Loading...
HomeMy WebLinkAboutFORT COLLINS VOLUNTEERS OF AMERICA, ELDERLY HOUSING - PDP - 14-01 - CORRESPONDENCE - CORRESPONDENCE (3)r- _fleeting Memorandum TSP Five, Inc. 8751 E. Hampden Ave. Suite A-1 Phone (303) 695-1997 Denver, CO 80231 Fax (303) 695-1938 Subject: Volunteers of America 202 Elderly Housing Project Fort Collins, Colorado TSP Project No.0500002 HUD Project No. 101-EE045 Date: February 28, 2001 To: Denise DeHart, VOANS Robin Keller, VOANS Steve Olt, City of Fort Collins, Current Planning Department Kevin Tone, JVA, Inc. Liz McCapes, Brown Construction, Inc. Melissa Stirdivant, HUD Robert Donahue, TSP Architects From: Jennifer Thong The following are revisions to the meeting minutes per Kevin Tone from JVA, Inc.: 1. Pleasant Lake and Valley Irrigation Company needs to be informed of the relocation of the irrigation line and headgate required for the widening of W. Horsetooth Road. 4. JVA feels that the proposed 8' pedestrian/bike path is better located on the property to the west than on this property because of the natural grades along the property line. An agreement with the owner of the adjacent property would be required. 5. The alternate compliance to the chapter of the City's Land Use Code would be requested for Brooke Drive and the extension of Brooke Drive into this property. 6. Basil Hamdan will provide the amount for the potential overflow from the adjacent detention pond to JVA as soon as possible. JVA was requested to add the amount of the potential overflow into their calculations only to provide for the amount to 'pass through' this site. We do not have to oversize our detention ponds to accommodate the potential overflow. Because of the limited release rate of 1.5 cubic feet/second required for the detention ponds on site, Basil Harridan would allow the storage volume for water quality and detention to be combined. CC: TSP File