square footage and type of construction being proposed.
Construction shall complV with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Accessibili : State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5.
Energy Code Use
1. Single Family; Duplex; Townhomes: 20121RC Chapter 11 or 2012 IECC Chapter 4.
2. Multi -family and Condominiums 3 stories max: 2012 IECC Chapter 4 Residential
Provisions.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC Chapter 4 Commercial
Provisions.
Fort Collins Amendments effective starting 2/17/2014. A copy of these requirements
can be obtained at the Building Office or contact the above phone number.
City of Fort Collins
Building Services
Plan Review
970-416-2341
features a color coded flowchart with comprehensive, easy to read information on each
step in the process. This guide includes links to just about every resource you need
during development review.
RESPONSE: Thank you
5. This development proposal will be subject to all applicable standards of the Fort Collins
Land Use Code (LUC), including Article 3 General Development Standards. The entire
LUC is available for your review on the web at
http://www.colocode.com/ftcollins/landuse/begin.htm.
RESPONSE: Thank you
6. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development
proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply
for a Modification of Standard.
RESPONSE: No modifications are anticipated
7. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
RESPONSE: Thank you
8. The request will be subject to the Development Review Fee Schedule that is available in
the Community Development and Neighborhood Services office. The fees are due at the
time of submittal of the required documents for the appropriate development review
process by City staff and affected outside reviewing agencies. Also, the required
Transportation Development Review Fee must be paid at time of submittal.
RESPONSE: Fees are included in this submittal
9. When you are ready to submit your formal plans, please make an appointment with
Community Development and Neighborhood Services at (970)221-6750.
RESPONSE: Thanks you
Pre -Submittal Meetings for Building Permits
Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on
in the design, that the new commercial or multi -family proiects are on track to complying
with all of the adopted City codes and Standards listed below. The proposed project
should be in the early to mid -design stage for this meeting to be effective and is typically
scheduled after the Current Planning conceptual review meeting.
Applicants of new commercial or multi -family projects are advised to call 970-416-2341
to schedule a pre -submittal meeting. Applicants should be prepared to present site
4. Contact Light & Power Engineering @ 970-221-6700 with questions/concerns or to
discuss power needs or go to the following link.
http://www.fcgov.com/utilities/business/builders-and-developers
Planning Services
Contact: Jason Holland, 970-224-6126, 0holland@fcgov.com
The elevations for the 5-plex and 6-plex must meet the City's building variation standards.
These standards were updated in 2014 and are now applicable to both multi -family and
single-family attached buildings. The standard is outlined in LUC 3.8.30(F) and 3.5.2(C)
(2) and we would suggest being familiar with the details of code narrative.
The updated standards clarify that developments not only need at least three distinctly
different building footprints, but that there shall also be no similar buildings placed next to
each other along a street or street -like private drive. Building designs are now required to
be further distinguished by including unique architectural elevations and unique entrance
features, within a coordinated overall theme of roof forms, massing proportions and other
characteristics.
The implication of this standard is that the two 5-plex and two 6-plex buildings would need
to have variation where they're adjacent to one another along La -Fever and along
Northern Lights. To achieve noticeably different variation we would suggest making one of
each building with brick, and one of each with stone, and in addition, adding distinctive
details to the building entrances so that the change in material is not the only distinctive
feature. The reason for the "no similar adjacent buildings" requirement is to ensure that
the overall master -planned building variation (at least 3 building footprints) that is seen in
plan view is also noticeable in the street view.
RESPONSE: Elevations are included and match the previous approved Morningstar buildings
2. Please be aware that there maybe issues with emergency access for the 6-plex buildings
to the east. If the garage alleys are needed for access, typically the limit for dead-end
drive aisles is 150 feet and a wider access is required for 3-story buildings.
RESPONSE: East side is shown as a loop road.
