HomeMy WebLinkAboutMELDRUM/MYRTLE 4-PLEX - PDP - 13-01 - CORRESPONDENCE - (5)Project:
Date: /D ./D . D
Planner:Traffic Operations:
Engineer:.'{
Items Requested
Redlined Items Being Returned
V
'Co
m
a
m
c y
°
�
Other Items Required
;;
'^
a
�
D
m
fa.
°C
p
Other Items being
Returned
Engineering
X
X
Stormwater
I X
Real
Water/Wastewater
Traffic Operations
.Transportation Planning
Tra nsfort
Natural Resources
Park Planning
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET
ITEM: bm4r-kkk
DATE RECEIVED. O.
1 lo.d�
F
V]
H
z
F
z
�
N
a
z o
W
G1�
Z W
W o
z
z
w
u W
zcQ
z o
c
F
O Ems.
yz
z
o
N
W
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES •
FORESTRY
WATER & WASTEWATER/FCLD
PFA
POLICE - LORI DIGLIANI
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
Department: Water Wastewater
45 Issue Contact: Jeff Hill
See Redlines - See site, landscape and utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Bob Barkeen
City Planner
Page 3
70
Issue Contact: Doug Martine
1. If existing underground electric service from the alley to 604 S. Meldrum is not
currently in the new 6 ft. side lot easement, it will need to be relocated within the
easement at developer's expense.
2. Developer will need to coordinate power system design and L&P Development
Charges with L&P engineering (221-6700).
Department: Natural Resources
80
No Issues -
Department: PFA
42
Issue Contact: Doug Moore
Issue Contact: Michael Chavez
Address Numerals - Address numerals shall be visible from the street fronting the property,
and posted with a minimum of 6-inch numerals on a contrasting background. Bronze
numerals on brown brick are not acceptable. Note: This building shall have one numerical
designation for the entire building with alphabetical designations for each individual unit and
in a clockwise direction around the building.
Department: Stormwater Utility
92
Issue Contact: Wes Lamarque
Please add Water Quality Outlet Structure Detail on the plans.
93
Issue Contact: Wes Lamarque
Please add basin summary and pond summary tables on the drainage plan.
Department: Traffic Operations
No Comment.
Department: Transportation Planning
81
No further comments
Issue Contact: Eric Bracke
Issue Contact: Mark Jackson
Page 2
STAFF PROJECT REVIEW
City of Port Collins
ARCHITECT'S STUDIO Date: 10/25/01
CARR BIEKER
151 W. MOUNTAIN AVE.
FT. COLLINS CO 80524
Staff has reviewed your submittal for MELDRUM/MYRTLE 4-PLEX PDP - TYPE 1 #13-01,
and we offer the following comments:
ISSUES:
Department: Advance Planning
51
Issue Contact: Clark Mapes
Historic Preservation - Applicant will need to go through Karen McWilliams
demolition/alteration review process.
Department: Engineering
74
Issue Contact: Katie Moore
Cover sheet: Please correct general notes where redlined.
89 Issue Contact: Katie Moore
Plat: Please remove the Vested Rights Statement.
90 Issue Contact: Katie Moore
Overall Utility Plan: Single parking space off of Myrtle should be a minimum of 20' deep
(repeat).
There is a tree being shown in a pedestrian ramp.
See plan for any additional comments.
91
Issue Contact: Katie Moore
Grading Plan: Please revise grading on sidewalk connection to the north entrance to the
building as discussed.
Department: Light & Power
M.
Issue Contact: Doug Martine
Development Charges - Normal electric development charges plus costs to modify the
existing electric system will apply.
Page 1
Commt y Planning and Environmental rvices
Current Planning
City of Fort Collins
October 24, 2001
Carr Bicker
Architects Studio
151 West Mountain Avenue
Fort Collins, CO 80524
Re; Meldrum/Myrtle Four Plex
Dear Carr,
The following are comments and corrections received to date for the Meldrum/Myrtle
four plex project development plan application. The project has been scheduled for an
administrative hearing on November 14, 2001, at 6:30 pm. The following comments
will need to be addressed on the final compliance submittal pending a favorable
consideration by the hearing officer. Red -lined drawings are available for pick-up at the
Current Planning front desk.
If you have any questions on this matter, please feel free to contact me at 221-6750.
Si6erel
0.
ob Barkeen
City Planner
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020