HomeMy WebLinkAboutFORT COLLINS VOLUNTEERS OF AMERICA, ELDERLY HOUSING - PDP - 14-01 - CORRESPONDENCE - (7)157 Issue Contact: Jeff Hill Use 1.5-inch water services for all 6-plex buildings. Include the 1.5-inch meter pit detail on the detail sheets. 158 Issue Contact: Jeff Hill Provide insulation detail and calculations for our review. See attached. Department: Zoning 175 Issue Contact: Peter Barnes The landscape installation notes states that the escrow landscaping may be phased "as per the plan". However, there are no phase lines on the landscape plan. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, STEVE OLT City Planner Page 14 Department: Water Wastewater 162 Issue Contact: Roger Buffington Re -align sanitary sewer at tie-in to existing sewer as shown on marked up plans. 147 Issue Contact: Jeff Hill It appears that the sanitary sewer main is not within the utlity easement. Coordinate the plat with the utility plans. 148 Issue Contact: Jeff Hill Clearly label all fittings and valves on water mains. 149 Issue Contact: Jeff Hill Coordinate landscape plan with civil plan to reflect the same information. Provide the required landscape/utility separation distances. 150 Issue Contact: Jeff Hill Permanent structures may not be placed in utility easements (i.e. trash enclosures, development signage, etc.). 151 Issue Contact: Jeff Hill Provide concrete encasement of all sewer lines which cross above or within 18-inches vertically of a water line. 152 Issue Contact: Jeff Hill Use different line types to distinguish between utilities, R.O.Ks, easements, etc. 153 Issue Contact: Jeff Hill Provide gravity block design on water main lowerings. 154 Issue Contact: Jeff Hill Label all fire lines as D.I.P. Provide lengths of D.I.P. for fire lines. 155 Issue Contact: Jeff Hill Correct sanitary sewer profile ( scale, inverts, other utility crossings, etc.). 156 Issue Contact: Jeff Hill Clearly define the abandonment of existing stub and core drilling of new connection at sanitary sewer manhole. Page 13 46 Pedestrian/bike path & bridge questions Issue Contact: Mark Jackson It is still unclear to me that the applicant has agreed to build the bike/pedestrian path as shown on the site plan. This includes the bridge necessary to cross over the canal/buffer area. I need clarification as to who is planning to pay for and build this facility, and when. 47 Brook Drive pedestrian connection Issue Contact: Mark Jackson Will this development make a pedestrian connection along the Brook Drive ROW east to the Skyline Acres subdivision at Richmond Drive? Department: Technical Services 127 Issue Contact: Jim Hoff Plat boundary closes. Legal does not match boundary. 128 Issue Contact: Jim Hoff North quarter corner does not match city's records (date). 129 Issue Contact: Jim Hoff Description of 1/16 corner is not shown. 130 Easements and road ROW are not locatable. 131 What is a "shared easement"? 132 Issue Contact: Jim Hoff Issue Contact: Jim Hoff Issue Contact: Jim Hoff What are the restrictions, etc on the 25' "natural area buffer"? 133 Text is too small - need to see a new plat. Issue Contact: Jim Hoff Page 12 137 Issue Contact: Wes Lamarque Drainage Report: Please revise time of concentration calculations to reflect the gutter travel time. This will reduce the overland lengths and better represent the actual basin. Please revise detention pond volume calculations. Please check intensities and 100 yr. C coefficient. City of Ft. Collins allows FAA method for pond sizing. Please discuss sub- basin "P". Undetained flows from the site must be taken into account in the overall release rate. This is accomplished by subtracting the undetained flows from the overall release rate to calculate new pond release rate. Please change water quality structure to City standard detail. The currently shown detail does not allow release of flows between the water quality needs and 100 yr. event. 140 Issue Contact: Wes Lamarque Utility Plan Please use different linetypes for the various utilities. Please label all drainage features. 141 Issue Contact: Wes Lamarque Please show all storm sewers on the street profiles including alignments, size, and location.142 Issue Contact: Wes Lamarque Please provide concrete encasements for stormwater crossings with waterlines per City requirements.143 Issue Contact: Wes Lamarque Please provide a crosspan on Horsetooth Road and show on street plan. Department: Transfort 159 Transfort concrete pad should be 6" depth. Department: Transportation Planning 4 Make Bike Trail connection with Phase I Issue Contact: GayLene Rossiter Issue Contact: Mark Jackson • Connection to proposed future bike trail is good only if Phase 2 of site is built. How will this connection be made if only Phase I is built? C: Issue Contact: Mark Jackson • Can Brook Drive ROW area be used to make a bike/ped connection to the east? Page 11 I mentioned this on record #176, but it doesn't show up when I choose "more", and for some reason I can't edit it, so I will restate that comment here.