3. The proposed development project is subject to a Type 1 review and public hearing, the
decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant
for this development request is not required to hold a neighborhood meeting for a Type 1
hearing, but if you would like to have one to notify your neighbors of the proposal, please
let me know and I can help you in setting a date, time and location for a meeting.
Neighborhood Meetings are a great way to get public feedback and avoid potential
hiccups that may occur later in the review process.
RESPONSE: Thank you
4. Please see the Development Review Guide at www.fcgov.com/drg. This online guide
County Urban Area Street Standards (LCUASS). They are available online at:
hftp://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
RESPONSE: Acknowledged
8. This project is responsible for dedicating any right-of-way and easements that are
necessary for this project.
RESPONSE: Acknowledged
9. A Development Agreement will be recorded once the project is finalized.
RESPONSE: Acknowledged:
10. A Development Construction Permit (DCP) will need to be obtained prior to starting any
work on the site.
RESPONSE: Acknowledged
11. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending
on -site parking design.
RESPONSE: Acknowledged
Department: Electric Engineering
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
1. Light & Power has existing electric facilities along the North side of Precision Dr.
between Brookfield and Northern Lights; and as far North as the existing clubhouse.
Electric would need to be extended North along Brookfield and along Northern Lights to
feed this development. Any modification or relocation to existing electric facilities will be
at the applicants expense.
RESPONSE: Acknowledged
2. Electric Capacity Fee, Building Site charges and system modification charges where
applicable will apply.
RESPONSE: Acknowledged
3. Coordinate transformer and meter locations with Light & Power Engineering.
Transformers will need to be within 1 Y of an all weather drive over surface accessible by
a line truck. Meters need to be ganged on one end of the building.
RESPONSE: Acknowledged
Growth Area, hydrants to provide 1,000 gpm at 20 psi residual pressure, spaced not
further than 400 feet to the building, on 800-foot centers thereafter.
RESPONSE: Acknowledged
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of
building permit. Please contact Matt Baker at 224-6108 if you have any questions.
RESPONSE: Acknowledged
2. The City's Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see:
hftp://www.fcqov.com/engineering/dev-review.php
RESPONSE: Acknowledged
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of
this project, shall be replaced or restored to City of Fort Collins standards at the
Developer's expense prior to the acceptance of completed improvements and/or prior
to the issuance of the first Certificate of Occupancy.
RESPONSE: Acknowledged
4. All public sidewalk, driveways and ramps existing or proposed adjacent or within the
site need to meet ADA standards, if they currently do not, they will need to be
reconstructed so that they do meet current ADA standards as a part of this project. The
existing driveway will need to be evaluated to determine if the slopes and width will meet
ADA requirements or if they need to be reconstructed so that they do.
RESPONSE: Acknowledged
5. The existing plans are expired. New utility plans for the design of the adjacent unbuilt
streets, utilities within the streets, utilities serving the site, access and grading and
drainage.
RESPONSE: Utility plans included
6. The existing plat remains valid, but a replat can be filed if you are wishing to modify lot
lines or add additional lots. Anew plat would only include the property owned by the
developer under this proposal and would not replat existing dedicated right-of-ways.
RESPONSE: Replat included.
7. Any public improvements must be designed and built in accordance with the Larimer
please refer to the City's website where additional information and links can be found at:
http://www.fcgov.com/uti I ities/what-we-do/stormwaterlsto rmwater-quality/low-im pact-dev
elopement
RESPONSE: 25% pervious pavement is being proposed. 50% of impervious area is
proposed to be treated by LID
3. The city wide Stormwater development fee (PIF) is $7,817/acre ($0.1795 sq.-ft.) for new
impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review
fee. No fee is charged for existing impervious area. These fees are to be paid at the
time each building permit is issued. Information on fees can be found on the City's web
site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees or contact Jean Pakech at 221-6375 for questions on fees. There is also an
erosion control escrow required before the Development Construction permit is issued.
The amount of the escrow is determined by the design engineer, and is based on the
site disturbance area, cost of the measures, or a minimum amount in accordance with
the Fort Collins Stormwater Manual.
