collins Current Planning Department 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Stoddard Property Overall Development Plan Staff Comments Dear Steve: The attached prints of the Stoddard Property Overall Development Plan, the updated Transportation Impact Study, the updated Conceptual Drainage Study and the Ecological Characterization Study reflect revisions made in accordance with the comments in your letter of January •26, 2001. Our specific response to each comment is noted below, using numbering the shown on your letter. 1. Noted. 2. Transportation Planning a. The roads in Collins Air Mobile Home Park are privately owned roads. b. Addressed by LSA. 3. Traffic Operations a. As a county owned road, the additional use of International Boulevard for residential traffic will be dealt with between the City and the County during the PDP process. b. Addressed by LSA. c. Noted. d. Noted, and addressed by LSA. 4. Stormwater Utility a. Noted. b. A revised conceptual drainage study is being submitted. c. Noted. 5. Noted. 6. Noted. 7. Noted. 8. Noted. 9. Natural Respurces a. Noted. An Ecological Characterization Study has been completed and is included in this submittal. There are no wetlands on this site. The wetlands are to the south on the adjacent property. b. Noted. c. Noted. 153 WEST MOUNTAIN AVENUE FORT COLLINS, COLORADO 80524 970 484 1921 FAX: 970484 2443 E-MAIL: JIMSELLCPFRILCOM