--> It will be necessary for Light and Power to use above grade pad type transformers placed between the curb and sidewalk. Department: PFA 145 Issue Contact: Michael Chavez Address Numerals Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. 146 Issue Contact: Michael Chavez Sprinkler Requirement This comment is to confirm that all buildings beyond 660 feet are to be fire sprinklered. Department: Stormwater Utility 134 Issue Contact: Wes Lamarque Emergency Spillway: Emergency spillway actually occurs at the east crosswalk of the parking lot which is at an elevation of 98.45. The spilway should be modeled here and have 1 foot of freeboard. Also, the spillway detail does not match invert elevation on plan. 135 Issue Contact: Wes Lamarque Grading and Drainage Plans: Please separate grading and drainage plans. Please show basin delineations on drainage plan and please provide the same drainage plan in the report as in the plan set. Please show more low point and high point spot elevations around buildings, along swales,and flow line along streets to better clarify grading. Please show basin summary table, detention pond table, and swale cross -sections on drainage plan. Please show and label all drainage features on drainage plan. 136 Issue Contact: Wes Lamarque Erosion/Sediment Control Comments: 1. Please provide an erosion/sediment control report and plan in accordance with City of Fort Collins specifications. When this is done, a review of the report and plan can be done. No report, no calculations, no notes, no schedule, etc Page 10 179 Issue Contact: Katie Moore Sheet 0.1: Please correct notes 47-48 as shown, and provide a copy of the letter from P FA. 180 Issue Contact: Katie Moore Plat sheet 1: please provide a directional arrow for the vicinity map, and use the city's standard wording for the surveyor's certificate. 181 Issue Contact: Katie Moore Plat sheet 2: Please label all easements (ie the esmt for the irrigation laterals and the access easement north of Brook Drive.) 182 Issue Contact: Katie Moore Plat sheet 2: the 35' utility and drainage easement does not match what is shown on the site plan. 120 Issue Contact: Rick Richter High Swell soils need to be addressed in the soils report. Department: Light & Power 40 Issue Contact: Doug Martine 1. Electric facilities will inculde pad style transformers placed between the sidewalk and the curb. 2. Landscape plan needs to show the planned streetlights. A streetlight plan has been sent via interoffice mail to Steve Olt 7-30-01. Street tree locations will need to be adjusted to provide a minimum of 40 ft. of clearance between trees and streetlights. 3. Electric meters will need to be 'ganged' on each building, and their locations coordinated with L&P prior to development. 176 Issue Contact: Doug Martine It will be necessary for Light and Power to use above grade pad type transformers to be placed between the courb & sidewalk. 177 Issue Contact: Doug Martine Electric meters will need to be 'ganged' at or near the street side of each building. Final electric meter locations will need to be coordinated with Light and Power engineering. Page 9 W. Issue Contact: Katie Moore Please show how new and existing curb and gutter tie together.108 Issue Contact: Katie Moore Please provide spot elevations as required.114 Issue Contact: Katie Moore Please label cross -slopes and slopes within and adjacent to the ROW.115 Issue Contact: Katie Moore The new cross -slope shall be no less than the existing slope (7.4.2C).116 Issue Contact: Katie Moore Please provide additional spot elevations.117 Issue Contact: Katie Moore Please provide more details/spot elevations regarding the driveway cut across from Brook Drive. There is not enough information to tell how it should be built. 119 Issue Contact: Katie Moore Site Plan: Please match the site plan with the utility plans and plat. Easements, ROW, radii and other items do not match. See redlines. 122 Issue Contact: Katie Moore Please provide design of pedestrian bridge and address the issue of who will be building it. 125 Issue Contact: Katie Moore Sanitary Sewer plan and profile and other sheets: Please place utilities a minimum of 2' below scarified subgrade elevation (12.2.2). Please see plans for additional comments. 160 Issue Contact: Katie Moore Please label depths of concrete for Transfort pad and bike/ped trail. 178 Issue Contact: Katie Moore Sheet C0.0: Please add a directional arrow to the vicinity map and correct index (omit landscape and site plans from utility plan set). Please see sheet for additional comments. Page 8 83 Issue Contact: Katie Moore Please provide additional spot elevations at the both intersections as shown on drawing 7- 3213.84 Issue Contact: Katie Moore Please call out driveways as concrete to the ROW.87 Issue Contact: Katie Moore Please provide radii for cul-de-sac as shown on redlines.92 Issue Contact: Katie Moore Please maintain constant grade on Kunz from flowline on Horsetooth back for 125' (drawing 8-15).93 Issue Contact: Katie Moore Please show overlaps or gaps on the flowlines at the station equations.94 Issue Contact: Katie Moore for the northmost vertical curve, the minimum length of a sag vertical curve is 70' (table 7- 18).95 Issue Contact: Katie Moore Please provide a minimum 1 % flowline slope within the culdesac (figure 7-19).96 Issu Please provide a flowline curve table including radii, arc lengths, angles and tangents for all curves.99 Issue Contact: Katie Moore Please see kunz court plans for additional redlines.100 Issue Contact: Katie Moore Kunz court profiles: Please provide minimum 2% cross -slopes in all locations (including culdesac). 