Loading...
HomeMy WebLinkAboutFORT COLLINS VOLUNTEERS OF AMERICA, ELDERLY HOUSING - PDP - 14-01 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESApache Forest easement, still a..owing a 260' buffer. This buffer zone, beyond the required trees and landscaping as outlined in the Land Use Code, will likewise be incorporated as native grasses which will also not be irrigated. Landscape plantings proposed for this development have been designed to the best extent possible to comply with the City of Fort Collins Land Use Code landscaping requirements. Deciduous street trees have been incorporated at the spacing required and additional deciduous trees have been added to south and west sides of buildings where allowed to provide summer shade and winter sun. In addition, more dense shrubs have been planned to be installed at the ends of parking pods to filter vehicular headlights from spilling onto adjacent properties. Low plantings have also been included along a minimum of 50% of the length of building facades facing the public residential local street. Vehicular circulation will be provided by an internal access drive and parking pods between the dwelling unit buildings. Currently, three open irrigation ditch laterals pass across the site, historically allowed by a previous property owner. The lateral residing closest to West Horsetooth Road is being routed into an underground 12" PVC line and a 10' easement will be provided, concurrent with the 15' utility easement provided adjacent to the widened West Horsetooth Road right-of-way. The existing middle irrigation lateral is proposed to be abandoned, while the southernmost existing irrigation lateral will be relocated, remaining an open ditch and provide water for all customers previously serviced by the middle and southern irrigation lateral. A couple of alternative compliances are being proposed as outlined and explained in a letter to the Engineering Department included in this Project Development Plan application. A neighborhood meeting will be held at Johnson Elementary at 4104 Seneca Street on March 12 at 7:00 P.M. This development is being funded and will be managed by Fort Collins Volunteers of America Elderly Housing, Incorporated. There are to be two employees working on site, one manager, living in one of the units, and one maintenance/groundskeeper, living off -site. This proposed development will provide affordable housing for elderly citizens and will be federally subsidized by the Housing & Urban Development (HUD) to allow residents to afford rent according to a percentage of their income. Sincerely, Robert A. Donahue TSP Five Architects Memorandum TSP Five, Inc. 503 Remington Street Suite 5 Fort Collins, CC 80524 To: Steve Olt Current Planning City of Fort Collins From: Robert A. Donahue TSP Five Architects Subject: Volunteers of America 202 Elderly Housing Project Fort Collins, Colorado Date: 5 March 2001 Phone (970) 493-1772 Fax (970) 493-1820 CC: Denise Dehart, VOANS Robin Keller, VOANS Jennifer Thong, TSP Five Architects Mr. Steve Olt, I am writing this letter as a statement of planning objectives as required by the Project Development Plan submittal requirements. We are proposing a 60 unit elderly housing multi -family residential development on an 8.69 acre property on the south side of West Horsetooth Road approximately 1500' west of South Shields Street. The site, zoned LMN, Low Density Mixed -Use Neighborhood, includes a portion of the Pleasant Lake & Valley Irrigation Canal, which also forms the westernmost boundary of the site. Adjacent to the site to the east lies the existing Skyline Acres estate lot single family residential neighborhood, while the still developing Westfield Park PUD single family residential neighborhood lies to the west. To the south, across the protected Apache Forest, is the existing Mountain Ridge Farm PUD single family residential neighborhood. This proposed development will be constructing an access drive into the site, according to the City of Fort Collins street standards for a residential local street, with the exception of widening the access lane from the city standard from 16' to 20'. The 20' access lane will comply to the Poudre Fire Authority requirement for an unobstructed 20' fire lane. A letter is included with this Project Development Plan application to the Engineering Department explaining the alternative compliance to the city street standards. This access drive will be platted and dedicated as a public street, with 9' utility easements on both sides of the street as required. This public street will also include detached sidewalks with complete handicap accessibility and striping to delineate pedestrian paths that cross parking pods or the public access drive. This proposed development is providing a 50' buffer zone against the east side of the Pleasant Lake & Valley Irrigation Canal with occasional encroachment to 40'. This area will incorporate native grasses and will not be irrigated. Transition zones will occur to blend the irrigated landscaped area of the development to this buffer zone. The protected Apache Forest at the south portion of the site will be preserved and the proposed development will be approximately 235' from the 100' Apache Forest easement, thus allowing a 335' buffer zone to the south property line. The proposed future phase will still allow an approximate 160' buffer to the