Loading...
HomeMy WebLinkAboutNIX FARM NATURAL AREA FACILITY - PDP/FDP - 10-01 - CORRESPONDENCE -18.Stormwater Utility (Glen Schlueter 221-6681): Comments will be forwarded to the applicant as soon as they are available. 19. Post Office: No requirements. 20.Poudre Fire Authority (Ron Gonzales 221-6570): Comments will be forwarded as soon as they are available. Note: Please return all redlined plans at the time of resubmittal. If you have any questions about these or any other issues related to this project, or require additional information, please feel free to call me at 221- 6750. Sincerely, Cameron Gloss, AICP Current Planning Director 4 9. Transfort (Gaylen Rossiter): No requirements. 10. Streets (Beth Sowder): No comments. 11. Traffic Operations (Eric Bracke 221-6615): No requirements. 12. Engineering Department (Katie Moore 221-6765): Please see attached comments and redlined plans. 13. Zoning (Gary Lopez 221-6134)): Please see attached comments. 14. Natural Resources (Doug Moore 221-6750): a. The two existing Colorado Blue Spruce have been reviewed by Tim Buchanan, City Forester and are in good condition and are considered significant and may not be removed. b. The existing Aspen and Rocky Mountain Junipers are in poor condition and are not considered significant and may be removed. Since these trees are not considered significant they will not need to be mitigated and a mitigation plan is not needed. 15. Water Conservation (L. Audney): No requirements. 16. Forestry (Tim Buchanan): The two existing Colorado Blue Spruce trees west of the house are in good condition and a desirable species and are significant for this review. One of the trees is shown as being "removed" for non -construction - related reasons. 17. Park Planning (Craig Foreman 221-6618): No comment. 3 Resubmittal Deadline Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by June 19, 2001. A 30-day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the some timeline. I 2. Advance Planning (Clark Mapes 221-6376): Please refer to the attached redline plans for comments and suggestions. 3. Water and Wastewater (Jeff Hill 221-6674) Please refer to the attached comments and redlined plans. 4. (Light and Power (Doug Martine 221-6700): (Applicant needs to coordinate power requirements, availability and costs with Light and Power Engineering. 5. 1 Public Service Company (Jim Hildulward): Gas will be served off Timberline Rd. along 42' access and utility easement. 6.1 AT&T Digital (Dennis Greenwalt): No comment. 7., Building Inspection (Rick Lee 221-6760): Please see attached comments. 8. Transportation Planning (Tom Reif 221-6608): a. Make the trail connection to the Poudre River Trail system. b. Provide for an easement for the future 8 foot -wide bike/pedestrian path proposed on the southeastern edge of the property line. The alignment has not been identified, but will parallel the Great Western Railroad line and connect to Hoffman Mill Rd. c. Continue bike lanes along the main accessway to the bike parking facilities. 2 City of Fort Collins Commu / Planning and Environmental' vices Current Planning STAFF REVIEW COMMENTS Matt Blakely March 20, 2001 Jim Sell Design, Inc. 153 W. Mountain Ave. Fort Collins, CO 80524 i City staff and referral agencies have reviewed your submittal for the Nix Farm Natural Areas Facility POP, and offer the following comments. The comments reflect analysis of the proposal relative to the General Development Standards and District Standards of the Land Use Code, and those adopted codes and policies of the respective referral agencies. i COMMENTS: 1. Current Planning (Cameron Gloss 221-6750): I a. Fence Details Please provide elevations of proposed fences surrounding the maintenance building. The fence design and materials should reflect, in its form and materials, the vernacular design of the new building. b. Neighborhood Meeting A neighborhood meeting has been scheduled for Monday, March 26, I 2001 at the Nix Farmhouse to discuss the application with neighbors and allow them to discuss their concerns. Staff will provide a summary of the meeting discussion to the Hearing Officer at such time that the proposal is scheduled for a public hearing. 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020