101 Issue Contact: Katie Moore Please label slopes within the ROW and adjacent to the ROW. Page 7 71 Issue Contact: Katie Moore Please provide more spot elevations and label high points.72 Issue Contact: Katie Moore Please see plans for additional comments. 75 Issue Contact: Katie Moore Please call out how irrigation will pass under ROW (what kind of pipe, size,etc.) 76 Issue Contact: Katie Moore Please show ROW on Kunz Ct and clearly show all easements using different line weights/types. 77 Issue Contact: Katie Moore Please call out driveways as concrete to the ROW.79 Issue Contact: Katie Moore Please label Storm sewer and Sanitary sewers: type of pipe, sizes, slopes, length of segments between manholes, manhole numbering. 81 Issue Contact: Katie Moore Please see plans for additional redlines.82 Issue Contact: Katie Moore Kunz Court plan and profile: Please label radii of curb returns on both Horsetooth and Brook. Horsetooth radii should be 25' and Brook Drive radii should be 20' per table 8-2. Page 6 Department: Engineering 22 Issue Contact: Katie Moore Offsite grading easements will be needed along east edge of property. Please see grading plan for locations. (repeat) Letters of intent from adjacent property owners must be provided by the time of hearing and actual easements provided by the time of filing mylars. 30 Issue Contact: Katie Moore Please provide a construction easement for Parks to construct trail (35' width). (repeat) 50 Issue Contact: Katie Moore Plat: Lateral owners need signatures on plat. 53 Issue Contact: Katie Moore Plat: Please label the total existing ROW for Horsetooth. 57 Issue Contact: Katie Moore Plat: Please dedicate sight distance easments and add sight distance language on the plat. These are for the driveway intersections with Kunz, not the intersection of Kunz and Horsetooth. Those proposed easements are not needed. Issue Contact: Katie Moore What is going on with the temporary construction easement for Parks? And the pedestrian access easement within the ditch easement? 61 Please see plat for additional comments. Drainage and erosion control plan: Please show additional flow arrows. Fill Issue Contact: Katie Moore Issue Contact: Katie Moore Issue Contact: Katie Moore Please more clearly show existing contours and more clearly label new contours. Page 5 Please contact Ward Stanford, at (970)221-6820, if you have questions about his comments. 171 Issue Contact: Steve Olt The Light & Power Department offered the following comments: Electrical facilities will include pad -style transformers between the sidewalks and curbs. Electric meters will need to be 'ganged' on each building and their locations coordinated with Light & Power Engineering prior to development. The Landscape Plan needs to show the planned streetlights (as shown on a red - lined plan that has been forwarded to TSP Five). Street tree locations will need to be adjusted to provide a minimum of 40' clearance to each streetlight. Please contact Doug Martine, at (970)224-6152, if you have questions about his comments. 172 Issue Contact: Steve Olt Ron Mills of the Right -Of -Way Department indicated that he cannot find the trail dedication on the subdivision plat. It needs to be shown. 173 Issue Contact: Steve Olt Laurie D'Audney, representing the City's water conservation requirements, indicated that her comments are on an Irrigation and Water Conservation Comment Sheet (that has been forwarded to TSP Five). 174 Issue Contact: Steve Olt Rick Lee of the Building Inspection Department offered the following comments: A copy of the various codes that the Building Department will enforce is attached to this letter. The information submitted suggests that multi -family housing will be provided. The City wants to inform you that they are enforcing the 1998 ANSI for accessibility and a State statute, which requires that on common property 1 accessible (Type 'A') unit for each 7 units (or fraction thereof) shall be provided. Accessibility is required in most R-1 construction, so pay careful attention to the requirements of ANSI and what items are required in a Type 'A' dwelling unit. Another more commonly missed component is the required fire -rated separation between units and in attic spaces. Page 4 Please contact Tim Buchanan, at (970)221-6361, if you have questions about his comments. 