RESPONSE: Acknowledged
Department: Fire Authority
Contact: Jim Lynxwiler, 970-416-2869, iynxwiler@poudre-fire.org
1. FIRE ACCESS
As long as the change in building architecture does not result in a building greater than
30 feet in height, no additional changes for fire access would be required. Refer to
Appendix D, Section D105 of the 2012 IFC for more detailed information.
RESPONSE: Acknowledged
2. EMERGENCY ACCESS EASEMENT
Were Emergency Access Easements provided for as part of the original approval of the
site? If so, it appears the limits of the EAE will need to be re -adjusted in some areas. If
no easements have been recorded, that provision will be required at this time, as part of
the approval of the replat. The 8 unit building on the west side, requires an EAE to be
within access and the two, drive aisles on the east side of Northern Lights Drive, which
serve the three, 6-unit buildings will also require and EAE.
RESPONSE: Emergency Access easements are proposed as requested.
3. WATER SUPPLY
Fire hydrant spacing and flow must meet minimum requirements based on type of
occupancy.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide
1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building,
on 600-foot centers thereafter.
> IFC 508.1 and Appendix B: RESIDENTIAL REQUIREMENTS: Within the Urban
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sbovle@fcqov.com
1. There are proposed water mains in Northern Lights Drive and Le Fever Drive shown in
the Brookfield PUD that will need to be installed with this development. For sewer
service, this site is being served by the South Fort Collins Sanitation District.
RESPONSE: Acknowledged
2. Any mixed use components of this development will be required to provide separate
water and sewer services for any commercial use and the residential use.
RESPONSE: Acknowledged. None are proposed.
3. The water conservation standards for landscape and irrigation will apply. Information on
these requirements can be found at: http://www.fcgov.com/standards
RESPONSE: Acknowledged
4. Development fees and water rights will be due at building permit.
RESPONSE: Acknowledged:
Department: Traffic Operations
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcqov.com
1. No changes or issues anticipated related to traffic operations due to the change from
the approved plan.
RESPONSE: Acknowledged — TIS has been waived
Department: Stormwater Engineering
Contact: Shane Boyle, 970-221-6339, sbovle@fcgov.com
1. It appears this proposed development is generally following the drainage design of the
Brookfield PUD. If this is the case, a drainage letter indicating compliance along with
supporting calculations should be sufficient.
RESPONSE: Drainage letter is provided.
2. Low Impact Development (LID) requirements are required on all new or redeveloping
property which includes sites required to be brought into compliance with the Land Use
Code. These require a higher degree of water quality treatment for 50% of the new
impervious area and 25% of new paved areas must be pervious. For more information
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
March 23, 2015
Jason Sherrill
Landmark Homes
1170 West Ash St
Suite 100
Windsor, CO 80550
Re: Brookfield Replat
Description of project: This is a request to replat a portion of the Brookfield Plat/FDP. The
proposal calls for changes to 2 building types from the previously approved Brookfield
FDP. The stacked ranch condos from the original FDP will changed to townhome style
condos. The parcels are located in the Harmony Corridor (HC) zone district. This project
will be subject to Administrative (Type 1) review.
Please see the following summary of comments regarding the project request referenced
above. The comments offered informally by staff during the Conceptual Review will assist you
in preparing the detailed components of the project application. Modifications and additions
to these comments maybe made at the time of formal review of this project. If you have any
questions regarding these comments or the next steps in the review process, you may contact
the individual commenter or direct your questions through the Project Planner, Jason Holland,
at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
1. LUC 3.2.1 A landscape plan is required. There is a landscape setback for vehicle use
areas along public right-of-way.
RESPONSE: Landscape Plan included
2. LUC 3.2.2 Pedestrian access will need to be shown from building entries to public right
and trail system.
RESPONSE: Connections are shown as much as possible. Elevation differences
preclude some connection points.