HomeMy WebLinkAboutNIX FARM NATURAL AREA FACILITY - PDP/FDP - 10-01 - CORRESPONDENCE - REVISIONS• The phase II sanitary sewer line has been removed from this set per meeting with Katie Moore and Jeff Hill on Wednesday 8/1/01. Stormwater • Note was removed. • The reseeding and mulching are shown on landscape plan provided by Jim Sell Design. • The cost estimate was not revised because the dollar amount shown for reseeding/mulching ($655.00) is higher than what is required by the city ($615.00/acre) per conversation with Bob Zackely on August 14, 2001. I have enclosed four sets of revised drawings, one copy of revised cost estimate, and original redlined drawings for your review and approval. If you have any questions or need additional information, please contact me at 970.491.9888. Sincerely, /XAiA ��dJ/Gh Randall K. Provencio Project Manager cc: Steve White, City of Fort Collins Mark Sears, City of Fort Collins Dave Klockeman, JR Engineering. X: 902327 / Corresp / Letters / agencyletter2 August 13, 2001 Mr. Cameron Gloss City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522 Re: Nix Farm Natural Areas Facility Dear Cameron: J•R ENGINEERING A Subsidiary of Westrian We have revised the PDP drawings and drainage report per your latest correspondence July 9 and 17, 2001. The following correspond to your comments: Water/Wastewater • The note was removed per meeting with Jeff Hill on Wednesday 8/1/01. • All sewer/water lines that are being abandoned have been identified. • All fittings and valves on the proposed water line have been identified. • The proposed sanitary sewer horizontal alignment will remain unchanged per meeting with Jeff Hill on Wednesday 8/1/01. • In order to obtain 18-inches clearance between the proposed 8-inch sanitary sewer line and the existing 24-inch storm pipe, and maintain a design slope of 0.45% (we prefer not to design at absolute minimum 0.4% slope), the proposed 8-inch sanitary sewer line invert is approximately 0.5-feet from crown of existing 42-inch sanitary sewer. • See landscape plan by Jim Sell Design. Engineering • Note 1 on utility plan was corrected. • The plat was revised per your redline comments on drawings. • Street repair notes were added per your redline comments on drawings. • Driveway note was added per your redline comments on drawings. • Standard drawing detail 9-02 and additional notes were added per your redline comments on drawings. • Standard drawing detail 9-02 was added. • The chip seal specifications are shown on the sheet. • The radii have been worked out and approved per Ron Gonzales of PFA. • The phase Il sanitary sewer line has been removed from this set per meeting with Katie Moore and Jeff Hill on Wednesday 8/1/01. Notes were added for clarity per meeting with Katie Moore on Wednesday 8/1/01. Building labeling were revised. • A note was added to the water line for clarification. 2620 East Prospect Road, Suite 190, Fort Collins, CO 80525 X: 902327 / Corresp / Letters / agencyletter2 970-491-9888 • Fax: 970-491-9984 • w jrengineering.com