168 Issue Contact: Steve Olt The Parks Planning Department offered the following comments: * Regarding the proposed recreational trail: an easement from VOA is needed on the subdivision plat. an easement is needed from the PV&L Ditch Company. * Similar to the approved Mountain Ridge Farm, 2nd Filing agreement: this developer (VOA) is to fund 1/2 of the 8' wide recreational trail (4' of width) on this property. this developer (VOA) is to fund the cost of the recreational trail bridge crossing over the PV&L Canal. * The City will have funds available in 2002 for their portion of the recreational trail construction. Please contact Craig Foreman, at (970)221-6618, if you have questions about his comments. 169 Issue Contact: Steve Olt AT&T Broadband (cable TV) has indicated that they would like to service this project with CAN plant. 170 Issue Contact: Steve Olt Traffic Operations offered the following comments: * No TIS was provided. Please provide a TIS. Has a scoping meeting been conducted for this project? * Please provide a Signing and Striping Plan for Horsetooth Road. Sheet C3.2 of the utility plans: Street width shown is 70'. It should be 83' for a 4-lane arterial street. Why is only 35' of half right-of-way being indicated? - East roadway transition should be per City Street Standards, Figure 8.03, that provides a transition of 320' for this roadway. * Sheet C3.5 of the utility plans: Details should state the respective City Street Standards figure number. Page 3 Call 221-6225 to discuss these comments specifically. 139 Issue Contact: Clark Mapes Front stoops the sidewalks leading to individual units are a positive aspect of the plan. But typically, a dwelling unit benefits from some sort of stoop or landing. In this case the 3' wide walk leading clear to the entrance misses the opportunity to emphasize the entrance, maybe offer a place to put a chair, to wait, etc. It looks like it may be an oversight due to the 50 scale plans. In fact, there is no place sit outside anywhere on the plan. No patio, porch, urban walkway, etc. despite the urban intensity of the development. Can an entry landing be provided for each unit? Is there a reason not to? Department: Current Planning 165 Issue Contact: Steve Olt The Post Office has indicated that they have no comments regarding this development proposal. 166 Issue Contact: Steve Olt The Pleasant Valley & Lake Canal Company has indicated that: There will need to be written approval with their Board of Directors for any shared use of the pathway/right-of-way. " There will need to be a written agreement for any ditch crossing. Any maintenance or liability that the City takes over would also require a written agreement with the City of Fort Collins. 167 Issue Contact: Steve Olt The City Forester offered the following comments: " Add the standard Landscape & Tree Protection notes to the Landscape Plan (please see attached). Two trees marked A & B on a red -lined Landscape Plan (that has been forwarded to TSP Five) are noted to be removed due to the utility easement. This appears to be necessary; however, further explanation is needed. Trees marked C & D on a red -lined Landscape Plan (that has been forwarded to TSP Five) will need to be mitigated with a total of 6 upsized mitigation trees. Page 2 STAFF PROJECT REVIEW City of Fort Collins I VOA Natural Sevices Date: 10/2/01 Robin Keller 1660 Duke St Alexandria, VA 22314 Staff has reviewed your submittal for FORT COLLINS VOLUNTEERS OF AMERICA, ELDERLY HOUSING, #14-01, and we offer the following comments: ISSUES: Department: Advance Planning 138 Issue Contact: Clark Mapes East Perimeter Crowding/Lack of Trees There is an awkward and incompatible relationship created by the FRONTS of buildings facing what is technically a SIDE setback area, with a long, straight 6-foot fence typical of REAR yards. The flatness and repetition of the buildings and the lack of trees add to the issue. I acknowledge how the number of units squeezed into the narrow portion of the site has created this situation, and also that the number of units adds to the affordability. But at a minimum, this area needs more attention to the fence and the repetitive building finishes, and it needs trees. See the sketch comments on the Side Elevation showing a more architectural fence 8 feet high, with an arbor top, which can have vines on it (I suggest Engelmann Ivy and Purpleleaf Wintercreeper for low maintenance), and trees. The trees can mingle with the fence and ivy. Carefully considered medium size trees will be needed. I suggest Redspire Pear, Aristocrat Pear, Centurion Crabapple, Cardinal Royal Mountain Ash, and possibly Bur Oak. These are either tight and vertical, or else lend themselves to fitting the space. (Bur Oak because it is one shade tree with an informal canopy shape that could be trained to fit the space.) ALL tight vertical trees should not be used because that could simply serve to emphasize the confining space. Based on this, please design an architectural fence for visual interest and durability to create more of a court yard space to which the buildings can be oriented. Please provide some color variation in the vinyl siding and prefinished gutters. Can there be at least two color schemes, to lend at least a little bit of individual identity and visual interest? This is most important in the narrow east perimeter strip, but also pertains to the whole development plan. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1